Taylor Pavilion Design Review 2015. Pavilion Design Review Committee 2015 June 3, 2015 Belmar Mayor & Council form an advisory committee to review the.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Advertisements

Flood Damage Prevention Ordinance.  Legal means for communities to set standards for regulating floodplain development  Dependent upon type of mapping.
Sandy: Building Back Stronger, Safer & More Resilient Tim Crowley, Director, Mitigation Division, FEMA Region II December 2012.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Skyscraper Construction
Chapter 14: Cost Approach. Cost Approach  The Cost Approach is most useful when:  Property is unique  Property is reasonably new and the improvements.
October 30, 2014 Presented by: Penfield Building Committee - James Bradley, Chair Robert Bellitto, Vice Chair, Andrew Graceffa, Secretary Ian Bass, Jane.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
to 2015 Operating Budgets Governance & Priorities Committee March 7, 2013.
Understanding Advisory Base Flood Elevations (ABFEs) Understanding Advisory Information and the Implications for Your Home December 2012.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Commercial Foundations
& CRITERIA FOR MAXIMUM ELEVATION OF RESIDENTIAL BUILDINGS IN FLOODPLAINS William L. Coulbourne, P.E. Applied Technology Council
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-494 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
Flood Mitigation for Structures in the Gulf Coast Region Norma Jean Mattei, Ph. D., P.E. University Of New Orleans Special thanks to: Chris Jones, PE and.
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
Identifying Information: Common Areas - 1 none LEVEL 2.
This control panel was inundated with 3 feet of floodwater (yellow arrow). Sensitive electronic equipment was damaged (Columbus Junction, IA).
Methodology for Energy Savings claim for Incentive Programs and Codes & Standards(C&S) accounting Presented by: Armen Saiyan P.E. For the California Technical.
Occupancy Classification Under NFPA 13 Examine the proposed facility and make recommendation on the Occupancy Classification Used to classify fuel loads.
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
FEMA’s Mitigation Assessment Team Program – Where Have We Been and Where Have We Still To Go? 2010 ASFPM National Conference John Ingargiola – FEMA Eric.
Josette Severyn Blake Harvey Sekita Grant Brett Lackey Alex Fisher Hilary Flint Amy Long Image source: Accent Beach Homes.
Building Solutions For The World. Building Solutions For The World What is a Force 10 home? Hurricane - Fire - Termite - Mold - Resistant Housing... Force.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Frames and Walls Lateral Stability
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Town of Kill Devil Hills Flood Plain Management & Regulations October 2007.
School Consolidation Public Information Session New Hartford Board of Education.
Using HAZUS-MH to Assess Tsunami Risk Bill Bohn, Tetra Tech June 19, 2007.
Affordable housing project
 Building Statistics  State-of-the-Art Lab  Chief Medical Examiner  121,000 square feet  5 stories  $45 million project.
Professional Practice Building Surveyors contribution.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
FY08 PARKING PERMIT FEE PROPOSAL November 20, 2006.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
Foundation Loads Dead Load Live Load Wind Load
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
An Overview of A-Zones vs. V-Zones An Overview of A-Zones vs. V-Zones M. Sean Welsh, CFM Assistant Flood Plain Administrator Galveston County.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Prof. Shrikant M. Harle Asst prof. Dept of Civil Engg PRMCEAM
Planning Commission Work Session February 19, 2015.
UPDATE REGARDING PW ADMIN BUILDING NOVEMBER 2, 2015.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Why Do We Need to Change ?  It limits our ability to reduce insurance rates (NFIP).  Places local contractors and Real Estate agents at a disadvantage.
Sardar Patel Institute Of Technology
Flocculator Extras.
Occupancy Meeting Please be sure to sign in at the door!
NAU International pavilion expansion
CITIZENS BLUE RIBBON COMMITTEE
SportsNet - Contingency Plan
Multistory Office Building
Design of a Commercial Shopping Center
Wood Structures Topic 8 Quality Workmanship
Harris County Permits Office
Penfield Pavilion Status Report
Sound Wall/Noise Barriers Provided by INNSTRUCT
Concrete Structures DR. Nabil Dmaidi.
Foundations Four Basic Types Footings Piers Pilings Slabs
Mitre III Building McLean VA Debra Schroeder Structural Option.
Space Removal Initiative
Denver Fire Depart. License Fire Alarm Practice Test # 12
BUILDING CONSTRUCTION Foundation
Presentation transcript:

Taylor Pavilion Design Review 2015

Pavilion Design Review Committee 2015 June 3, 2015 Belmar Mayor & Council form an advisory committee to review the design of Taylor Pavilion for the express purpose of identifying areas where adjustments could be made to save costs of construction while not requiring significant redesign expenses. The committee met throughout the summer and arrived at the following presentation for Mayor & Council’s consideration.

Pavilion Design Review Committee 2015 Method of Review Building must stay within the existing footprint due to DEP & FEMA standards. Consideration of design alterations should maintain the integrity of the existing design purposes. Taylor Pavilion should remain as the replacement for what was destroyed. Any redesign recommendations must allow for the building to be permitted under NJDEP and remain inline with FEMA requirements so as not to jeopardize FEMA funding. Any redesign recommendations must survive a cost benefit analysis to ensure that savings exceed the cost of redesign. Carefully review designs to identify any changes from the destroyed structure and determine if those items can be eliminated or modified.

Pavilion Design Review Committee 2015 Review of Existing Design Taylor Pavilion Demolished by Sandy Rendering of New Taylor Pavilion Total Square footage - 7,000 SF Total Square Footage - 6,812 SF

Pavilion Design Review Committee 2015 Review of Existing Design Floor Plan of old Taylor Floor Plan of New Taylor Total Square footage - 7,000 SF Total Square Footage - 6,812 SF Concession SpaceBathrooms Beachfront OperationsKitchen & Storage General Space

Pavilion Design Review Committee 2015 Review of V-Zone Construction Standards Minimum Finished Floor Elevation (FFE) – Base Flood Elevation (BFE) +3’ results in FFE approximately 5 feet above the existing boardwalk. Open Foundation – Building must be pile supported with the lowest horizontal member above the BFE. All walls below the BFE must be breakaway. Impact loads – Must be able to survive impact from 1,000 lb object on critical members below the BFE. Wave loads – Every structural component below the BFE is subject to wave loading.

Pavilion Design Review Committee 2015 Review of Codes & Standard Requirements Building is an A-2/A-3 Mixed Use General Assembly building ADA access must be provided - ADA accessible ramps must be located at the main entrance Automatic Sprinkler System Bathrooms HVAC Requirements

Pavilion Design Review Committee 2015 Review of Taylor – Old V. New – What’s different? ItemWhy?Optional? Stronger Foundations*DEP V-Zone StandardsOnly if V-Zone is mitigated More BathroomsCodes & StandardsNo HVACCodes & StandardsNo Dedicated Beachfront Operations Space & SecuredRectifying Flaw of Old DesignYes Columns RemovedRectifying Flaw of Old DesignYes ( Columns limited general space usage.) Hallway AddedRectifying Flaw of Old DesignYes (Old design muddled beachfront operations and general usage.) *Redesign costs estimated at $25,000. Benefit of redesign would need to save more than $25,000 to be considered.

Pavilion Design Review Committee 2015 Design Consideration Alternate Foundation System The cost of the foundation is one of the largest components of the total project costs. Is a “cheaper” foundation possible? Alternatives must meet V-Zone requirements, current building codes, and any other structural requirements. The V-Zone requirements are the most difficult to design for. Must be able to withstand impact force of floating debris or have redundancy built in. Alternatives must be potentially permitted by DEP.

Pavilion Design Review Committee 2015 Design Consideration: Alternate Foundation System Option #1 - Take the building out of the V-Zone Build a steel sea wall and back fill to remove footprint from the V-Zone Build a traditional timber piling foundation. Concerns: Cost of sea wall Filling of beach may not be permitted by NJDEP

Pavilion Design Review Committee 2015 Design Consideration: Alternate Foundation System Costs Option #1 - Remove from V-Zone Cost $275k more than designed foundation + $25,000 in redesign = $300,000 Increase to Existing Design ItemUnit PriceUnitQuantityTotal Steel Bulkhead$1,400LF325$455,000 Fill$30.00CY5305$159,150 Piles$46.97LF3160$148,425 Timber Framing & Floor$7.51SF6812$51,158 $813,733

Pavilion Design Review Committee 2015 Design Consideration: Alternate Foundation System Option #2 – Leave in the V-Zone but Use a timber piling foundation (traditionally cheaper than steel and concrete) Impact loads in V-Zone requires redundancy of pilings; the structure must be designed for a damaged piling. Timber framing would be used for the foundation instead of concrete Concerns: Reduced service life and structural integrity compared to steel piles and concrete foundation Code standards require that more than double the number of piles would be needed if timber is used.

Pavilion Design Review Committee 2015 Design Consideration: Alternate Foundation System Costs Option #2 – Timber Piling Cost $158k more than designed foundation + $25,000 in redesign = $183,000 Increase to Existing Design ItemUnit PriceUnitQuantityTotal Piles$46.97LF12640$593, Timber Framing & Floor$15.02SF6821$102, $696,152.22

Pavilion Design Review Committee 2015 Design Consideration: Exhaust other “Reductions” Option #3 – Reduce Bathrooms:Not Permitted by Codes & Standards Remove HVAC:Not Permitted by Codes & Standards Return Beachfront Operations to Prior Would reintroduce flaw of old design. ConfigurationPotential savings is nominal and would not survive CBA. Put Columns Back In:Would reintroduce flaw of old design. Would add to the cost to put columns in where none are now. Would not survive CBA. Remove Hallway:Would reintroduce flaw of old design. Potential savings is nominal and would not survive CBA.

Pavilion Design Review Committee 2015 Committee Recommendation The Taylor Pavilion as designed adheres to codes and standards for V-Zone construction and is by far the most cost effective replacement of what was lost in Hurricane Sandy.

Taylor Pavilion Design Review 2015