THE ECOLOGICAL MONITORING CENTER
2 JSC “Belgorkhimprom” Activity
3 EMC Work Direction
4 Partners in the Republic of Belarus
5 PRL of Project “PA “Belaruskali” GAS SUPPLY OF THE 2 nd ORE DEPARTMENT OF RUE «PA «Belaruskali» Project proponent : Carbon finance share – from 8,6% to 11,5% from the project cost Greenhouse gases emission reduction – t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs ,2 thousand €
6 PRL of Project “PA “Belaruskali” GAS SUPPLY OF THE 3 nd ORE DEPARTMENT OF RUE«PA “BELARUSKALI” GAS SUPPLY OF THE 3 nd ORE DEPARTMENT OF RUE «PA “BELARUSKALI” Project proponent: Carbon finance share – From 4,8% to 6,4% from project cost Greenhouse gases emission reduction – t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs thousand €
7 PRL of Project “PA “Belaruskalii” CO-GENERATIONAL ENERGYGENERATING INSTALLATION CONSTRUCTION WITH RECOVERY BOILERS ON THE TERMAL POWER PLANT OF THE 1 st ORE DEPARTMENT Greenhouse gases emission reduction in 2012– t СО 2 /year Project realization costs thousand € Carbon finance share – from 2,4% to 3,2% from the project cost Project proponent : Own electricity production increase in more than 2 times. Actual annual fuel economy on replacement of electrical power system n. m 3 gas. Reduce of contaminant emissions to the atmosphere in quantity of 79,841 t/year.
8 JSC “Grodno Khimvolokno” project IMPLEMENTATION OF 4,5-6 MW DEFINED CAPACITY WIND-DRIVEN POWER PLANT In the result of wind-driven power plant implementation producing of electric energy without СО 2 In the result of wind-driven power plant implementation producing of electric energy without СО 2 is assumed Annual income from generated ERU sale – from € to € Greenhouse gases emission reduction– t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs thousand €
9 JSC “Grodno Khimvolokno” project ENERGY COMPLEX RECONSTRUCTIONUSING POWER EFFICIENT ENERGY COMPLEX RECONSTRUCTION USING POWER EFFICIENTTECHNOLOGY Greenhouse gases emission reduction– t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs thousand € Carbon finance share (a year) – from 2,7% to 3,6% from the project cost
10 Facility “Polimir” JSC “Naftan” project CONSTRUCTION 0F9 MW ENERGOTECHNOLOGICAL COGENERATION UNIT WORKING ON THERMAL WASTE ENERGY CONSTRUCTION 0F 9 MW ENERGOTECHNOLOGICAL COGENERATION UNIT WORKING ON THERMAL WASTE ENERGY Annual income from generated ERU sale – from ,5 € to € Greenhouse gases emission reduction – t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs thousand € Gas-pumping unit (GPU) utilization involves usage of 757 m 3 /h of natural gas. Fuel gas (mixture of МВФ 93.7% and natural gas – 6,3%) usage will remain at the same level as before project realization.
11 JSC “Belshina” project ENERGY LARGE-SIZE TYRE PLANT COMPLEX RECONSTRACTION BASED ON CO-GENERATIONENERGOTECHNOLOGICAL INSTALATIONS BASED ON CO-GENERATION ENERGOTECHNOLOGICAL INSTALATIONS Greenhouse gases emission reduction – t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs thousand € Annual income from generated ERU sale – from ,5 € to €
12 JSC “Polotsk-Svetlovolokno” project GLASS-WORKED ARC №4 MODERNIZATION Greenhouse gases emission reduction – t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – t СО 2 Project realization costs thousand € (costs of 2006 ) Carbon finance share (in a year) – from 2,2% to 2,9% from project cost Implementation of electric heating additional system on existing direct-fire kiln for increasing arc efficiency.
13 JSC “Grodno Azot” project 16 MW (2x8 MW) GAS TURBINE POWER PLANT CONSTRUCTION. SECOND PHASE Greenhouse gases emission reduction – t СО 2 /year Greenhouse gases emission reduction in a period from 2010 to 2012 – t СО 2 Project realization costs thousand € Annual income from generated ERU sale from € to €
14 JSC “Grodno Azot” project As the result of project secondary decomposition catalyst installation in nitric acid production reactor at enterprise would be installed. NITROUS OXIDE GENERATION SUPPRESSION (N 2 O) Greenhouse gases emission reduction – 2009: tons СО2 2010: tons СО2 2011: tons СО2 2012: tons СО2 Greenhouse gases emission reduction in a period to 2012 – t СО 2 Project realization costs thousand € (costs of 2006 ) Annual income from generated ERU sale from 1,8 million € to 3,05 million €
15 СО 2 emission reduction on the projects of
16 СО 2 emission reduction on the projects of
17 СО 2 emission reduction on the projects of 2009
18 СО 2 emission reduction on the projects of 2009
19 Our offers Adoption and implementation of new power-efficient ecological technologies in realizable projects. Application of the latest process plants of the institute in mining and chemical field in the projects implemented by our partners. Application of the latest technologies of wind, solar energy, biogas and biomass usage in different projects. Joint research activities aimed at the creation of new technologies in the field of power engineering and energy efficiency. Joint implementation of projects within the framework of Kyoto protocol and the mechanism of voluntary greenhouse gas emission reduction. Energy inspection and audit. Protection of patent rights on the technologies and their usage. Joint participation in European ecological programmes.
20 Contact information JSC “Belgorkhimprom” The Ecological Monitoring Center Masherov avenue, 17 Telephone: (8017) Fax: (8017) Site: Telephone: (8017)