TPF-C Architecture Trade A route map for the next few years Charley Noecker Ball Aerospace & Technologies Corp 28 August 2006.

Slides:



Advertisements
Similar presentations
Clustering Clustering of data is a method by which large sets of data is grouped into clusters of smaller sets of similar data. The example below demonstrates.
Advertisements

Imbalanced data David Kauchak CS 451 – Fall 2013.
End-of-Course and Common Exams: Grading Rationale and Delay Parent Advisory Council January 22, 2013.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Spreadsheet Models for Managers: Session 5 5/1 Copyright © Richard Brenner Spreadsheet Models for Managers Session 5 Course Project Proposals.
What do you already know about rubrics? What do you want to know?
1 Single Indicator & Composite Measures UAPP 702: Research Design for Urban & Public Policy Based on notes by Steven W. Peuquet. Ph.D.
Item Analysis What makes a question good??? Answer options?
The New Product Development Process Concept Screening February 13, 2007.
Stepping Forward Population Objectives Partners in Flight Conservation Design Workshop April 2006 and Delivering Conservation.
New Hampshire Enhanced Assessment Initiative: Technical Documentation for Alternate Assessments Standard Setting Inclusive Assessment Seminar Marianne.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Assigning Metrics for Optimization. Evaluation Measures Each evaluation measure (EM) is a category by which an option is ranked/graded –Example: A car.
Who would be a good loanee? Zheyun Feng 7/17/2015.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Logic and Problem Solving Advanced Computer Programming.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
MYP Personal Project January 2014.
Your Quiz 1) Name the process groups. 5 pts 2) What are the 4 areas of the Balanced Scorecard? 8 pts 3)Name 4 of the Knowledge Areas 4 pts 4) If someone.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
 How to choose the best concept?  How to decide as a team?  How to document the process?
Concept Evaluation/Selection Dept. of Aerospace Engineering IIT Bombay AE 207 Introduction to Engineering Design.
Concept Evaluation and Selection… Integrated Product and Process Design ME En 475/476.
The Staff Study Individual Requirement Introduction and Overview.
Outreach & Recruitment Strategies March 10 th, :00 – 2:30PM (EST)
Chapter 14: Fair Division Part 5 – Defining Fairness.
Chapter 7 Measurement and Scaling Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Quality Software Project Management Software Size and Reuse Estimating.
Lecture : 5 Problem Identification And Problem solving.
Learning Targets January 21, 2008 Londa Richter & Jo Hartmann TIE.
FORS 8450 Advanced Forest Planning Lecture 6 Threshold Accepting.
Guide to Options Comparison Revision of the SAFEGROUNDS Guidance James Penfold, Quintessa SAFESPUR, 4 October 2007.
ASSESSMENT TOOLS DEVELOPMENT: RUBRICS Marcia Torgrude
Problem Solving Skills
MAVILLE ALASTRE-DIZON Philippine Normal University
Model Calibration and Weighting Avoid areas of… High Housing Density Far from Roads In or Near Sensitive Areas High Visual Exposure …what is “high” housing.
Questionnaire Design Prepared by: Ali Abdallah Islamic university of Lebanon Economics and Business Adm. MBA – 2015/2016 SPSS.
Assessment and Alignment of Curriculum Session 3 Assigned reading chapter 5 and 6.
1. WHAT IS A PROJECT? “A project is a problem scheduled for solution.” This definition forces us to recognize that projects are aimed at solving problems.
Access Grading Briefing Assessment requirements. Why these requirements? To ensure that: grades, credits and Access to HE Diplomas are awarded on an equivalent.
Stage 1 Integrated learning Coffee Shop. LEARNING REQUIREMENTS The learning requirements summarise the knowledge, skills, and understanding that students.
Albemarle County’s Departmental Assessment Process Who, What, When and How? Lori Allshouse, County Executive Department John Freeman, Department of Social.
1 Chapter 2 SW Process Models. 2 Objectives  Understand various process models  Understand the pros and cons of each model  Evaluate the applicability.
PSY 325 AID Education Expert/psy325aid.com FOR MORE CLASSES VISIT
Understanding Customer Relationships Bob Hogg Senior Examiner Assignment brief December 2013 / March 2014.
Federal Courts= Supreme Court & Lower Courts
Leveraging Evaluative Metrics And Developing Tactical Interventions that Maximize Program Impact: A Real World Example Presented October 27, th.
Hamilton Port Authority
Understanding Standards: Nominee Training Event
Analysis Manager Training Module
Well Trained International
Management & Planning Tools
PROBLEM SOLVING June 2010 CANADIAN COAST GUARD AUXILIARY - PACIFIC.
Introduction to Fashion and Textile Technology
Gearing Up.
Request for Proposal - Best Value
Decision Matrices Business Economics.
L6 Entrepreneurship Assignment 2017 – 2018
Taking Charge of Your Health
Putting Knowledge into Practice
Request for Proposal - Best Value
Annual Professional Development Conference
NAEP Assessment Question Tool
Delivering Conservation
Chapter 7 Concept Selection
Selecting a Solution Path
Selecting a Solution Path
IDEA Student Ratings of Instruction
Choose the best soltution Design Process Presentation Name Course Name
AP Human Geography FREE-RESPONSE
Was the development of agriculture good for humans?
Presentation transcript:

TPF-C Architecture Trade A route map for the next few years Charley Noecker Ball Aerospace & Technologies Corp 28 August 2006

24 Sept 2006TPF-C architecture trade process2 Goals of this presentation Describe a process and documentation practice to organize the decisions we need to make –Telescope size –Starlight Suppression System (SSS) –Wavefront sensing and control approach Begin the list of specific candidates –Examples of how specific they should be Begin the list of evaluation criteria –Identify useful metrics

24 Sept 2006TPF-C architecture trade process3 This week we will Approve a process (like this one?) Agree on the list of criteria Agree on the list of candidates –As complete as possible –Later additions and modifications are expected Assign action items to begin assessing metrics

24 Sept 2006TPF-C architecture trade process4 This week we will not Complete the analysis of metrics or Begin the scoring Make any actual decision among possible architectures Take potshots at each other’s concepts Perform detailed design (except on your own time) Hoard innovations that could benefit another architecture –“Mix and match” will benefit planet finding

24 Sept 2006TPF-C architecture trade process5 Trade matrix features Decision statement: clear, concise, complete. –Identifies full scope of the question; get everyone thinking at the same level Options: Brief identifier for each candidate. Details provided elsewhere Musts: All of the pass / fail criteria. (Expect all realistic candidates to “pass”.) –Metrics may be shown for support Discriminators: all of the better / worse criteria –All the ways we can compare the merits of each option

24 Sept 2006TPF-C architecture trade process6 Trade matrix scoring Metrics –Quantify important characteristics of candidates — things that we “value” Scores –Subjective (numeric) ratings based on those metrics, range 0-10 Weights: –Declare how important each discriminator is to us Subweights –Relative weighting of metrics contributing to single discriminator

24 Sept 2006TPF-C architecture trade process7 Combining scores Totals show a numeric rollup of all our judgments This arithmetic is “truthy” –Conveys a false sense of truth or authority Really it’s only a tool we use by choice Authority comes from our choices and how we defend them

24 Sept 2006TPF-C architecture trade process8 Final negotiation The real meat of the decision is captured in our choices for –Scores—Weights –Algorithms in the spreadsheet So now we reassess: –Does each discriminator have the right importance in the result? –Could reasonable tweaks in weights and scores change the answer? –Did we leave out something important? Do we all believe the answer we’re getting? Adjust scores and weights until we reach a consensus view

24 Sept 2006TPF-C architecture trade process9 Common scoring practices Example from a similarly large-scale TPF-I architecture trade –Scoring meeting: 9-10 December 2004 (alpha-lib:Collection-24885)alpha-lib:Collection Linear relationship was used for 55 of 56 discriminators –Choose linear relation between scores and the metric –Define top score to be 10 –Choose lowest score by mean, median, or mode of a vote Nonlinear relationship chosen once –Curve gives score vs. star counts –Score = 0 for <100 stars –Next 60 stars have a high value –Lower value per star beyond that

24 Sept 2006TPF-C architecture trade process10 Features / benefits Acknowledges subjectivity of decision making, but keeps it grounded in analysis –Numbers and arithmetic reflect our judgments, or we change them Scoring by a group: balance many opinions, differing expertise Transparently documents the decision –Factors considered–Metrics used –Value judgments–Importance judgments Robustness of the result –Decision stands on all judgments taken together Simplifies re-evaluation with new concepts / data