Feedback on HMA recycling task team Trevor Distin RPF May 2008.

Slides:



Advertisements
Similar presentations
Reducing construction waste through design Dave Marsh Construction Project Manager.
Advertisements

ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
YHAUC RECYCLE GROUP Framework Document Progress - YHAUC 22/8/08. Date: 22 nd August Venue: Metrodome, Barnsley. YHAUC update  Progress since the.
ROAD PAVEMENT FORUM MAY 2007 Technical Guideline: The use of Modified Bituminous Binders in Road Construction TG1: 2 nd Edition – May 2007.
CAPSA Progress Report. Contents Previous CAPSA Continuity Next CAPSA Date Theme Format Workers Venue.
Binder Distributors Task Team Feedback. Progress since May Resolution #7 –To review the process of binder distributor certification as fit for purpose.
RPF Binder Distributor Task Team Feedback 21 May 2003 Pietermaritzburg.
Road Pavement Forum May 2001 Road Materials Committee.
Health, safety and the environment A Sabita perspective RPF November 2003.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
Recycling and Reclamation of Airfield Pavements 35 th Airports Conference FAA Eastern Region, Hershey, PA April 4, 2012 Campbell & Paris Engineers, 35.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Reclaimed Asphalt Pavements “RAP” Pete Coffman. RAP ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns ◊Case Studies ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns.
Status Report on Standard Specifications and Codes of Practice Department of Transport RPF November 2004.
Bituminous Products Guidelines & Documents Trevor Distin RPF May 2008.
COTO Road Materials Committee (RMC) Towards National Specifications Road Pavement Forum 07 November 2006 Elzbieta Sadzik.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
Road Pavements Forum Structural Design Working Group Revision of the South African Flexible Pavement Design Method 7 November 2006 Pretoria H L Theyse.
Technical Recommendations for Highways No 12 TRH 12
SEVENTH ROAD PAVEMENT FORUM 26 November 2003 FEEDBACK FROM THE ASPHALT REINFORCEMENT WORKING GROUP.
15 h ROAD PAVEMENTS FORUM East London May 2008 HMA Task Group.
Report back on binder distributors Trevor Distin.
AAPA 2010 Study Tour – Recycled Asphalt Pavement Recycled Asphalt Pavement Trevor Distin | Cassandra Simpson.
2 3 WMA Technical Working Group (WMA TWG) Formed in 2005 Purpose: Promote Technology Transfer Facilitate Product Approval Methods Encourage Research.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
X:\Presentations\FBworking groupRPFnov02.ppt DEPARTMENT OF TRANSPORT & PUBLIC WORKS FOAMED BITUMEN WORKING GROUP Road Pavement Forum- Nov 2002 E. SADZIK.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
Review of TMH1 Tests on asphalt. Role of Sabita Motivation Standards.
PROGRESS OVERVIEW: COLTO STANDARD SPECIFICATIONS TMH AND TRH DOCUMENTS OTHER DOCUMENTS.
Procure Plus model 1. Scope 2. Kick start meeting 3. Initial surveys 4. Information for costs 7. Live on e-Procurement 6. Pre-contract meeting 5. Target.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
COTO Road Materials Committee (RMC) Road Pavement Forum 11 May 2006 Elzbieta Sadzik.
RTF Measure Life Guidelines Subcommittee Meeting 31 January 2012 Discussion Materials / SERA.
EIGHTH ROAD PAVEMENTS FORUM Programme and Status of Resolutions.
AGRÈMENT CERTIFICATION OF THIN LAYER ASPHALT Dennis Rossmann RPF - May 2005.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
Asphalt Academy Feedback to RPF 23 November 2005.
ROAD PAVEMENTS FORUM Roodevallei Country Lodge 13 & 14 November 2001.
15 th ROAD PAVEMENTS FORUM Mpekweni Beach Resort 6-7 May 2008 Final Session: Resolutions.
Australian Study Tour of South Africa: Durban: the warmest place to be Sustainability in eThekwini 9 September 2011.
Pavement Research Advisory Committee (PRAC) 13 th Meeting of the RPF 8 May 2007.
Shelter Meeting 08b is hosted by MSF-Belgium Shed Guidelines Daniel Reader and Thomas Whitworth TITLE PAGE.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
STATUS OF INDUSTRY DOCUMENTS SANRAL PERSPECTIVE. SPECIFICATIONS & STANDARDS  OWN  INDUSTRY SANRAL USE :
15 th RPF 6 – 7 May 2008 Standard test methods for hot mix asphalt.
LLP HMA Reclaimed Asphalt Pavement ( RAP) Pre-Bid Meeting District 4 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement Division.
Black Top Committee a joint initiative in the Western Cape.
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
Road Pavement Forum May 2006 REVISION Technical Guideline: The use of Modified Bituminous Binders in Road Construction (TG 1: 2001)
Edinburgh Shadow Strategic Planning Group Friday 19 June 2015 Welcome Back.
A review after 5 years. Cease dependence on inspection to achieve quality... by building it into the product in the first instance.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
Use of RAP in Asphalt Mixtures. 2 Outline Why Recycle? Economics of HMA Recycling Current Practices for Using RAP Sources and Processing of RAP Sampling.
Introduction Old asphalt pavements Increase demand in landfill areas and landfill costs Landfill areas.
REVIEW OF OUTCOMES FROM ICG-WIGOS TASK TEAMS Outcomes from the 4 th Session of TT-WMD ICG-WIGOS-5 WMO; OBS/WIGOS.
Brief Overview of Global MLS Users Group Applications 2015
MLS User Group feedback TRB2017
DARIAH 2020: 25 Key Actions for a Stronger DARIAH by 2020
TTC Activities on IPR in Standards
Recycled Asphalt Pavement
Best Practices on the Use of RAS
Report of the SEEA Editor
Reporting and Water Information System for Europe (WISE)
International Trade & Business Process Group (TBG)
Recycling Tear-Off Shingles: Shingles to Streets
Members Forum 2010 Saied Solomons.
Presentation transcript:

Feedback on HMA recycling task team Trevor Distin RPF May 2008

Progress since last RPF Resolution passed at Nov 07 RPF that a task team be established to: to develop best practice guidelines for the use of RAP in HMA this follows from 3 SAT seminars & specialty session held at CAPSA07 first task team meeting held 24 April

Task Team Client –Dennis Rossmann –Adreo Brits –Rob Lindsay –Eric Lathlief/ Krishna Naidoo Engineers –Derick Pretorius –Tony Lewis –Nico vd Walt –Benoit Verhaege Manufacturers & Contractors –Bennie Greyling –Herman Marais –Wynand Nortje –Gary Catin

Plan of action 1.Use draft TRH 21 (1996) as working document 2.Update with latest international best practice 3.Identify appropriate documents 4.Agree on content of new TRH 21 5.Appoint a consultant/s to rewrite new document 6.Identify specialists from task team to act as peer reviewers for each section 7.Contract specifications to be incorporated into revised COTO document SANRAL to include in proforma project specifications

Proposed specification framework 3 classes of HMA –< 15% RAP –> 15 < 30% RAP –> 30 % RAP Prescribe same mix end properties irrespective % of RAP within each class of HMA For each class identify: –risk/application/constraints/protocols

Paradigm shift Treat RAP as a valuable asset of the State RAP to be regarded as an alternative aggregate source ie linear quarry Stockpile RAP for general use on future projects Optimise use of RAP RAP to be seen as competitive advantage

Handling of RAP Develop protocol for reclaiming, stockpiling and processing RAP Milling of RAP –Investigate insitu layers –Selected premilling Stockpiling of RAP –Demarcate dedicated stockpiles –Minimise moisture content of RAP –Avoid segregation and consolidation Processing of RAP –Screen RAP into different sizes –Fractionating of RAP when using >15% –Plant limitations Type of plant Where the RAP is feed into mixing process

Reference documents Brock D (2007), Milling & recycling, Technical paper T- 127 Newcomb D (2007), Designing HMA mixtures with high RAP content, QIS 124 Young T (2007), Processing & handling of RAP, IS 123 EN (2005), Bituminous mixtures – materials specifications for reclaimed HMA Austroads (2000), Framework specifications for HMA recycling, AP-T02 Rebbechi J (2005), Austroads guide & commentary series on HMA recycling PIARC (2007), Review of the growth & development of recycling in pavement construction

Content 1.Introduction 2.Pavement recycling 3.Use of RAP in HMA plant recycling 4.Feasibility of recycling 5.Mix design 6.Reclaiming of RAP 7.Stockpiling of RAP 8.Mixing & plant

Way forward Appoint consultant/s –June 2008 Complete first draft –Nov 2008 RPF Publish best practice document –Jan 2009 Workshop best practice document –Feb 2009