Brief Review and Expectation Asian Monsoon Years (AMY) Brief Review and Expectation Guoxiong WU 26 January, 2008 Yokohama, Japan.

Slides:



Advertisements
Similar presentations
Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
Advertisements

UK-Russia Climate Change Collaboration: Project Update Sarah Winne 12 February 2008.
Prioritized New Research Initiative on Climate Change in Japan - under a new phase of the Science and Technology Basic Plan – Hiroki Kondo Special Advisor.
(The Global Programme of Research On Climate Change Vulnerability, Impacts and Adaptation) Adaptation Knowledge Day V: Climate Change Adaptation Gaps BONN,
AMY: (WHERE ARE WE GOING AND HOW WILL WE KNOW WHEN WE ARE THERE?) Rick Lawford.
Observation Plans in Indian Ocean Jianping Li 1), Yu Weidong 2) and Guoxiong Wu 1) 1) LASG, Institute of Atmospheric Physics (IAP), Chinese Academy of.
BELMONT FORUM E-INFRASTRUCTURES AND DATA MANAGEMENT PROJECT Updates and Next Steps to Deliver the final Community Strategy and Implementation Plan Maria.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
‘Approaches to programme planning and budgeting’ Experience of Regional Centre for the Safeguarding of Intangible Cultural Heritage in South-Eastern Europe.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
2008 Intensive Observation Period in Arid/Semi-arid China—MAIRS Contribution to AMY Ailikun, Congbin FU International Program Office of MAIRS Chinese Academy.
Strengthening Our Collective Impact: Developing A Strategic Plan for CMHA National Conference Workshop Materials Kelowna, British Columbia September, 2011.
Update on the U.S. Climate Change Science Program UN Framework Convention on Climate Change Subsidiary Body Meeting June 21, 2004 Linda V. Moodie Senior.
Project Overview, Objectives, Components and Targeted Outcomes
General strategy. Introduction Global “financial crisis” Beginning to cascade into GBIF Now thinking about the forward strategy and next work programme.
Office of the Federal Coordinator for Meteorology OFCM Opening Remarks and WG/WIST Activities Update Paul Pisano Mike Campbell WG/WIST Cochairs June 6,
International CLIVAR Working Group for Seasonal-to- Interannual Prediction (WGSIP) Ben Kirtman (Co-Chair WGSIP) George Mason University Center for Ocean-Land-Atmosphere.
General Discussions 2-(1) There will be good observation collaborations in AMY(IMY) 2008 among international and domestic research projects: MAHASRI, CEOP,
GHP and Extremes. GHP SCIENCE ISSUES 1995 How do water and energy processes operate over different land areas? Sub-Issues include: What is the relative.
New Progresses of Monsoon Asia Integrated Regional Study (MAIRS) Ailikun Congbin FU MAIRS IPO Institute of Atmospheric Physics Chinese Academy of Sciences.
Summary Report of Working Group on Impacts Project ABC Science Team Meeting April 5, 2005 UNEP-Tongji Institute, Shanghai.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Decadal Climate Variability and Predictability Discussion of CLIVAR Research Focus Pan-CLIVAR Meeting, July 16-18, 2014.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Dr L. P. Riishojgaard, WIGOS Project Manager WMO Secretariat, Geneva WMO; OBS.
Observation Plans in West Pacific Jianping Li 1), Guoxiong Wu 1) and Fan Wang 2) 1) LASG, Institute of Atmospheric Physics (IAP), Chinese Academy of Sciences.
Modeling coordination T. Satomura Kyoto University.
WMO Cliquez pour ajouter un texte GLOBAL CRYOSPHERE WATCH CryoNet Asia Workshop in Beijing, China - Report - CryoNet Team Meeting, Reykjavik, Iceland
Innovative Program of Climate Change Projection for the 21st century (KAKUSHIN Program) Innovative Program of Climate Change Projection for the 21st century.
Joint Canada-Mexico-USA (North American*) Carbon Program Planning Meeting January 25–26, 2007 *By North America we mean the North American land, adjacent.
What is GEO? launched in response to calls for action by the 2002 World Summit on Sustainable Development, Earth Observation Summits, and by the G8 (Group.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
CPPA Past/Ongoing Activities - Ocean-Atmosphere Interactions - Address systematic ocean-atmosphere model biases - Eastern Pacific Investigation of Climate.
APEC Climate Center Data Service System Chi-Yung Francis Tam APCC.
UK Environmental Observation Framework.
Global Terrestrial Observing System linking the world’s terrestrial monitoring systems to provide a global vision of the Earth we share.
IndOOS—a sustained ocean observing system in the Indian Ocean for climate research Howard Cattle for Gary Meyers Co-Chair CLIVAR/GOOS Indian Ocean Panel.
JCOMM Services Program Area Working together beyond GODAE for Operational Oceanography Dr. Craig Donlon JCOMM Service Programme Area Coordinator The Met.
EXTREMES AND CEOP. Extremes … Background: A fundamental aspect of the water and energy cycle is the occurrence of extremes. Big Issues: 1. How can we.
Change of program Implementation Plan. T. Satomura Current status of and contribution by NICAM. T. Matsuno & T. Nasuno (~ 20 min) Comments. J. Shukla Discussion.
AMY Some concluding remarks Howard Cattle. AMY AMY brings together some 21 regional projects plus other national and international programme contributions.
CLIVAR (Climate Variability and Predictability) CLIVAR is an interdisciplinary research effort within the World Climate Research Programme (WCRP) focusing.
World Climate Research Programme Joint Scientific Committee – 31 Antalya, Turkey.
EU Urban Agenda. Overall picture Our objective is SUSTAINABLE URBAN DEVELOPMENT To do so, we need… … a vision,… We provide:  Global Urban Agenda (Habitat.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Fourth IABIN Council Meeting Support to Building the Inter-American Biodiversity Information Network.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
ESPON Workshop at the Open Days 2012 “Creating Results informed by Territorial Evidence” Brussels, 10 October 2012 Introduction to ESPON Piera Petruzzi,
17 Sep 2012 Martin Visbeck and Jim Hurrell Co-Chairs, CLIVAR SSG GEWEX SSG October 2012 CLIVAR (Climate Variability and Predictability) Asian-Australian.
Overview of WIGOS activities in RA-IV Curaçao 2 December 2015.
Action 12:Internal Monitoring BMW Regional Assembly.
The Global Cryosphere Watch Jeff Key NOAA/NESDIS, Madison, Wisconsin USA South America GCW Meeting, Santiago, October
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
LGA Planning Conference 26 January 2006 DELIVERING LDFs : A CROSS- SECTORAL PERSPECTIVE Kay S. Powell Secretary, National Planning Forum National Planning.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
PPAI Decadal Prediction/Predictability/Variability –Reviewed the WGCM/WGSIP Decadal Prediction Experiment –Reviewed/Revised Decadal WG Prospectus Reviewed.
Ocean Carbon and Biogeochemistry Scoping Workshop on Terrestrial and Coastal Carbon Fluxes and Exchanges in the Gulf of Mexico May 6-8, 2008 St. Petersburg,
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
Implementing the New JCOMM Marine Climate Data System (MCDS)
DPM Programme Office Databases to Support Information Sharing, Coordination, Crosscutting Project Development and Progress Monitoring James Douris DPM.
Review of RA-I 16th Session Resolutions related to
RA-II/Doc Implementation of the WMO DRR Roadmap in RA II including major activities on DRR Services Alasdair Hainsworth, Chief Disaster Risk Reduction.
Oceans and Society: Blue Planet
World Cover 2017 Conference
Overview of working draft v. 29 January 2018
Causes of improvements to NWP (1979 – 2009)
SIT Chair Priorities and SIT-33 Objectives
Enhancing WMO and CEOS COLLABORATION
Presentation transcript:

Brief Review and Expectation Asian Monsoon Years (AMY) Brief Review and Expectation Guoxiong WU 26 January, 2008 Yokohama, Japan

1st AMY Workshop Asian Monsoon Year 2008 (AMY08) International Workshop April 23rd-25th, 2007 Beijing, China

More than 50 scientists from 13 countries and regions are attending this workshop.

Session 1: Introduction of relevant programs – 1.5 days; Session 2: Coordinate the field experiments: observation sites, periods, variables and the need of Intensified Observation Periods (IOP); Session3: Discuss the data sharing, assembling, quality controlling and assimilation day; Session 4: Modelling and prediction –0.5 day; Session 5: IMY & Set up working groups and Scientific Steering Committee –0.5 day.  Self introduction  Agenda approval

Following the resolution of the First International Workshop on AMY’08 at Beijing, the Second AMY’08 workshop was held at Bali, Indonesia on September 3-4, The major objectives of 2nd workshop are to discuss and finalize the Science plan and Implementation Plan for AMY’08. 2nd AMY Workshop

mahasri.cr.chiba-u.ac.jp/ Jun Matsumoto & Bin Wang The 2nd AMY’08 Workshop at Bali, Indonesia, September 3-4, 2007 Kuta Beach in the morning of September 2, 2007 AMY’08 Science and Implementation Plan

AMY Some concluding remarks Howard Cattle

AMY  AMY brings together some 21 regional projects plus other national and international programme contributions. But what does AMY bring us?  At one level, AMY acts to provide communication between these facilitating interactions between them  Challenge is to meld AMY into a coordinated international programme rather than a loose collection of projects/activites - on way (this meeting)  Science plan - still work to do on observation, modelling and data management issues  How will AMY be delivered - need for focussed Implementation Plan

AMY Science Plan  Science Plan identifies a wide range of science questions; classified according to timescale (diurnal -> decadal) and against a number of science foci:  Science plan objectives which emerge are focused around:  Ocean-atmosphere interaction  Land-atmosphere interaction  Improve skill in seasonal to interannual prediction of the Asian monsoon  Development of a hydrometeorological prediction system and database  Human interactions with the monsoon  SSC plus Working Groups are against observations, modelling and data management  Doesn ’ t yet bring a fully coordinated science approach between inputs and objectives

Classification of projects 1.Continental hydroclimatology; land-atmosphere interactions and weather-monsoon interactions 2.Impact of the Tibetan Plateau 3.Aerosol/cloud/radiation/water cycle interactions 4.Ocean-atmosphere interactions; tropical cyclones 5.Monsoon prediction including climate trends 6.Interactions between human and natural components Plus contributions from wider national/international activities 1-3 above part of land surface interactions overall. Hydromet prediction system can be added in (MAHASRI)

Classification of Projects Hydroclimatolo gy, weather CEOP, SACOL, PRAISE, SCHeREX, SoWMEX/TiMREX, IITM/rain, CTCZ, STORM, MAHASRI/JEPP Tibetan PlateauITP/TORP JICA/Tibet AerosolsCEOP, SACOL, IITM/CAIPEX, JAMEX, EAST-AIRE & AMF, SMART-COMMIT, ARCS-ASia Ocean interactions AIPO, CTCZ, JEPP/IO, PALAU2008, TCS08 Monsoon prediction AAMP, APEC, CEOP, … Human interactions MAIRS; others link across Plus other National & International contributions

Implementation Plan strawman 1.Overall aims and objectives of AMY & key deliverables 2.Overall strategy for implementing AMY 3.How/do the project activities integrate? 4.Cross programme integrated modelling and observational programmes and data management 5.Links to international activities 6.Others …

IP - development  Finalize science plan - soon  Develop IP asap through e.g: A.SSC (Sections 1, 2, 5) B.Working groups (Sections 4) with feed in/interactions with: C. science area groups (Sections 3.4) each led by SSC member against mapping of projects to existing objectives or Land surface interactions Hydroclimatology, weather Tibetan Plateau Aerosols Ocean interactions Monsoon prediction Hydromet prediction system Human interactions  Timescale - over next few months?

AMY-08  AMY “ year ” 08/09  Many projects extend beyond this  Some have main phase on later timescale (e.g CTCZ)  What is vision beyond 08/09?  Should timeframe be extended? e.g  spin up period  09/010 main AMY year  consolidation phase  Logo?

AMY Logo prepared by AMY Office for selection

Data management and policy  DM presentation:  Agree data policy  Set agenda for pending issues  Distributed archiving  Include data assimilation and integration projects in science plan  Start editing provisional catalogue  Start survey of data needs  Redistribution issues including timescale for science project data release  Ocean and plateau data assimilation implementation  Role of APCC - hindcasts dataset; TFSP subset; AMY08 data depository  Need discussion of modelling data archiving

Observations  Coordinated observation effort over IMY  Category 1 data - operational observations coordinate within WMO framework; build central framework - through CEOP?  Category 2 data - Scientific observations - develop catalogue approach  Need to consider land-based and ocean-based data  Through science structure, observations group needs to identify observations required to deliver science “ observational convergence framework ” ; seek access to operational data through WCRP/WMO  Identify observational requirements for modelling for data assimilation/initialization & validation.  High resolution needed for e.g diurnal studies, parametrization development; satellite data needs to be identified  Importance of developing timetable and catalogue of observations through AMY period. Identify observational gaps (mapping), request increased observational effort through WCRP/WMO? … All requested to input (mechanism?).  QC plan and data integration -> DM plan

Data management and policy  Lot of issues identified - important area to start planning now  AMY08 complex “ project of projects ”  Data management plans for each project defined?  Build catalogue  Need discussion of model data archiving (e.g APCC)  Distributed system - effort for dataset integration needs to be considered  Quality checks - build on CEOP experiences; issue of spatial inhomogeneities  Password protected quick look data; set release dates for processed data; AMY participant priority  Provide example that may be valuable to AMY e.g GAME data or composite precipitation dataset?  Transfer to international data centres? Real time delivery

 Finalize the AMY SP and IP;  Activate Working Group Coordination;  bring coordinated science approach between inputs and objectives  Schedule the Activities in 2008/2009;  Discuss the Strategic Plan of IMS… 3rd AMY Workshop

Science Plan for Asian Monsoon Years ( )--- AMY (Revised, January ) Table of Content Summary 1. Introduction 1.1 Programmatic development 1.2 Participants 2. Background 2.1 Observational and process studies 2.2 Modeling and prediction 2.3 The monsoon environment and its future change 3. Science foci 3.1 Cross-cutting themes 3.2 Overarching science questions

4. Goals and objectives 4.1 The overarching goals 4.2 Objectives 5. Strategy 5.1 Balanced and integrated approach 5.2 Geographic foci and capacity building 5.3 Utilization of satellite observations 5.4 Organization 5.5 Collaboration and linkages 6. Planned activities 6.1 Observations 6.2 Data management 6.3 Modeling and prediction 7. Expectations