K.K. GanUS ATLAS Review1 Optical Hybrids K.K. Gan The Ohio State University WBS 1.1.1.4.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
sTGC for ATLAS Small Wheel upgrade
1 The World’s Leading Provider of Silicon Photonic Solutions BLAZAR 40 Gigabit QSFP Optical Active Cable Marek Tlalka VP of Marketing
Richard Kass IEEE NSS 11/14/ Richard Kass Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector K.E. Arms, K.K. Gan, M.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
© intec 2000 Packaging of parallel optical interconnects modules with on chip optical access François Marion / Julien Routin (LETI) Ronny Bockstaele /
Optoelectronic Multi-Chip Module Demonstrator System Jason D. Bakos Donald M. Chiarulli, Steven P. Levitan University of Pittsburgh, USA.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Fiber Optic Communication By: Chris Frazier. Introduction What is fiber optics Applications of fiber optics Total Internal Reflection How signals are.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
March, 2013 Presenting: Avner Badihi TECHNOLOGY&MANUFACTURING XLoom Proprietary and Confidential 120GB-300Gb Optical Interconnect Solutions for Optical.
LECC03, 9/30/2003 Richard Kass/OSU 1 Richard Kass Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector K.E. Arms, K.K. Gan, M.
IEEE06/San Diego R. Kass N Bandwidth of Micro Twisted-Pair Cables and Spliced SIMM/GRIN Fibers and Radiation Hardness of PIN/VCSEL Arrays W. Fernando,
SARAN THAMPY D SARAN THAMPY D S7 CSE S7 CSE ROLL NO 17 ROLL NO 17 Optical computing.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
DPF 2013 R. Kass 1 P. Buchholz, M. Ziolkowski Universität Siegen OUTLINE Lessons learned… IBL/nSQP opto-board overview assembly experience radiation hardness.
R. KassIEEE05/Puerto Rico N Radiation-Hard Optical Link for the ATLAS Pixel Detector Richard Kass The Ohio State University W. Fernando, K.K. Gan,
R. KassIEEE04/Rome 1 Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector Richard Kass The Ohio State University K.E. Arms, K.K.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
IEEE08/NSS R. Kass N Radiation-Hard/High-Speed Data Transmission Using Optical Links W. Fernando, K.K. Gan, A. Law, H.P. Kagan, R.D. Kass, J. Moore,
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Ingrid-Maria Gregor (University Wuppertal) for the ATLAS collaboration June 6th, 2000 Optical Links for the ATLAS SCT and Pixel Detector International.
K.K. GanUS ATLAS Pixel Meeting1 Opto-Board K.K. Gan The Ohio State University WBS
R. Kass US LC Conference 1 Design and Fabrication of a Radiation-Hard 500-MHz Digitizer Using Deep Submicron Technology R. Kass The Ohio State University.
Columbia University IN THE CITY OF NEW YORK ROC3' / preproduction ROC Design Status E.J. Mannel StriPixel Review October 1, 2008.
Status report on MURAY telescope R&D
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
ICTPP09 R. Kass Radiation-Hardness of VCSELs & PINs Richard Kass The Ohio State University OUTLINE Introduction/ATLAS pixel detector Radiation Hardness.
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Pin-plate micro assembly by integrating micro-EDM and Nd-YAG laser 指導老師:戴子堯 學生:駱宏明 International Journal of Machine Tools & Manufacture – 1464.
SCT/Pixel Off-detector VCSELs
DPF 2011 R. Kass 1 P. Buchholz, A. Wiese, M. Ziolkowski Universität Siegen OUTLINE Introduction Result on 4-channel Driver/Receiver with Redundancy Design.
K.K. GanUS ATLAS Pixel Meeting1 Opto-IC/Board K.K. Gan The Ohio State University WBS & 4 July 9, 2003.
PIN current degradation Versus 3 MeV proton fluence 3 MeV proton (a)(b) (c)(d) Study of radiation damage in VCSELs and PINs for the optical links of the.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Optical InterLinks LLC (OIL)----- GuideLink ™ Polymer Waveguide Products Multichannel Monolithic Data Network Monitoring Taps Using OIL’s Polymer Waveguide.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
EC: 7 DISK concept Preliminary considerations
GEM Integrated PCB readout and cooling
The STS-module-assembly:
Laser cutting system.
Detector building Notes of our discussion
Backward Calorimetry For SuperB
Mechanics: (Tim).
Status report of the ATLAS SCT optical links
Silicon pixel detectors and electronics for hybrid photon detectors
ME instrument and in-orbit performance
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
Updates on the Silicon Tracker 2S Module
Presentation transcript:

K.K. GanUS ATLAS Review1 Optical Hybrids K.K. Gan The Ohio State University WBS

K.K. GanUS ATLAS Review2 Outline l Introduction l Opto-package prototypes l Opto-hybrid board design l Cost and schedule summary l Conclusions

K.K. GanUS ATLAS Review3 ATLAS Pixel Opto-link

K.K. GanUS ATLAS Review4 l 2 fibres + VCSEL + PIN l coupled VCSEL power > 300  10 mA l VCSEL tolerance: l 50  m in z (along fibre) l 25  m in r (transverse to fibre) Opto-package

K.K. GanUS ATLAS Review5 l Marconi P 8 silicon/alumina pieces P use silicon mirror for 45 0 light reflection P high cost l Taiwan P 3 G-10 pieces P cleave fibre at 45 0 P fibers permanently attached: need voliton connector P low cost l OSU P 2 pieces P cap with fibers can be attached to package at end of module assembly P low cost Opto-package Designs

K.K. GanUS ATLAS Review6 l connector concept design P use precisely fabricated cap and base for alignment P simple two-piece design for mass production and cost reduction l cap P 2 holes for fibers l base P deposit gold traces for wire bonding, VCSEL and PIN placements OSU Design

K.K. GanUS ATLAS Review7 Base and Cap

K.K. GanUS ATLAS Review8 l produced caps and bases (rounded corners) using machinable ceramic P material tested: aluminum silicate and macor P difficult to obtain consistent precision  redesign base with square corners for ease of fabrication by Hybrid-Tek P alumina sheet ground to proper thickness and cut into strips P have produced bases with precision within specification P 3D traces have good connectivity  fabricate cap with Ultem (polyetherimide) for radiation tolerance (10 Grad) P use manual micro mold injection to save development time P can fabricate several quality caps per hour Cap and Base Prototypes

K.K. GanUS ATLAS Review9 l produced 10 packages l VCSELs have fast rise and fall time: < 1 ns l PINs have good responsitivity: 0.5 A/W l coupled power > 300  W in both VCSELs simultaneously for 8 packages with different combinations of bases and caps  demonstrated feasibility of fabricating high precision caps and bases l no cross-talk between VCSEL and PIN above 20  Prototype Result

K.K. GanUS ATLAS Review10 Cap with Precisely Fabricated Cavity

K.K. GanUS ATLAS Review11 Base with PIN and VCSELs

K.K. GanUS ATLAS Review12 Completed Opto-package

K.K. GanUS ATLAS Review13

K.K. GanUS ATLAS Review14 no cross talk above 20  A

K.K. GanUS ATLAS Review15 l principle of two-piece connector concept demonstrated P precision bases with 3D traces of good connectivity fabricated P precision caps fabricated  packages produce optical power above specification  negligible cross-talk between VCSEL and PIN l ability to produce precise die placement jig is a concern P required six trials (one week) for current jig Summary on Opto-package

K.K. GanUS ATLAS Review16 l convert optical signal into electrical signal and vice verse l contains 6 sets of opto-pack, VDC, and DORIC l electrical signal to/from module channel through 60-pin connector l layout to serve 7 modules is ready P will convert to serve 6 modules P first submission will use FR-4 for cost saving P 2nd and 3rd prototypes will use BeO l board is compatible with Taiwan opto-pack Opto-hybrid Board

K.K. GanUS ATLAS Review17 Opto-hybrid

K.K. GanUS ATLAS Review18

K.K. GanUS ATLAS Review19

K.K. GanUS ATLAS Review20 l principle of fabrication of opto-pack demonstrated l no major technical challenge in opto-hybrid board fabrication P compatible with Taiwan opto-pack P experience in opto-pack prototyping is very useful for mounting opto-packs on opto-hybrid board Conclusions