Arizona 511 Model Deployment Matt Burt – Battelle Talking Operations Webcast Rural Issues: 511 and Traveler Information July 27, 2005.

Slides:



Advertisements
Similar presentations
1 User Perspective on Deploying 511 Al Kosik Director, Traffic Management Section TxDOT National Transportation Operations Coalition Talking Operations.
Advertisements

Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Kansas City 511 Kansas City ITS Symposium May 6, 2009 Presented by: Barb Blue, ATIS/511 Program Manager Kansas Department of Transportation (KDOT)
Wade E. Kline, AICP Community Development Planner.
Importing Transfer Equivalencies: How to Maximize Efficiency How Columbia College Office of Registrar improved productivity through third party solutions.
OJJDP Performance Measurement Training 1 Incorporating Performance Measurement in the Formula Grant RFP and Application Format Presenter: Pat Cervera,
North Carolina’s Integration of 511 and Workzone Information Jo Ann Oerter State Technology Implementation and Maintenance Engineer North Carolina Department.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
A Travel Information Service for New York State Outreach & Information Sharing Session New York State Department of Transportation.
Lawrence Regional ITS Architecture Update. Today’s Agenda What is ITS? Review 2007 ITS Plans Review the proposed work plan Define project goals and objectives.
San Antonio TransGuide Travel Time Program Roger L. Strain Research Analyst Southwest Research Institute San Antonio, TX
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
1 Analysys Mason undertook an international programme of customer satisfaction research for a telecoms billing system vendor  A billing systems vendor.
The Use of IPASS to Improve Mobility and Safety Through Traveler Information April 2004.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
The Higher Education Innovation Fund Vinnova and British Embassy seminar 21 March 2006.
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
“web to wireless” Technology. A LEADER IN web to wireless ASSET MANAGEMENT ROM Communications Inc.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
1 511 Services “Hit the Road” Kentucky Florida Nebraska Utah San Francisco Iowa.
Travel Times on Dynamic Message Signs Brandy Meehan Transportation Information Management Team Federal Highway Administration September 28, 2005.
Keeping Wisconsin Moving: An Overview of WisDOT’s DMS Travel Times Kelly Langer, WisDOT, Freeway Operations Supervisor.
FHWA Office of Operations Research and Development and American Association of State Highway and Transportation Officials (AASHTO) AASHTO National Connected.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
Rural Intersection Collision Avoidance System (RICAS) US Highway 53 and State Highway 73 Minong, Wisconsin Additional information Project Website:
Joint Infant and Toddler Steering Committee/Early Learning Regional Coalition Statewide Meeting “Using our Data for Continuous Improvement” Organizational.
Outline Project Background ITS Architecture Overview GVMC ITS Architecture Deployment Plan.
SHRP 2 TOOL EXAMPLES Minnesota Pilot Test Site 1.
Overview of Advanced Traveler Information Systems Evaluations Joseph I. Peters, Ph.D. Manager, ITS Program Assessment U.S. Department of Transportation.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
1 25 th International Conference on IIPS, AMS Annual Meeting, Phoenix, AZ An Update on FHWA Road Weather Management Initiatives Paul Pisano Federal Highway.
Project Proposal: Survey and Assessment of Current Deployment of Applications for Surface Transportation Utilizing GNSS in the APEC Region Maureen Walker.
A Model for Improving Operations through Archived Data 2005 ITS America Annual Meeting Mark Carter – SAIC Robert Haas - SAIC May 2 nd, 2005 i Florida’s.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
Talking Technology & Transportation (T3) Webinar July 25, 2007.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
IMT-2000 Workshop, November 1998 UMTS Forum 1 U M T S F o r u m IMT-2000 The business case and Key Markets IMT-2000 Workshop, St Helier, Jersey,
June 5, Georgia Travel Info Brought to you by.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
PLANNING WORKBOOK TUTORIAL MODULE 3 STEPS FOR DEVELOPING ROADWAY USER AWARENESS AND EDUCATION PROGRAMS FHWA Highway Safety Marketing, Communications, and.
A Summary of State DOT GIS Activities Presented at the 2003 AASHTO GIS-T Symposium Colorado Springs, CO.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Use of MDSS by the City and County of Denver March 14, 2007 Pat Kennedy, P.E. Denver Street Maintenance.
Wisconsin Department of Transportation Emergency Transportation Operations (ETO) Plan October 10, 2008.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
Highway Capacity Manual. Highway Capacity Manual (HCM) Most widely referenced and best selling document of the Transportation Research Board HCM 2000:
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Dust Storms in Arizona: The Challenge to Ensure Motorist Safety Jennifer Toth, P.E. Deputy Director for Transportation Arizona Department of Transportation.
WRAP 2003 Work Plan: Overview and IOC Elements WRAP 2003 Work Plan: Overview and IOC Elements WRAP Board Meeting November 12, 2003 Tempe, AZ Rick Sprott.
IRP, Inc. Report IFTA Annual Business Meeting July 2010.
Educating Students for ITS Careers: Are Universities Meeting the Challenge? Transportation Agencies Perspectives Model Operations Nicolaas P. Swart, P.E.
SAFETEA-LU Section 1201 Real-Time System Management Information 23 CFR Part 511 AASHTO SSOM Task Force on Systems Operations Performance Measures 9 April.
Work Zone Operational Enhancements Jennifer Livingston, P.E. ADOT – Senior Project Manager.
Safety Data Initiatives in Reauthorization – What Can We Expect? Kathy Krause, FHWA Office of Safety 30 th Annual International Traffic Records Forum July.
1 U.S. Department of Transportation ITS Joint Program Office CASE STUDY #3 INTEGRATING THIRD PARTY CROWDSOURCED DATA Elizabeth Birriel, Florida DOT.
Kansas 511 Traveler Information System T3 Webinar January 9, 2008.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Arlington County’s Transit ITS Program Needs Assessment and Planning Study Presented to ITS Virginia | July 17, 2015.
Youth in Focus. Young people’s voices “ money issues are a key thing for me” “the right kind of support is really important to me” “ forming relationships.
May 12, 2006 District Engineer Presentation1 Signing Performance Measures Report 2005 Data.
Nevada Next Generation 511 System 9 months to design, test and deploy
Multi-state Corridor Pooled Fund Program
Overview of Advanced Traveler Information Systems Evaluations
Intersection Conflict Warning Systems
Presentation transcript:

Arizona 511 Model Deployment Matt Burt – Battelle Talking Operations Webcast Rural Issues: 511 and Traveler Information July 27, 2005

- 2 - Organization of the Presentation Arizona 511 Background Evaluation Finding Highlights Statewide/Rural Issues Next Steps

- 3 - Arizona 511 Background Originated as a statewide system in 1998, based on ADOT Highway Condition and Reporting System (HCRS) Operated “in-house” by ADOT Converted to “511” in March types of info: –Roadways (route-based) –Call transfers to transit Touch-tone user interface Little system data available for performance monitoring No formal marketing No user input (did focus groups for Model Deployment)

- 4 - Arizona 511 Background, cont. Arizona awarded $1 million competitive grant in 2002 by U.S. DOT for National 511 Model Deployment ADOT-led coalition of agencies statewide Battelle conducted evaluation on behalf of FHWA Timeline: –Planning - Fall 2002 –Design & Implementation phase – 2002 and 2003 (enhanced system roll-out December 18, 2003) –One year operational phase (for eval.) Jan. - Dec. 2004

- 5 - Arizona 511 Background, cont. Model Deployment enhancements : –User Interface -Voice recognition, roadway segment based reporting –New data -Segment weather -Arterial street travel times (Phoenix demo) -Neighboring state data (Utah) -2-minute voice recording capability for transit, airports, Grand Canyon -Estimated bus arrival times (Phoenix) -Tucson and Phoenix traffic input by local agencies –Premium service partner –Marketing and data quality enhancements

- 6 - Arizona 511 Background, cont. Evaluation analyses: –Usage -Looked at overall patterns and patterns during a major incident, wildfire, winter storm and week-long DMS ads -511 server log files primary source (U of A led) –User Survey -410 surveys completed in November 2004 –Enhancement Process -511 Task Force interviews and workshops –Costs -Fully document costs by enhancement and type (planning, implementation, O&M)

- 7 - Evaluation Finding Highlights Several incomplete enhancements Generally positive reaction from users –Increase in call volumes (74%) –70% (survey) satisfied with information content –90% + (survey) would use again and recommend –~ 20% (survey) cite specific benefits 35% of surveyed users dissatisfied w/voice recognition Very little usage of new information (less than 10% of total menu selections) 57% (survey) say no better or worse than radio traffic as go

- 8 - Evaluation Finding Highlights, cont. Identified a wide range of lessons learned, including: –Invest in formal planning and design documents –Solicit user input during design and refinement –Assume voice recognition implementation will be resource- intensive –Conduct marketing targeted to potential users of new information types –Consider DMS marketing for reaching roadway info. users –Don’t assume regional 511 will replace transit info. lines –Vigorously build support among local agencies for data entry.

- 9 - Statewide/Rural Issues Hard to get new partners to enter data Lack of major border town works against state-to- state sharing Challenges in equating NWS weather data to AZ segments Rural transit helped ID coverage gaps DMS marketing campaign effective for statewide interstate exposure (20x increase) Capacity exhausted during events; use of floodgate message is helpful

Next Steps Continue to work on voice recognition Move ahead with unimplemented model deployment enhancements: –Arterial street travel times –Estimated bus arrival times –Neighboring states Continue to work with local agencies on data entry (traffic, Tucson airport and transit) Install 50 static road signs statewide and continue to build name recognition through marketing

For Further Information Contact: Model Deployment Evaluation: –Matt Burt, Battelle: , Arizona 511 Operations and Model Deployment Project: –Tim Wolfe, ADOT: , –Rick Schuman, PBS&J: (407) x4511,

Perspective on Texas 511 Issues Costs –ADOT shoulders costs for “basic service” (no viable premium service partner found) –Costs to expand/enhance system ($1.4M) were 3 times greater than cost of original system Evolution to statewide system –Started statewide (ADOT) but there have been challenges in adding new metro areas as active partners –Impact of future call volume increases from Tucson and elsewhere uncertain; could necessitate decentralization of phone system

Perspective on Texas 511 Issues, cont. Relationship to highway closure system –System build around HCRS; HCRS is heart of the system –Challenges in getting local agencies inputting to HCRS; some see as redundant with their own systems

Cost Data - Implementation Deployment Cost Component Pre-Model Deployment 511 System Enhanced (Model Deployment) 511 System Design & Development $ 270,000 $ 406,508 Implementation $ 62,520 $ 1,005,752 Hardware $ 48,370 $ 60,069 Software & Engineering $ 14,150 $ 903,546 Marketing $ - $ 42,137 Total $ 395,040 $ 1,412,260

Cost Data – Operation & Maintenance Annual Operations Cost Component Pre-Model Deployment 511 System Model Deployment Year of Operations Future Years of Operation ADOT staff $ 270 $ 11,770$ 8,658 Consultant support $ 9,400 $ 104,773$ 25,100 HCRS $ 3,000 $ 11,250$ 7,500 IVR $ 6,400 $ 18,714$ 17,600 Program Management $ - $ 74,809$ - Phone charges $ 102,464 $ 139,577 T-1 Line Rental $ 27,600 $ 36,458 Total $ 139,734 $ 292,578$ 209,793