Abcd ef CO-Eng/A&C CO-Eng / A&C Manufacturing Buildings Introduction January 2013.

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Contents: Cover
Comparison of Concrete Reinforced Building System and Light Steel Building System.
Safety in Motion Industrial Slip Control. First Aid is too late! You must act to prevent accidents before they happen.
Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
East Carolina University Compressed Gas Safety Training Program
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Carpentry Green Application 5. Key Lessons from Carpentry In Carpentry, we learned about: Tool and equipment use, safety, and maintenance Primary materials,
2 3 Risks are present whenever people are in contact with:  Natural or organic materials  Substances of animal origin  Food and food products  Organic.
Subpart R Steel Erection
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Temporary storage Sven Hagemann GRS. Types of temporary storage 1.Storage of commodity mercury  Dealer, wholesaler, governmental stocks 2.Storage of.
Environmental Safety Measures for Pesticides in Retailer Shops.
World Health Organization
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
GMP and HACCP in school restaurants Comenius School Development Project 2006/07 Srednja šola Zagorje.
E n v i r o n m e n t a l Health & Safety. April 2001Environmental Health & Safety2 What is IPM? Integrated Pest Management (IPM) is the coordinated use.
Spray Finishing Operations/Spray Booth March 9, 2009.
INDUSTRIAL & SYSTEMS ENGINEERING
Good hygienic practices
Basic Principles of GMP Premises John Startup Training workshop: Training workshop on regulatory requirements for registration of Artemisinin based combined.
PRE-FABRICATED STRUCTURES
GTRI_B-1 Preventing Slips, Trips and Falls in the Health Care Industry.
World Health Organization
Painting and Coating of Plastics Aleaha Rice Erica Mongera Vince Gallo Penn State Behrend.
SQF ISO FSSC GMP Programs
BRC Food Safety Quality Management System Training Guide
BY GEETHU S JUBNA N K C WELCOME. HACCP FOR MILK PROCESSING.
Ashland Specialty Ingredients IFAC’s cGMP Audit Guide How the Food Ingredient Industry has Responded to FSMA and Food Safety Audits Priscilla Zawislak.
Mini 10-Hour Course Standards You Need To Know. OSHA’s Philosophy An effective workplace culture should value safety and health Employers should establish.
Introduction to Equipment
Evaluate Environmental, Health, and Safety  Anticipate Hazards  Recognize  Evaluation  Control Measures  Evaluation.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Quality of Works 1.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module V Plant design and maintenance Based on Version 9, 2009 of the.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Preventing Slips & Trips at Work
OHS&W IN THE ART ROOM. STORAGE Shelves and racks should be stable and ideally built in or fixed to walls Ensure that storage racks are in a safe and tidy.
Effective Sanitation 1. GMPs SANITARY EQUIPMENT DESIGN SANITARY FACILITY DESIGN HACCP TRAINED EMPLOYEES VALIDATED & VERIFIED PROCESSES REPEATABLE FOOD.
Food Safety Training Course Co-financiado:. Work facilities and Equipments.
Basic Principles of GMP
Premises Basic Principles of GMP Workshop on
FEDIAF Code of Practice
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Module 9Slide 1 of 25 WHO - EDM Premises Part One Basic Principles of GMP Part One, 11.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
 Foodservice Standards equals “Quality.”  Standards are established models or examples used to compare quality.  Meet expectations so management &
BPS3413 CONSTRUCTION SAFETY Lecture 6 : Working at Height.
Recognizing and correcting hazards
Floors, walls, and ceilings: Materials must be smooth and durable for easier cleaning Must be regularly maintained 9-3 Interior Requirements for a Safe.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Equipment & Utensils Using the Right Tools. Our Goal To provide information about the best selection, use and maintenance of food preparation equipment.
Goal Industry Standards standard- an established model or example used to compare quality standards allow food safety professionals to judge a business.
Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection.
Facility Environment 1.
Walking and Working Surfaces
Flash penetrations through roofs and walls.
ENTREPRENEURSHIP DEVELOPMENT
Chapter 4 PREREQUISITE PROGRAMS
WALLCLADDING SHEETING_
Ariana Kevelier Paul King Building Technology III
SQF ISO FSSC GMP Programs
The 10 Principles of Sanitary Design for Equipment
East Carolina University Compressed Gas Safety Training Program
Green Building and Sustainable Architecture
Arch205 building construction Introduction
BUILDING SCIENCE-1 TOPIC- ROLE OF WARM AND HUMID CLIMATE
Arch205 Materials and building construction I
Its strengths, your benefits
Parker domnick hunter. Safety of Electrical and
Presentation transcript:

abcd ef CO-Eng/A&C CO-Eng / A&C Manufacturing Buildings Introduction January 2013

abcd ef CO-Eng/A&C Design Principles for Manufacturing Buildings 2 Where feasible group several small building volumes into one bigger building with simple shape, regular building grid and consolidated roofline. Establish clear hygienic zoning. Group rooms with similar indoor requirements where possible. All elements fit for cleaning and maintenance. Ensure safe circulation on site by separating people and traffic flow and providing comprehensive signage. Provide safe and healthy workplaces. This is Nestlé policy and important to achieve environmental labels like LEED (US Green Building Council). Conceptually integrate building structure & envelope with technical services of the building, including building related industrial services elements.

abcd ef CO-Eng/A&C Layout Design 3 Where possible, group several small building volumes into one bigger building with shape in a simple and modular grid. Strive for compact buildings with simple shapes and rooflines; avoiding complex building agglomerations. L-flow type factory gravity or fluid type factory (powder handling) U-flow type factory Linear-flow type factory industrial services prod. 2 finished goods warehouse prod. 1 extension raw materials reception multi product – back bone type Tower-like Egron and adjacent process buildings Large span single-storey buildings for packing, warehousing and can manufacturing Flow of Manufacturing Process Example Konolfingen Matching Flow Sheets and Buildings

abcd ef CO-Eng/A&C Our buildings have to be designed and constructed to guarantee that control, to protect our people and products from those hazards Hygienic Design & Construction of food processing buildings, including appropriate zoning, allows the right flows of raw & packaging materials, finished goods, wastes and personnel in an environment designed to control potential contamination from micro-organism, allergens and other hazards. Establish clear hygienic zoning based on the process flow sheets. Identify space needs per functions and define their relations. Define indoor conditions like temperature/humidity, floor finishes, drains, wall finishes etc. Hygienic Zoning 4 Example

abcd ef CO-Eng/A&C Building Volumes and Composition 5 Harmonizing Building Volumes, showing tower buildings as separate volumes. The most effective architectural approach to reduce the CO2 footprint due to the grey energy embedded in construction materials is to make buildings compact, with simple shape and with a building shell that is suitable for the local climatic conditions. Puelche, Chile Example

abcd ef CO-Eng/A&C Building Shell 6 Building skins should respond to the local conditions, to the physics/dynamics of the building, to comfort and interior well-being of the building users. Strive for flush facade surfaces without apparent structure. Openings only where absolutely required (workplaces, orientation). Screens (e.g. from stretch metal) can be used to consolidate small building units of different type and technical installations into a homogenous simple building volume. Consider day and night effects and harmonize Building Volumes.

abcd ef CO-Eng/A&C Building Structure 7 Foresee future expansions and changes/increases of equipment for waiting beams or columns. Consider equipment loads and vibration for the structural calculation. Concrete structures can crack and bolts in steel structure can become loose. Conceptually integrate building structure & envelope with technical services of the building, including building related industrial services elements. Optimize for short ducting & piping, preferably without cladding; building and equipment are closely linked. Provide wall and ceiling penetrations for piping and ducting properly sealed. Trian, Vietnam Waiting Columns Konolfingen, Switzerland Konolfingen, Switzerland

abcd ef CO-Eng/A&C Choice of Materials and Finishes SIKA MEMBERS AREA It is an information platform which contains approved Sika Solutions according to Nestlé’s requirements for different production areas. 8 Prefer easy to clean and easy to maintain materials for platforms, stairs, ladders such as stainless steel. Good quality water-based paint is preferred over solvent-based because solvents may release Volatile Organic Compounds (`VOC`s`) with toxic impact on the environment and enhancement the buildup of moulds. Electrically conductive floor in explosive areas (dust explosion) is recommended. Resin based coatings such epoxy. Advantages: smooth, easy to clean finish, resistant to chemicals with the right additives, fast to install. Disadvantages: requires skilled people to install it, no slopes possible, more expensive per sq. meter Flooring solutions should balance between easy to clean and non slip finish for safe working conditions.

abcd ef CO-Eng/A&C Signage Verify that the colors are not in conflict with local laws and standards. 9 Ensure safe circulation on site by separating people and traffic flow and providing comprehensive signage. Clearly mark emergency exits, use also coloring and graphics to direct people and traffic flow.

abcd ef CO-Eng/A&C Security, Safety and Health 10 Wide doors allow to remove equipment for maintenance to the workshop easier. Prefer fixed platforms to access manholes in equipment instead building a scaffolding for every inspection or maintenance procedure. Ensure safe access to roofs. Install safe inspection and maintenance access when necessary and walkways protected with barriers. Control Room must have good visibility to the process area, with proper ergonomics and lighting design for good working environment. Producing highly sensitive Nestlé products requires full attention of the operators and to the workplace environment.

abcd ef CO-Eng/A&C 11