Page 1 Presentation to US WG on Space LIDARs Presented by A. Culoma, ESA/ESTEC Prepared by the Aeolus Project team in ESTEC Boulder,16-18 October 2012.

Slides:



Advertisements
Similar presentations
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Advertisements

Relex Reliability Software “the intuitive solution
Post Deflection Acceleration
Status of ADM-Aeolus Lars Peter Riishojgaard and Mike Hardesty.
Philippe Hering October 30, 2007 Drive Laser Commissioning Results and Plans 1 Drive Laser Commissioning results and plans Philippe.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
UV laser-induced damage to grazing- incidence metal mirrors M. S. Tillack, J. Pulsifer, K. Sequoia 4th US-Japan Workshop on Laser-Driven Inertial Fusion.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
October 16-18, 2012Working Group on Space-based Lidar Winds 1 AEOLUS STATUS Part 1: Design Overview.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
Status of the advanced LIGO laser O. Puncken, L. Winkelmann, C. Veltkamp, B. Schulz, S. Wagner, P. Weßels, M. Frede, D. Kracht.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused.
 CS 5380 Software Engineering Chapter 8 Testing.
Wind Lidar Working Group, Miami 6 Feb Status Martin Endemann.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Testing Basics of Testing Presented by: Vijay.C.G – Glister Tech.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
Nd:YAG Laser Power Cycling The Direct Detection Doppler Lidar uses a frequency tripled Nd:YAG laser, the same laser technology used in MOLA, GLAS, MLA,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
FEMTOSECOND LASER FABRICATION OF MICRO/NANO-STRUCTURES FOR CHEMICAL SENSING AND DETECTION Student: Yukun Han MAE Department Faculty Advisors: Dr. Hai-Lung.
OPS - SCC Workshop R&D Past and Present December 2, 2003 Jerry Rau - Panhandle Energy.
The investigation of optical inhomogeneities of the multilayer mirrors progress report Moscow State University Bilenko I.A
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Apr 17-22, NAOJ SOT optical performance Focus stability in orbit Y. Katsukawa (NAOJ) and SOT team.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Pathogen Reduction Dialogue Panel 3 Microbial Testing for Control Verification Robert L. Buchanan U.S. Food and Drug Administration Center for Food Safety.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GRAPHITE SUBLIMATION TESTS with Inert Gas Mitigation C. C. Tsai, T. A. Gabriel, J. R.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Contamination Analysis of Optical Telescope Assembly (OTA) April Electronic, Mechanical Components and Materials Engineering Group, Institute of.
LITHOGRAPHY IN THE TOP-DOWN PROCESS - BASICS
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Advances In Software Inspection
In-situ Thickness Measurements by Laser Reflectance for Improved MOCVD Process Development Pratheep Balendra Justin Daniel Meyer April 14, 1997 Senior.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
Failure Modes, Effects and Criticality Analysis
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
ET-ILIAS_GWA joint meeting, Nov Henning Rehbein Detuned signal-recycling interferometer unstableresonance worsesensitivity enhancedsensitivity.
Gayle K. Martin November 14, 2016
TEMPO Instrument Update
Presented by Jon Pastuszynski, Lead M&D Engineer
Reaching the Advanced LIGO Detector Design Sensitivity
Point Source Transmission Simulations on the COROT baffle
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Design of Stable Power-Recycling Cavities
Operations Department
ELIC Injector Working Group High-P, high-I source issues (DC)
GLAST Large Area Telescope
Drive Laser Facility Layout Drive Laser Architecture Technical Issues
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
Injector Drive Laser Technical Status
Presentation transcript:

Page 1 Presentation to US WG on Space LIDARs Presented by A. Culoma, ESA/ESTEC Prepared by the Aeolus Project team in ESTEC Boulder,16-18 October 2012 Aeolus Project – Status October 2012

Satellite Items under Development Page 2 Application SW In-situ Cleaning

Page 3 Summary of Status –Satellite: Ready for FM integration except the Aladin instrument and one panel of the platform where the In-Situ Cleaning System will be installed. –Platform: Central software is being updated to support the ICS and continuous mode operation of Aladin. Now delivered and under test on satellite test bench. –Aladin instrument: Work is ongoing on with the Transmit Laser Assembly (TXA) and integration of the sealed Transmit & Receive Optics (TRO). All three instrument electronic types (ACDM, DEU and TLE) have completed upgrade to support continuous mode operation. One of three laser electronics still to be completed. –Ground Segment: FOS (ESOC) and PGDS (ESRIN) developments completed and resources are kept in hibernation. End-to-end simulator, level 1B, 2A and 2B ground processors have been upgraded to support continuous mode operation. –Launcher: Preliminary Mission Analysis activities started for a baseline launch with VEGA (Verta2). Activities for a back-up opportunity on Rockot are on hold. VEGA qualification flight confirmed more severe shock environment requiring a shock test (VESTA) at satellite level and possibly delta-qualification unit level.

Page 4 Transmit Laser Electronic (TLE):  1 st & 2 nd FMs re-qualified for continuous mode and ready for use;  3 rd FM, anomaly discovered related to one of the amplifier drivers; Power Laser Head (PLH):  FM-A: completed endurance tests in vacuum, inspected, characterized for +/-1G and used for fluence reduction verification;  FM-B: integration restarted after both optical amplifiers been de- integrated, repaired and re-integrated; UV Optics:  Anti Reflective coatings from Laseroptik (AR4) found to have inadequate LIDT by refined screening technique recently in use at DLR. Alternative AR coating processes have not led to improvements, see more details later.  Effect of small imperfection spots on LIDT for High Reflective and Dichroic coatings from Laseroptik (HR4) are being investigated by test in ESTEC laser laboratory and DLR, see more details later. Laser Transmitter Development Status

To demonstrate that the TxA performances remain stable/controllable over 5 weeks of operation in near vacuum. The test focused on three main aspects of the PLH instability: 1.UV output energy 2.Optical evolution of the MO and amplified beams 3.Laser Induced Contamination To demonstrate compensation “procedures” over the instrument lifetime. FM-A Endurance Test in Vacuum: Objectives Page 5

FM-A Endurance Test in Vacuum: UV energy evolution Page 6

Most objectives fully reached: Laser Induced Contamination: has not been detected, oxygen partial pressure works fine Beam stability in vacuum: very good results on vertical pointing (the most critical), good results on horizontal pointing (stabilization reached after 20 days) The root cause of the UV energy reduction experienced in all previous vacuum test has been identified as divergence variation at the output of the amplifier section Laser output energy can be controlled: procedure demonstrated by acting on the heating currents of the amplifiers Three major Non-Conformance investigations are running:  Master oscillator bi-state characteristics  Amplifier temperature stabilization time (weeks or months)  UV optic damages FM-A Endurance Test in Vacuum: Conclusions Page 7

UV Optics Damages Page 8

UV Optics Damages SHG Page 9

UV Optics Damages SHG Input SHG Output THG Input THG Output Dichroic #1 Folding Mirror Dichroic #2 BEx 1 st lens input BEx 1 st lens output Folding Mirror Page 10

Top level activities, all in parallel (ref:AE-TN-ESA-AL-056): 1.Root Cause Analysis  Top-down analysis  Bottom-up analysis 2.Increased LIDT by Alternative Substrates and Coatings  Alternative substrate suppliers  Condition substrates prior to coating  Alternative coating suppliers  Improved coating processes 3.Fluence Reduction Activities  Beam expansion prior to UV section  Energy reduction 4.New UV Optics Procurement Road Map for UV Coating Remedial Page 11

Investigation of root-causes: top-down Coated optics design change  Coated optics process change/deficiencies  LIDT measurement overestimates threshold LIDT degrades with AIT of the assemblies LIDT degrades with number of shots (fatigue) LIDT degrades with time (aging)  Contamination lowers LIDT  In-situ 40Pa lowers LIDT  3 wavelengths combine to result in lower UV LIDT High fluence event Potential root causes for damage Page 12

LIDT Values for UV Mirrors Red curves: baseline supplier Other colors: alternative suppliers Page 13

LIDT Values for 3Dichroic in UV Blue curves: baseline supplier Other colors: alternative suppliers Page 14

UV Lenses: refined screening at DLR Requirement TT rules Page 15

Investigation of root-causes: bottom-up 1.Detailed inspection of damage features  Detailed inspections of optics by Selex and ESTEC  All damage features are similar and small (ø50 – ø100 m)  Evidence of very small precursors (ø1– ø3 m)  Some surfaces still outstanding, e.g. harmonic section 2.Compare damage feature with LIDT test samples  Damage morphologies are different between LIDT samples and endurance test optics  LIDT sample damages are catastrophic (typically half the beam diameter) with no sign of small precursors 3.Identify potential damage precursors:  Surface contaminants on coating  Residual polishing contamination on substrates  Small defects caused by arcing during coating 4.Chemically label potential precursors  Surface contaminants are coming from residual epoxy outgassing  AR substrate “contamination” is Cerium-oxide from the polishing powder  HR coating damages contains stainless steel components (Fe, Ni, Cr …) 5.Eliminate precursors by cleaning and/or process change  Initial cleaning trials of surface contamination, effectiveness still to be verified  Initial cleaning trials of substrate contamination, effectiveness still to be verified  Coating samples using mechanical shutter and adjusted process parameters, samples available for test  Coating samples using improved arcing suppression techniques (less power, more sensitive supervisor), samples still to be produced 6.Verify performance:  Replication of damage on endurance test samples, on-going  LIDT test by DLR on above AR samples, still to be done  Modified LIDT test by DLR on new HR samples (raster scan), still to be done  Accelerated life test on above samples, still to be done Potential root causes for damage Page 16

Beam Expansion Prior to UV Section SHG* BEX 1,4 BEX 1,2 Fluence > LIDT Fluence ~ LIDT Fluence < LIDT Output energy: 110mJ Page 17

Energy Reduction SHG* BEX 1,4 BEX 1,2 Fluence > LIDT Fluence ~ LIDT Fluence < LIDT Output energy: 80mJ Page 18

Page 19  Aeolus being a demonstrator mission must find balance between mission robustness and mission performance;  FM-A endurance test has re-confirmed that fluence is a critical parameter to be carefully controlled;  The Project is committed to fulfill the mission requirements, however: 1.Take advantage of performance margins in the beginning of the mission and run the laser at lower output power; 2.Exploit the redundant laser as a real mission resource, i.e. include the redundant laser in the commissioning phase, use as a “fresh asset” whenever deemed necessary; 3.Given 2, explore the limits of the nominal laser by compensating mission degradations through increased laser power;  A beginning of life operational scenario with a 80 mJ laser is fully compatible with the performance predictions of 2 m/s random error;  An end of life scenario is either to increase the laser energy to ~100mJ, with the risk of damage and switch to redundant laser, or accepting a graceful performance degradation to ~2.5 m/s random error; Mission robustness vs performance

Random Error Predictions (BoL) Page 20

Random Error Predictions (EoL) Page 21

Conclusions The endurance test of the first flight laser successfully demonstrated many key performance parameters However, small but unacceptable damages occurred on ~half of the UV optics The Project and the Industrial team is working intensively on many fronts in parallel to confirm root causes and adequate solutions As proven many times before, laser modifications are very time consuming (long lead times, re-alignment always starts from the MO, complex and long duration acceptance tests …) The mission remains worldwide unique in its technological content and the user communities are still convinced that the mission products will bring break-through in weather forecast and climate research. Page 22