Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
1 What is Operations NU 4 Distribution Companies $1,311M Cap 32,000 Interruptions 67,000 Trouble Calls 40,000 miles of infrastructure 2 +
Dr Alan J Murphy School of Marine Science and Technology.
Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.
Central management of training Program development Local implementation of programs Government orientations, policies and structures Components of the.
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
Smart Grid Overview Steve Bossart Project Management Center Foreign Service Officers Coal and Power Training Course July 20, 2012.
VSE a.s Page 1 Východoslovenská energetika a.s. We invest in the region Košice, October 19, 2010.
Case 1: Optimum inspection and maintenance rates (wind turbine is available during inspection) Case 2: Optimum inspection and maintenance rates (wind turbine.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 3 Output management: essential Instruments within ProRail By Jan.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Smart Grid Technologies Damon Dougherty – Industry Manager.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
An Overview of the Smart Grid David K. Owens Chair, AABE Legislative Issues and Public Policy Committee AABE Smart Grid Working Group Webinar September.
Frankfurt (Germany), 6-9 June 2011 Simone Botton, Fabio Cazzato, Marco Di Clerico, Domenico Di Martino, Federico Marmeggi – Enel Distribuzione SpA Simone.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
The strategy for improved electricity distribution maintenance 9 June 2008.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
Frankfurt (Germany), 6-9 June 2011 SmartLife Guillaume & SmartLife Core Group – France – S1 – Paper SmartLife initiative in Focus.
WELDINGH_DK_AUTHOR_6.2_12 Barcelona May Impact of the Deregulation on the Safety H. Weldingh –DEFU I.R. Ludvigsen –The Danish Electricity.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
Frankfurt (Germany), 6-9 June 2011 Marcus R. Carvalho – Brazil – RIF Session 5 – Paper ID 0728 LONG TERM PLANNING BASED ON THE PREDICTION AND ANALYSIS.
Frankfurt (Germany), 6-9 June 2011 Manuel Avendaño J. V. Milanović Manuel Avendaño – UK – Session 2 – Paper 0529 METHODOLOGY FOR FLEXIBLE, COST-EFFECTIVE.
Frankfurt (Germany), 6-9 June 2011 Paulo Pereira – Brazil – Session 2 – 0993 OPTIMIZATION OF VOLTAGE REGULATOR SETTINGS AND TRANSFORMER TAP ZONES IN DISTRIBUTION.
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
Speaker: Company: PRESENTATION © Euromaintenance 2008 – Belgium Brussels 8-10 April 2008 A Risk Based Approach to Electricity.
Storage Optimization in Distribution Systems Roger Cremers & Gabriël Bloemhof KEMA (The Netherlands) CREMERS – NL – RIF Session 4 – Paper 0180.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Top-down models of operating and capital expenditure.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
SUSTAINABLE INVESTMENT STRATEGIES FOR AGING DISTRIBUTION NETWORKS Dr. Eric Jennes 24/7 Netze Mannheim Germany Frankfurt (Germany), 6-9 June 2011 Dr. Eric.
Business Intelligence Energy, Resources and Utilities.
What can we learn from Benchmarking? Bård Uthus BKK Nett AS
L. Radulov, A. Nikolaev Black Sea Regional Energy Centre
Engaging Energy Consumers Energy Action, Fuel Poverty & Climate Action Conference - March 2017 Aoife MacEvilly Commissioner for Energy Regulation Regulating.
Transmission and Distribution Loss Study
HOW TO CREATE A GREEN SOCIETY – CASE OF KAMPALA CAPITAL CITY
Illustrative EE/DSM/DR Planning Process
Across the entire value chain
Peter van Oirsouw (Phase to Phase)
Integrated Distribution Planning Process
Module 40 Planning Our Energy Future
Sami Repo Tampere University of Technology FINLAND
Content. Content Performance indicators based on the 3 pillars of sustainability.
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance project to priority

Frankfurt (Germany), 6-9 June 2011 Ageing of the power system Presumptions: Lifespan of lines ~ 40 år NTE Nett AS must replace 108 km/year. Lines are replaced 1:1This is a 400 % increase from today. Installed MV lines per year

Frankfurt (Germany), 6-9 June 2011 Wide and sparsely populated area 80 % of the transformers supplies less than 17 customers. Approximately 19 customers per km MV line. Number of customers per transformer (cumulative distribution)

Frankfurt (Germany), 6-9 June 2011 Efficiency  The annual income cap does not give good enough incentives to do reinvestments.  The network companies must be able to build more MV lines per Euro.  Simplifying the grid structure.  New technologies and new solutions  Choosing the right projects and implementing them in the optimum order.  Effective data acqusition and processing with quality and accuracy.

Frankfurt (Germany), 6-9 June 2011 New technologies – new solutions  New and improved building material Reducing construction, maintenance and operation costs  New solutions Reduced operational costs More optimal usage of grid capacity / increased control of the power flow Improved state estimation Extended life span in parts of the network

Frankfurt (Germany), 6-9 June 2011 Priority process Typical parameters in the assessment process Safety of supply Regulatory requirements Terms of concession Condition monitoring and inspections Fault and interruption statistics Technical state / indicators Technical calculation / LCC Experience and local knowledge Climatic and environmental factors Maintenance friendliness Load composition New technology Costs of energy not supplied Aesthetics Age Regulation of revenue Framework Basis for decision making Technical and economic analyses Analysis methodology Preventive maintenance Renewal / Reinvestments Decisions Expected corrective maintenance Criteria: -HSE -Technical -Risk Criteria: -HSE -Technical -Risk

Frankfurt (Germany), 6-9 June 2011 Data acquisition Present: Manual data acquisition/state estimation. External resources are used. Large variation in data quality (experience, character references and accuracy). Future: Smart technology (automatic data acquisition) New methods Photo of a rotten traverse taken from a helicopter

Frankfurt (Germany), 6-9 June 2011 Smartgrid pilot in Steinkjer  NTE in partnership with The Norwegian Smartgrid Centre.  Main scope: To gain knowledge and practical experience by using smartgrid technologies to operate the energy system more effectively regarding:  Economy  System reliability  Quality of delivery  Occupational health and safety  Environment, aesthetics

Frankfurt (Germany), 6-9 June 2011 Smartgrid pilot in Steinkjer - Location 772 customer og 30 substations