The 20/20 Vision Report to the Board of Education January 2009.

Slides:



Advertisements
Similar presentations
WV High Quality Standards for Schools
Advertisements

What is District Wide Accreditation? Ensure Desired Results Improve Teaching & Learning Foster a Culture of Improvement A powerful systems approach to.
Critical Condition Triaging School Enrollment Growth School Board Work Study November 13, 2013.
A DAY IN PRE-K CLARKE COUNTY SCHOOL DISTRICT. Clarke County School District’s Vision Our vision is for all students to graduate as life-long learners.
An Alternative Elementary Configuration A Programmatically Progressive and Sustainable Structure.
Merger Study Grade Level Configurations Options and Rationale.
Community Perceptions of Westlake City Schools Citizen’s Advisory Committee April 2013.
CMSD Master Planning. KEY POINTS  No schools to close for several years  All funding is tied to enrollment counts  The Master Plan will be reviewed.
Dalton Local Schools “Our Opportunity” June 5, 2008.
Margaretville Central Superintendent’s Goals.
Good Morning! Hugh Gloster, Superintendent of Schools School District No. 23 (Central Okanagan) August 24, 2010 TIMING OF THE RUTLAND AREA GRADE CONFIGURATION.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA Academic Senate 19 JANUARY 2011.
The Swift School Strategic Plan – The Swift School Mission The mission of The Swift School is to prepare children with dyslexia and related.
Budget Committee’s Proposed Budget Oxford Hills School District FY 2014.
David G. Title August 26,  May, 2006 referendum included renovating 3 elementary schools at a total cost of $30 million  Under the original.
Planning for Secondary Growth DIPBLE nvironments CCRCTEL earning 2014RISDF lexible September 22, 2014.
Archdiocese of Boston Brockton Regional Proposal Presentation to Parents, Teachers & Staff January 28, 2007.
1 Your Health Matters: Growing Active Communities Partners.
“ Let’s Bond Together ” Issue 3 Expect….Believe….Achieve.
Special Board Workshop January 25, 2013 Kurt Madden, Superintendent of Schools.
Long Range Facility Planning assisted by Silver Falls School District.
STRATEGIC PLANS An Overview of Plans Within Maricopa.
Chicago Public Schools Community Planning Process Mid-South Communities Presentation for the MPC Roundtable February 12, 2004.
Building for the Future of Johnston Schools Forum for Public Feedback on September 11, 2012 Bond Referendum Monday, October 29, :00 PM Summit Middle.
City Council October 21, 2013 Strategic Planning Retreat Next Steps.
PANAMA-BUENA VISTA UNION SCHOOL DISTRICT
Cambrian School District October 27, 2011 Transitional Kindergarten Overview Planning for Long-Term Student Success Adapted from Lisa Kaufman, Ph.D. Director,
Missoula County Public Schools Overview of Planning January 2014.
February 9, 2012  Partner with the community  Provide an effective educational experience  Prepare every student to find success in our complex society.
Future PastPresent Change ~ and~ Challenge Planning for 2012 and Beyond Washington School District.
City of the Future Schools Presented to the Mayor’s 7 th District Roundtable Meeting Monday, June 19, 2006.
WELCOMEWELCOME. AGENDA – JANUARY 6, Welcome 2.Trustees Howard Goodman (Ward 8), Josh Matlow (Ward 11), and Maria Rodrigues (Ward 9) 3.Overview.
Development Committee School Usage and Building Recommendations Big Walnut School District Board of Education Meeting June 9, 2008.
Minneapolis Public Schools Board of Education Presentation August 23, Planning for Changing Enrollment 2010 US Census Data What Does It Tell Us.
Rick Wair’s Begin Here FACILITIES Condition of the Facilities Capacity of the Facilities Changing Educational Needs.
DeArmanville Elementary Kim Vivanco IL 622 Effective School Research.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
ACPS & City of Alexandria 1.  Long Range Educational Facilities Plan to improve facilities planning, accommodate the growing student population, and.
School Configurations Recommendations from the Instructional Services Division April 2008.
Sandusky City Schools’ Transformation Sub-Committee “The Future of School Facilities” Briefing Document for Community Forum.
Wapakoneta City Schools Imagine Building for the Next Generation: Maintain the Pride An Opportunity for our Communities.
Samantha Crawford Sigmon 170 Gaywood Drive Bassett, VA
M & M ELEMENTARY SCHOOL ARIZONA CITY, AZ SCHOOL BUDGET BY: TRACEY KLELL.
The Educational Facilities Plan For 21 st Century Learning Sandusky Kiwanis Club October 22, 2014.
Strategic Planning February 15,2012. Southwest Minnesota State University during the Academic year collected information from external constituencies.
Elementary Restructuring Committee School Visits.
Understanding Cultural Planning Considering a Cultural Plan for Erie and Niagara Counties Impact and Issues Presented to the Greater Buffalo Cultural Alliance.
Cainhoy-Daniel Island Community Committee Recommendation to the Superintendent January 4, 2014.
White Hill Super Sub FPAC Report. White Hill Team Structures Curriculum Personalization Targeted Academic Intervention Shared Best Practices Curricular.
Survey Basics This survey involved 300 completed telephone interviews with registered voters in the Prescott School District. All interviews were completed.
Strategic Plan Proposal The Challenge This strategic plan identifies what must be done, pre- school through grade 12, over the next three.
An Update on the Vision for the Education Facilities Plan for 21 st Century Learning Presentation to the Citizens of Sandusky, Ohio Wednesday, February.
 SMCSD Comprehensive Educational Program A Path for Excellence.
Wahoo Public School District Facility Planning Update April 18, 2016.
Vision 2020 Quality Schools in Every Neighborhood Report on LCAP Goal 5: Parent and Community Engagement April 26, 2016 Building the conditions to empower.
Valley View Local Schools SELF ASSESSMENT/STRATEGIC PLAN UPDATE MARCH 2016.
Warren Township Study To Examine Enrollment Project (STEEP) Education Committee Update March 7, 2016.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
UPDATE: 8/8/2011 Batavia City School District
Peninsula Conflict Resolution Center May 4, 2015
Brown Deer School District
System Goals Academic Excellence Educational Equity Social and Emotional Learning Improving and Expanding Facilities.
School #1 Ballot Question and Proposal
System Goals Academic Excellence Educational Equity Social and Emotional Learning Improving and Expanding Facilities.
Readington Township School District Budget Presentation
Unanimous Vote by the Board of Education
Staples Motley School District
Chimacum District Facility & Program Plan
FIRELANDS Local School District
Presentation transcript:

The 20/20 Vision Report to the Board of Education January 2009

Process Overview  Mission: to develop a clear, well-planned vision for providing and maintaining facilities that will support the Westlake City Schools’ mission to educate for excellence  While opinions may have differed, it is with confidence that everyone, regardless of affiliation, strongly agreed there is a problem with the District’s facilities that needs to be addressed responsibly and as soon as is feasible.

Vision 20/20 Committee  Committee made up of diverse group of community members  Met for nearly 3 months  Studied wide spectrum of facilities and enrollment data

Data-Driven Process Provided with a variety of historical data including:  Facility Study from the Ohio School Facilities Commission (OSFC)  Land Use Study by Lesko & Associates  Limited Internal Data (Land Use Study 2005)  Enrollment projection studies-Spring 2002 and Spring 2007  2007 enrollment projection update  2008 Lesko Facilities Assessment

Data-Driven Process (cont) Provided with current facility data including:  Facility Condition Comparison  Building Summary  Floor Plans and Site Layout  Enrollment Projections Report  District Expense Comparison  Expenditure Per Pupil (Cuyahoga County)  Election History  Grade Configuration Comparison  Option Comparison

Summary of 20/20 Meetings  During the 6 meetings committee members:  Analyzed and requested various data  Prioritized plans  Discussed pros and challenges for each plan  Listed important areas that needed to be considered for facilities  Debated each plan with strengths, weaknesses, opportunities and threats  Everyone, regardless of affiliation, strongly agreed there was a problem that needed to be addressed responsibly and soon.

Facility Plan Recommendation Narrowed 13 options to 2 and recommend both to the Board of Education for further study and consideration:  Option A: Five building grade-level configuration clustering grade levels (9-12, 7-8, 4-6, 2-3, and pre- K-1)  Option B: Six building regional elementary configuration (grade levels: 9-12, 7-8, 4-6, 2 schools as K-3, and 1 elementary as pre-K-3) Both plans move the 4 th graders to the intermediate school and call for a new high school and a renovated middle school with additions. The difference between the plans is in the elementary configuration.

Recommendations  The Committee identified these strengths, weaknesses, opportunities and threats but clearly believe that the strengths and opportunities outweigh any possible weakness or threats.

Option A Strengths & Opportunities  Best value, innovation and long term strategy  Advantages to grade level configuration  Synergy of instruction by the aligning of certification  Economic benefits of plan  Operational efficiencies  Age appropriate equipment  Properties available for other use  New buildings increase desirability of living and doing business in, and attracting families to Westlake  Brings District in line with surrounding schools and allows Westlake to compete  Collaboration among teachers  World class education with new technology, labs  Reduces duplication

Option A Weaknesses & Threats  Transportation considerations  Cost of plan  Questions about what happens with current property and facilities.  Interruption of athletics and extracurricular activities  Project LINK may be disrupted  Students will transition schools more  Previous maintenance of buildings  Change from neighborhood schools and loss of smaller buildings  Convincing the community of need  All buildings will age at the same time  Emotional connection/nostalgia about the buildings

Option B Strengths & Opportunities  Design for the 21st century  Better educational opportunities and flexibility  Familiar concept/proven success  Improvement on the status quo  Smaller learning communities and community pride  Opportunities to partner in the community  Operational efficiencies  Leadership issue with older students working with younger students  Properties available for other use  Ability to have multipurpose athletic facilities  Students develop long-term, in-depth relationships  Green building opportunities

Option B Weaknesses & Threats  Duplication of staff  Increased transportation for students  Personnel shifting and pupil redistricting  Fear of change  Cost to the taxpayers all at once  Must have a long term way to maintain the buildings  Community doesn’t yet understand the need  Emotional connection to buildings  Collaboration still a hurdle in K-3  Don’t know how schools impact the community for residents with no children in schools

Additional Considerations The Committee felt strongly that there were also a number of topics the Board of Education needed to also consider while moving forward in the process: Community Education Plan  Board and district staff should engage the community and educate them to the existing facilities problems and issues. Permanent Improvement Revenue Stream  Any bond issue must include a way to maintain the buildings long term through a permanent improvement stream. Building Spaces  Keep the following as top priorities: core academic spaces, interactive technology in classrooms, flexibility for expanded technology use labs/wireless, athletic areas, music areas.  Also important are flexibility of space, inclusion of spaces for the arts as a whole, and considerations for specialized learning (large group/STEM/etc.).  Conference rooms, meeting rooms and small group learning areas would be nice to consider, but not as critical. Enrollment Numbers  Assure the buildings are built to house each of the largest projected classes, as provided from the most recent enrollment projection study performed by DeJong and Healy.

Additional Considerations (cont) Athletic Fields  Plans should at least replace outdoor fields if they are eliminated during construction and have a transition plan Timing  Despite a challenging economy, the District must put this issue on the ballot as soon as practicable and before the next operating issue and the issue must be addressed as a whole. Partnerships  Partner with other community entities (hospitals, businesses) best utilize community resources, support community needs and reduce costs.  Work with the City as a partner to address City recreation needs as part of the plan which includes the utilization of unused/vacated land. Programming  Should the Board determine a grade-level configuration will be implemented the District should utilize an effective process to determine the right grade- level set up by obtaining staff input and comparing with other grade-level configured districts. Also, all elementary buildings must be able to house all- day kindergarten.

Questions