Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions.

Slides:



Advertisements
Similar presentations
John Reynolds, Lean Six Sigma Master Black Belt APICS Associate Lean Enterprise Instructor
Advertisements

5S BASIC TRAINING What is 5S and why do we want to do it?
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
CI Basics Super Sponsor DMAIC The Value Stream 6σ6σ.
Lean Six Sigma Awareness Copyright OpenSourceSixSigma.com 1 OSSS LSS Black Belt v9.0 - Control Phase Awareness Training Materials.
Going Lean Can it work for the Medical University? Jennifer Hooks MBA Manager, Performance Improvement Six Sigma Master Black Belt Lean Sensei.
Please use the following two slides as a template for your presentation at NES. Lean Six Sigma Techniques for Inventory Management Norman Pugh-Newby, CPPA,
Baldrige National Quality Program 2009 Baldrige National Quality Program The Path to Excellence and Some Path-Building Tools Baldrige National Quality.
Solving Business Problems
25 Mar 10 – WDM 204 – Session Two. Cape Area Management Program (CAMP) Sponsored by the Cape & Islands Workforce Investment Board.
Presented By The University of Texas-School of Public Health
Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on down, simply by spending his money.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Six Sigma TOTAL QUALITY MANAGEMENT 6 
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
TRICARE Management Activity HEALTH AFFAIRS Version 1.0 Business Process Engineering & Process Improvement MODULE 6 Lean Six Sigma Problem Solving Methodology.
Production Systems Chapter 9.
Lean Six Sigma: A Vision
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
1 An Introduction to Lean and Six Sigma for AHQ by ASQ Kelly Roggenkamp April 22, 2010.
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Lean Six Sigma Executive Introduction. Copyright OpenSourceSixSigma.com Competition Every morning in Africa, a gazelle wakes up; it knows it must run.
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
Voice of the Customer (Part of the Project Preparation Phase)
Overview of Lean Six Sigma
LeanSigma ® Facilitator Training Module 13 – Continuous Improvement.
Lean Six Sigma Black Belt Blended Learning Program Course Description Blended Learning FLEXIBLE: Class sessions can be 100% online or augmented with live.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Development of Six Sigma
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Cytec Engineered Materials Business Confidential and Proprietary Applications of Six Sigma In The Composite Materials Industry 12 th IAQG General Assembly.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
SIX SIGMA-  PROCESS IMPROVEMENT TECHNIQUE. Business Goal :- To ultimately transform all transactions into monetary gains through customer's satisfaction.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Freeleansite.com The Lean Enterprise Why Change ? Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
Ten Ways Lean Systems Can Improve Your Organization
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
© 2014 World Vision International Excellent processes promote excellent ministry impact Isn’t it good enough to have good processes? Why strive for Excellent.
Value Analysis/ Flow Analysis
Welcome to Lean Six Sigma Green Belt Training
Continuous Improvement Workshop: Kinexus Kaizen in Action.
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Sigma Lean Execution Plan for Black Belts
Lean Six Sigma An Introduction to Process Improvement.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
1.  Name  Work experience  Background in continuous improvement activities  Expectations 2.
Six Sigma Overview Presented by: >. Agenda What is Six Sigma? History of Six Sigma Six Sigma Methodology When to use Six Sigma? Different Six Sigma belts?
The Value Driven Approach
Introduction to Kaizen Introduction Kaizen Facilitation.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
1 LSSG Green Belt Training Improve: How do we get there?
Kaizen Eventing: The process of observation and the elimination of waste in a process.
An Overview of “Why” Six Sigma Lean Oct 2015 Rev 9.2 RAH Consultant Group 8478 Winged Foot Drive Frisco, Texas, Tel:
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI.
OPERATIONS MANAGEMENT Goods, Services and Value Chains MOHD FARHAN ISMAIL TEEBAN THATCHANAMURTHI ADAMU ABDULLAHI IDRISU ROSHASMAWI.
Six Sigma.
5S BASIC TRAINING What is 5S and why do we want to do it?
Quality Management Six Sigma
6 Six Sigma Basics GEOP 4316.
5S BASIC TRAINING What is 5S and why do we want to do it?
5S BASIC TRAINING What is 5S and why do we want to do it?
Introduction to Lean and Lean Training
Lean-Green belt six sigma program
Presentation transcript:

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 1 Lean Six Sigma at Alliant Energy Larry Heckert LSS Master Black Belt

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. Agenda Alliant Energy’s Journey Six Sigma Overview The Move to Lean Lean/Lean Culture 2

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. We are an energy-services provider. Our customers… Interstate Power and Light (IPL) – 527,000 electric – 234,000 natural gas Wisconsin Power and Light (WPL) – 457,000 electric – 179,000 natural gas Alliant Energy – Who We Are

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. Generation Portfolio

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. Lean Six Sigma Timeline Green Belt Wave LSS Basics for all employees 2010 Black Belt Wave 1 Full-Time Black Belts & Decentralization LSS Approval (Six Sigma emphasis) Training internal 2011 Lean curriculum Lean Emphasis approval

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 6 Breadth and Depth

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 7 Six Sigma Basics Many factors cause the output of a process to vary – Inconsistent results – Output may not meet customer’s requirements (defects) Using Six Sigma, sources of variation are: – Identified – Quantified – Eliminated or Controlled

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 8 Six Sigma Basics Inputs Processes have many inputs Inputs influence the output in different ways To improve a process, we need to understand the relationship between inputs and the output Improving key inputs has the greatest impact on our output Process Y = f(x) Y Output X1X1 X2X2 X3X3

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 9 DMAIC Methodology Define What’s the problem? How does the process work today? Define What’s the problem? How does the process work today? Measure Can I trust my data? What are the potential Key Process Input Variables (KPIVs)? Measure Can I trust my data? What are the potential Key Process Input Variables (KPIVs)? Analyze How do we know we have found the most important input variables? Analyze How do we know we have found the most important input variables? Improve How can we improve the key inputs? Improve How can we improve the key inputs? Control Ensure it stays fixed. How can we control the key inputs? Control Ensure it stays fixed. How can we control the key inputs? Characterization Optimization Delivering Results Delivering Results

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 10 Shift to a Lean Emphasis Our Six Sigma Experience – Application - Reduce variation or finding root causes – Projects typically 6 months or longer – Relies on data/technology for certain analyses – Limited impact on “the way we work” Lean – Easily applied to any process – Continuous improvement focus – Low-tech, hands-on approach – Focus on immediate or short-term improvements

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 11 Lean Let’s consider an example A philosophy that emphasizes Reduction of wasteful activities, Getting products or services to flow, and involving Continuous improvement, made by The people who do the work, using Experimentation

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 12 Lean in Auto Racing

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 13 Lean Principle – Precisely specify the value of a specific process as defined by the customer Each activity or task in a process is identified as: Value-Added – Transforms the deliverables of a process in such a way that the customer is willing to pay for it – Done right the first time Waste – Uses resources but doesn't contribute to the product or service – Customer wouldn’t want to pay for it (or wouldn’t if they knew about it) – Note: Some waste may be required (regulatory, legal, etc.) Goal = Eliminate or reduce the waste!

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 14 Customer-Defined Value – First step of a Lean effort is to define the “voice of the customer” in meaningful and measurable terms Cost Safety Delivery   Quality Critical To Satisfaction   A critical mistake is assuming we know what the customer wants!

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 15 The Eight Types of Waste WastesThe Simple Explanation… DefectsIt doesn’t meet customer expectations OverproductionProducing too much and/or too fast WaitingIdle time when resources are not available Non-Value-Added Processing Any effort that adds no value to the product or service TransportationUnnecessary movement of materials, products, or information InventoryMore materials on hand than are required to do the work MotionExcess movement of people within a process Employees UnderutilizedNot using people to the best of their unique abilities

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 16 Lean Principle – Identify the Value Stream for each process and challenge all of the steps that do not add value (waste)  Value assumes you are creating something of value that a customer is willing to pay for  Stream refers to a sequential flow of activities needed to create an output and deliver it to the customer  Value Streams identify all of the steps currently required to move products or services from beginning to end

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 17 Making the Process Visible

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 18 Generation Value Stream Map

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 19 Lean Tools to Address Opportunities Value Stream Map identifies opportunities – Quick Hits (Just do it!) – Focused Lean Events RI Event 5S (Workplace Organization) 2P – Process Preparation – Six Sigma Project (Variation) Bursts become opportunities

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 20 Lean Building Blocks Setup Reduction Standardized WorkBatch ReductionTeams Quality at Source 5S SystemVisualFacility Layout POUS Cellular/FlowPull/Kanban Continuous Improvement Value Stream Mapping TPM

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 21 What does a Lean Culture look like? Knowing what it looks like allows us to move our culture in the right direction Four basic concepts: 1.Every activity is structured 2.Every customer-supplier is clearly connected 3.Every flow path is simple and specific 4.We improve through experimentation

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 22 Horizontal vs. Vertical

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 23 Lean Thinking 1.Get rid of old, traditional concepts and assumptions 2.Accept no excuses - Look for ways to make things happen 3.Say “No” to status quo and assume new methods will work 4.Don’t expect or worry about perfection, but look to continuously improve – starting now 5.The primary cost of Lean events is effort – not capital 6.If something is wrong, fix it on the spot 7.Empower everyone to think of ways to solve problems. Good ideas come when the going gets tough. 8.Before making decisions, ask “Why” five times to get to the root cause 9.Look for wisdom from 10 people rather than one 10.Improvement has no limits. Never stop trying to improve.

Strategic Planning Document – Confidential and Proprietary – Preliminary Draft – For Discussion Purposes Only. The opinions, interpretations, and conclusions contained in this presentation are preliminary in nature and included for discussion and strategic plan development purposes. They are not necessarily the final opinions, interpretations, or conclusions of Alliant Energy, IPL, or WPL. 24 ? Lean Six Sigma at Alliant Energy