201 MHz NC RF Cavity R&D for Muon Cooling Channels

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
201 MHz Cavity Studies Derun Li Lawrence Berkeley National Laboratory MuCool RF Workshop (Fermilab) July 7 and 8, 2009.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
201-MHz NCRF Cavity Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at Fermilab March 16, 2006.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
RFCC Module and RF Cavity Construction
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Institutional Logo Here NCRF Cavities in Strong Magnetic Field: Is This Still an Issue? Derun LI Lawrence Berkeley National Laboratory AAC Workshop, San.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
RF R&D (Issues) for Muon Ionization Cooling Channels
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Overview of the RFCC Module and 201-MHz Cavity Design
NC Accelerator Structures
Physics design on Injector-1 RFQ
SPARC RF gun status by P. Musumeci Review committee
V. Veshcherevich Cornell University
Presentation transcript:

201 MHz NC RF Cavity R&D for Muon Cooling Channels Derun Li Center for Beam Physics International Neutrino Factory Workshop WG-3, Frascati, Italy June 21-26, 2005

Outline Introduction Ionization cooling Requirements of RF cavities for muon cooling RF cavity R&D activities 805 MHz cavity 201 MHz cavity Status of the prototype cavity Be window R&D RF Couplers Summary

Introduction Ionization cooling principle LH Absorbers RF Cavities Strong magnetic field to confine muon beams Lose energy in LH absorbers High gradient RF cavities to compensate for lost longitudinal energy

RF Cavity for Muon Cooling Requirements: Intense muon beams Have short lifetime and large phase space Interact weakly with matter Confined in focusing channels High gradients 17 MV/m at 201 MHz and 34 MV/m at 805 MHz Normal conducting Rounded closed “pillbox” cavity Large and thin Be foils (low-Z) to terminate RF fields High cavity shunt impedance Low peak surface field High accelerating efficiency with independent phase control Less RF power

NCRF Cavity R&D Activities Experimental studies using an 805 MHz pillbox cavity with demountable windows at MTA (Lab G), FNAL Lab G Magnet (MTA) 805 MHz cavity inside Achievable accelerating gradient is a function of external B Be windows withstand high field without surface damage How to interpolate the results to 201 MHz cavities? Does this apply to 201 MHz cavities?

cooling lines on cavity 201 MHz Prototype Cavity Goal: Design, build a 201-MHz cavity with large Be windows, and condition and operate it at 16+ MV/m in a few Tesla magnetic field Cavity and its sub-components Cavity body + water cooling lines Four ports and flanges RF loop couplers Cavity support structure Cavity tuners Ceramic RF windows (~ 4”) Curved Be windows Possible LN temperature operation Cavity design concept Layout of water cooling lines on cavity

The 201 MHz Cavity Parameters The cavity design parameters Frequency: 201.25 MHz β = 0.87 Shunt impedance (VT2/P): ~ 22 MΩ/m Quality factor (Q0): ~ 53,000 Curved Be window with radius and thickness: 21-cm and 0.38-mm Nominal parameters for cooling channels in a neutrino factory For up to ~16 MV/m peak accelerating gradient Peak input RF power ~ 4.6 MW per cavity (assuming 85% of Q0 and 3 times filling time) Average power dissipation per cavity ~ 8.4 kW Average power dissipation per Be window ~ 100 watts

The Cavity Fabrication Finished equator welding We have successfully developed extruding technique for port pulling over e-beam joints E-Beam Welding of Stiffener Ring at J-Lab

The Cavity + Sub-components Ceramic RF window Loop coupler Finished cavity port

EP at J-Lab After 1st EP run last week (June 2005) U-Shape Electrode

Current Status & Near Term Plans Continue EP at J-Lab High pressure water rinsing Vacuum Assembly and base pressure measurement Packing and Shipping Couplers, RF probes, gauges and vacuum pump assembly at the MTA, FNAL Baking at the MTA, FNAL RF conditioning (Ti-N coated copper windows to start with) without magnetic field

Curved Be Windows for 201 MHz Cavity Succeeded in two curved Be windows for the 805-MHz cavity Placed purchase order of three Be windows for 201-MHz cavity: 0.38 mm thick, 420 mm diameter at Brush-Wellman (~100 watts per window with ∆T~ 55 degrees at nominal Study-II parameters) Window is formed by applying a die at elevated temperature Copper frame is brazed to Be window Be windows will be Ti-N coated Present a perfect conducting BC for RF. Min. scattering and mechanically strong 420 mm 420 mm diameter curved Be window for the 201 MHz cavity formed at Brush-Wellman. The formed Be foil is sandwiched (brazed) in two annular Cu frames The curved Be window status: warping (1st one) cracking (2nd) on edge, but usable Two good windows already To be Ti-N coated

RF Coupler Design and Status Loop couplers at critical coupling Prototype coupling loop design uses standard off-the-shelf copper co-axial components Coupling loop has integrated cooling lines Two SNS style RF windows mfg. by Toshiba received (no cost to us !) Two couplers with RF windows are complete High power tested up to 600 kW in TW mode and 2.4 MW (peak) in SW mode Ready to ship to MTA, FNAL Bellows connection required on MICE cooling channel (Study-II) for thermal and dimensional reasons Ceramic RF window Loop coupler

Coupler Conditioning Load RF Power Two couplers Load The two Couplers Conditioning started in the week of May 16, 2005 at SNS Good vacuum ~ low 10-8 T Achieved 600 kW in TW mode (matched load) Achieved 10 kW average power (~ 9 kW average for nominal NF parameters) Achieved 2.4 MW peak power in SW mode (at variable short positions) Ceramic windows work fine in nearly two weeks of the RF conditioning

Mucool Test Area (MTA) Facility to test all components of 805-MHz 201-MHz Facility to test all components of cooling channel, not ionization cooling At high beam power Designed to accommodate full Linac Beam 1.6 X 1013 p/pulse @15 Hz 2.4 X 1014 p/s RF power from Linac: 201 and 805 MHz test stands Waveguides pipe power to MTA Clean room ordered On site assembly of windows Currently plan to operate either RF or LH2/H2 tests, but not both simultaneously. 805 MHz experimental study will resume soon 201 MHz cavity expect to arrive next month

Eight 201 MHz Cavities for MICE Two SC coupling Coils Power couplers Eight 201 MHz cavities The 201 MHz prototype cavity is the baseline design for MICE

Summary MTA is ready to accept high power RF test programs 805 MHz experimental programs will resume soon at MTA, FNAL 201 MHz prototype cavity progress well and expect to be shipped to MTA, FNAL for high power tests next month (July 2005) Significant progress on fabrication of curved Be windows RF couplers have been high power tested and ready for assembly at the MTA, FNAL MUCOOL 201 MHz cavity is the baseline design for MICE