Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, 13-15 November 2013 I. El Hardouz,

Slides:



Advertisements
Similar presentations
MAINTENANCE MANAGEMENT Module 9
Advertisements

Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
KPI Familiarisation.
Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
Welcome to CERN Accelerating Science and Innovation 2 nd March 2015 – Bidders Conference – DO-29161/EN.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
An overview of the CERN CMMS
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
Computerised Maintenance Management Systems
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Enterprise Asset Management
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
MP5 migration: D7i – P. Martel & B. Vercoutter – TS Workshop Archamps – May 25 th 2005 – EDMS Agenda New Functionalities and Possibilities Underused.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Food Safety Act, food hygiene regulations, HACCP, HASAWA, HSE.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
Thursday 6 th May 2004 C. Martel – Cooling Ventilation - CERN TS/CV TS/CV/BE COOLING VENTILATION TECHNICAL DESIGN OFFICE TS Workshop Archamps 2004.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
EN-CV interventions during YETS
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Chris Reichart Appointed Process Assignment November 6, 2015.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Computerised Maintenance Management Systems
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Damien Lafarge on behalf of MMP Engineering Department Work Organization, Maintenance Planning and Maintenance Experience session Pierre Bonnal Christophe.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
TE-CRG Activities D. Delikaris, TE-CRG.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
Bidders conference IT-4088 Water treatment contract 20 th May 2016.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
I. Bergevoet - Training preparation
Situation of the Static Var Compensators at CERN.
Performance monitoring framework for the technical infrastructure
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Workshop: Materials Use
CV maintenance works during YETS
An-Najah National University
COOLING & VENTILATION INFRASTRUCTURE
EN-CV: P8 systems and Detector Cooling
KPI Familiarisation
Maintenance at ALBA facility: Strategy for the conventional services
Infor EAM in the Handling Engineering Group at CERN
Presentation transcript:

Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz, U. Epting, S. Poulsen, G. Peon (CERN EN/CV)

Summary Definitions and Acronyms Introduction to EN/CV Overview of EN/CV Maintenance CMMS in EN/CV Key Performance Indicators Meter Readings Conditional Maintenance Summary Conclusions 13/Nov/2013AMMW20132

Definitions and Acronyms Position Hierarchical structure – Parent – Child MP: Maintenance Plan PM: Preventive Maintenance CM: Corrective Maintenance WO: Work Order 13/Nov/2013AMMW20133

Equipment Structure 13/Nov/2013AMMW20134

Introduction to EN/CV The CV group is responsible for the CERN Cooling and Ventilation installations: DESIGN WORKS OPERATION MAINTENANCE ACCELERATORS DETECTORS EXPERIMENTAL AREAS COMPUTER CENTER 13/Nov/2013AMMW20135

Introduction to EN/CV HVAC: Tunnel Experimental caverns Service caverns Pressurized safe areas Surface “machine” buildings Smoke and Gas Extraction Systems Water Systems: Primary water Demineralised water Chilled water Mixed water Reject water Sanitary water Fire fighting water Compressed air systems Electricity Control and supervision systems A total of pieces of equipment 13/Nov/2013AMMW20136

Cooling and distribution Cooling towers (450 MW) 22 Chilled water production : 6-12 o C (73 MW) 35 Cooling plants (raw water, demineralized water, C 3 F 8, C 6 F 14 ) 150 Distribution Pipework 800 km Total water consumption 5'400 m 3 /h 13/Nov/2013AMMW20137 Equivalent to 10% consumption Geneva Canton

Ventilation, Fluid Systems HVAC 1’500 units from 2’000 to 120’000 m3/h per unit Fire fighting systems 800 points Compressed air 14 installations distribution network 200 km Demineralised water production 20 m3/h μS/cm 13/Nov/2013AMMW20138

Overview of EN/CV Maintenance The general activities are covered by just two contractors Other particular activities are assigned to specialised contractors, i.e. water treatment Their work is divided in geographical areas – PS complex plus 50% of the LHC installations – SPS complex plus 50% of the LHC installations Stand by interventions: – PS, SPS: Contractors – LHC, CERN Computing Centre: CERN Maintenance Budget of 6MCHF/yr Asset Value of 600MCHF 13/Nov/2013AMMW20139

Organisation of the Preventive Maintenance 13/Nov/2013AMMW201310

Preventive Maintenance Maintenance Plans MPs generates WOs at the level of the Parent The WOs point to Maintenance Procedures according to the equipment installed within the Parent The MPs automate provisional WO start and end dates 13/Nov/2013AMMW201311

Organisation of the Corrective Maintenance 13/Nov/2013AMMW201312

CMMS in EN/CV CV utilizes mainly the following modules in INFOR EAM Equipment Assets Positions Parts Structure Stores Spare Parts Pick Tickets Reservation Requisition Purchase orders Parts labelling Minimum stocks Works Work requests Work orders (WO) Maintenance plans Inspections Meter readings 13/Nov/2013AMMW201313

Information in the WOs 13/Nov/2013AMMW Dates in WOs Filled by the system Event date: date of WO creation Filled by CV personnel Requested start date Requested end date Filled by contractors’ personnel Schedule start date Schedule end date Actual start and end dates Request and delivery of spares Other Information: Filled by CV personnel Information to assess the work Contact person Particular safety issues Filled by contractors’ personnel «Assigned to» Booked hours for a particular employee and day Description of the work done Spare parts used Tests carried out …

13/Nov/2013AMMW201315

13/Nov/2013AMMW201316

Main KPI: Contractor Performance 13/Nov/2013AMMW201317

Main KPIs: Equipment Condition 13/Nov/2013AMMW201318

Main KPIs : Reactivity 13/Nov/2013AMMW201319

13/Nov/2013AMMW Main KPIs : Overall performance

Examples of two KPIs over time 13/Nov/2013AMMW201321

Meter Readings in the CV group Meter readings for different equipment – Air Compressors – Trane Chillers Frequency – Different intervals: e.g. weekly, twice per year – Configured via Infor EAM PM Schedules Visualization – Infor EAM Custom Tab: “Inspections & Readings” Tools for data entry – GS-ASE Infor EAM Mobile (Psion handheld) – EN-CV smartphone application 13/Nov/2013AMMW201322

Meter Readings: CV Smartphone Application Webpage application optimised for smartphones It organizes the data collection by PM Schedule (can comprise equipment of different Classes) No investment required for proprietary equipment and can be on operators personal device (Bring-Your-Own-Device) It can also be used from any platform with a Web browser (including Psion Ikon) It works off-line in areas without GSM/WiFi It is very responsive 13/Nov/2013AMMW201323

Meter readings: Ex. Historical data of chiller FCK /Nov/2013AMMW201324

Mechanical revision 40000h and cleaning of a chiller in bldg. 355, 378 … before and after cleaning bldg /Nov/2013AMMW201325

Conditional Maintenance: Vibration analyses 13/Nov/2013AMMW201326

Conditional Maintenance: Vibration analyses 13/Nov/2013AMMW201327

Conditional Maintenance: Vibration analyses 13/Nov/2013AMMW201328

Conditional Maintenance: Vibration analyses 13/Nov/2013AMMW201329

Summary EN/CV utilises the main modules of INFOR EAM Information entered by the System, CV staff and Maintenance contractors is crucial to assess the different actors in maintenance CV makes use of tailored made KPI to pinpoint weak and strong points in the Maintenance activities Particular Meter Readings are valuable information to trigger conditional maintenance in some equipment such chillers and compressors A specific project has been made for Conditional Maintenance based on Vibration measurements 13/Nov/2013AMMW201330

Conclusions Structure of equipment it reduces the intervention time for all the maintenance participants KPIs, utilised to better monitor the Maintenance Activity and plants condition to: – Support the decisions by the CERN management – Take actions by Stores and Operations – Manage of Contractors – Repair and improve the installations Meter readings – Faster data entry and interpretation of results – Clearer vision of the equipment utilization over time Vibration analysis – Detect risk and allow for intervention before breakdown 13/Nov/2013AMMW201331

THANK YOU FOR YOUR ATTENTION!! 13/Nov/2013AMMW201332