Developing the Program Module 5.  Different aspects of the ITCP will be identified and developed during the various construction phases of a project.

Slides:



Advertisements
Similar presentations
Roles and Responsibilities. A good ITCP program may involve a number of key people: Safety Professional Inspectors/Quality Control Superintendent/ Project.
Advertisements

How would you like it if people drove their cars thru your office?
Temporary Traffic Control Elements
Developed by Western Iowa Tech Community College This material was produced under a grant (SH20836SHO) from the Occupational Safety and Health Administration,
Virginia Department of Education
“Highway Construction Work Zones and Traffic Control Hazards” A Training Program developed under a Susan Harwood grant from OSHA Prepared by Wayne State.
Developing the Program.  Different aspects of the ITCP will be identified and developed during the various construction phases of a project.  Depending.
Technology Solutions. There are a variety of technologies—old and new—that have been developed to warn drivers and operators when workers on foot are.
Preventing Deaths and Injuries to Public Workers While Working Around Mobile Equipment.
OSHA NOTICE & DISCLAIMER “This material was produced under grant SH20866SH0 from the Occupational Safety and Health Administration, U.S. Department of.
Road Safety & Awareness Training Your “Right to Know” 29 CFR 1926 / DOT MUTCD This material was produced under grant number SH22297-SH1 from OSHA. It does.
SHARING THE ROAD WITH HEAVY VEHICLES You don’t have to be told there are a lot of trucks on the road. But do you always drive or ride with trucks in mind?
SAWMILL SAFETY Module 5 Shipping and Handling “ Assume they can’t see you ”
Best Practices for Mitigating the Effects of Work Zone Intrusions Guidebook Training Video.
ROCHESTER INSTITUTE OF TECHNOLOGY Golf Cart Training.
Safety for Workers on Foot. Safe Practices  Consider worker behavior when developing the ITCP. Determine locations where workers are likely to go.
Hazard identification and Risk assessment
Preventing Runovers and Backovers
Risk Assessment How do we know what we should be working on? This material was produced under grant SH from the Occupational Safety and Health.
Pedestrian and Worker Safety Module 5 1 This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views.
Blind Spots at Intersections and Crosswalks
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Lesson 6 Traffic Safety Protecting People While Stabilizing The Incident.
Systems of Safety Applied to Focus Four Hazards USDOL-OSHA Susan Harwood Grant SHT21005SH0.
Fall Protection Training (OSHA Program) 1 Introduction to OSHA This material was produced under grant number SH F-51 from the Occupational.
1 Intro to OSHA. Susan Harwood Training Grant This material was produced under grant number SH SH0 from the Occupational Safety and Health Administration,
Material Handling Safety This material was produced under the grant SH SH1 from the Occupational Safety and Health Administration, U.S. Department.
Workers’ Rights & Safety in Meatpacking Susan Harwood Training Grant #SH20833SH0.
Safety Training Presentations
1 Machinery and Vehicular Safety. This material was produced under grant number SH F-54 from the Occupational Safety and Health Administration,
Preventing Runovers and Backovers
Module 3: PPE 3.3 Training Susan Harwood Grant Number SH F-23.
Module 3 Flagger Stations
OSHA Safety and Health Regulations Related to SPF Applications
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Module 3: PPE 3.1 Hazard Assessment Susan Harwood Grant Number SH F-23.
Highway Incident Safety For Emergency Responders
This material was produced under grant number SH F-51 from the Occupational Safety and Health Administration, U.S. Department of Labor. It.
Module 1.  Objectives - Provide information about worker rights under OSHA law - Learn how to file a complaint, and rights against discrimination and.
1 Landscaping and Horticulture Safety Introduction to OSHA This material was produced under grant number SH F-54 from the Occupational Safety.
1 Health Hazards. This material was produced under grant number SH F-54 from the Occupational Safety and Health Administration, U.S. Department.
4/1/20101 Contractor Management of Change: Implementation of Vehicle and Equipment Spotting Pre-Task Analysis Card Start Date: May 2010 Texas Operations.
Principles of “Internal Traffic Control” for Roadway Construction Module 2.
Safety for Workers on Foot Module 3. Safe Practices.
Big Four Construction Hazards: Struck-by Hazards This material was produced under grant number 46F5-HT03 and modify under grants numbers SH F-72.
Developed by: Purdue University Agricultural Safety and Health Program Department of Agricultural and Biological Engineering West Lafayette, IN This material.
Productivity. PLANNING  The key concept behind Internal Traffic Control is PLANNING for worker safety.  ITCPs integrate other aspects of planning to.
Module 5: Fire Protection
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.4 Gangways and Signs Susan Harwood Grant Number SH F-23.
Cart Training California Lutheran University Safety and Security.
Passing!.
Down To Zero ̶ Eliminate Falls/Save Lives
Construction Vehicle Access and Egress Module 4.  Access to- and egress from work zones presents significant challenges. Hazards are compounded when.
Module 5: Operations & Hot Work 5.3 Hot Work, Permits, and Inspections Susan Harwood Grant Number SH F-23.
OSHA NOTICE & DISCLAIMER “This material was produced under grant SH20866SH0 from the Occupational Safety and Health Administration, U.S. Department of.
2. Compliance with Standards Process Safety Management for Biodiesel This material was produced under grant SH F-36 from the Occupational Safety.
CDM Construction Design and Management
Non-Ferrous Founders’ Society Safety & Health Training Program Hazard Communication/GHS Training Program Section 1: Worker’s Rights under OSHA © 2015 All.
Work Place Transport. Members of the BPF Health & Safety Committee.
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
A Toolbox Talk for Pedestrian Safety In Quarries and Surface Mining
Learning aim B: Explore how sub-structures are constructed
Nighttime Backing Hazards
Shipyard Machinery and Power Tool Safety
Union College Utility Cart Safety Program
Big Four Construction Hazards: Fall Hazards
Vehicle Movement - Surfacing
Training Presentation Truck Controller- Surfacing
Equipment Spotter Safety Continuing Education Fourth Quarter 2019
Presentation transcript:

Developing the Program Module 5

 Different aspects of the ITCP will be identified and developed during the various construction phases of a project.  Depending on the phase, different people will be involved in the process.

 Bidding and Planning Stages – Right of Way – Temporary Traffic Control – Risk Assessment – Equipment Selection/ Identification – Subcontractor Selection and Coordination

 Negotiation of Responsibilities  Assigning Duties – Meeting Participation – Use of Law Enforcement – Location of Access/ Egress Points – Lane Encroachments

 Responsibilities – The safety professional employees; assists in developing the ITCP; performs audits – The site supervisor assists in developing the ITCP – The fore/lead person develops and implements the ITCP

 Subcontractor selection, buy-in and communications (e.g. trucking, excavation, etc.)  Owner/agency coordination and communications  Selection of equipment – Smaller blind spots – Adding cameras/proximity warning

1.ITCP Diagram(s) 2.ITCP Notes – Injury Reduction Measures – Site Specific Conditions/Provisions – Duties – Equipment/Personnel List – Notes on Safety Points 3.Key to ITCP Drawings

 ITCP Key Paver= Full Truck= Empty Truck= Tack Truck= Roller= Water Truck= Worker-Free Zone= Construction Barrel= Grader= Car=

 Identify project scope and plan scope, as these vary from job-to- job  Identify the operation that will take place (Paving, Trenching, Earthmoving, etc.)  Identify the individuals who will be involved (safety professional, foreman, superintendent, truck boss, DOT inspector, visitors)

 Review the site plan: – Where will the operation take place? – What equipment will be involved? – Where will workers on foot need to be located? – What is the traffic control plan?

 Review the site plan (continued): – Where are the access/egress points? – How often will deliveries be made or loads removed? – How quickly will the work progress?

 Implement Communications Plan: – Who will develop the ITCP? – Who will execute the ITCP? – Who will instruct project leaders? Site employees? Operators? Subcontractors? Truck Drivers?  Once communications are in order, your plan is complete

 Draw the basic work area layout – May be taken from the Temporary Traffic Control Plan  The drawing need not be to scale, but should be sufficient size all drawing of vehicle and pedestrian worker paths  Plot the pedestrian worker and vehicles paths using ITCP principles

 Plot worker on foot locations  Plot equipment and vehicle locations  Plot vehicle and equipment paths including access/egress points for dump trucks and other site visitors  Plot location of utilities, storage areas and other obstacles or hazards

 Create plan “notes” explaining the diagram. – Specify duties of all involved personnel – Consider posting signs indicating “worker free zones” and “equipment free zones” – Consider posting speed limits inside the work space – Include other injury-reducing measures

12

12

Roller Spotter Traffic Direction

Draw an ITCP for a simple paving operation

Safety Notes Stay in trucks except at lunch Wear your vest on site Reduce speed near paver and rollers to 15 mph, never enter high range Caution entering and exiting site on to active traffic Ticket taker shall wait until the truck is at the windrow to take the load ticket When possible, stay on the driver’s side of the vehicle Park pick-up trucks out of active truck travel lane, or equipment path, if possible on the shoulder Park behind the operation Place samples off the side of the road Equipment l List 2 Rollers 1 Paver/Pick-up Machine 1 Tack Truck 1 Water Truck 1 Mechanic Truck 1 Broom 2 Quality Trucks 2 State Trucks 8 Dump Trucks Personnel List 2 Roller Operators 1 Paver Operator 1 Screed Operator 1 Ground Worker 1 Foreman 2 Quality Control 2 State Inspector

 Determine locations for equipment and personnel  Determine where workers on foot are likely to face hazards: – Backing Zones – Access/Egress Points – Work Activity Sites – Worker Paths to Rest Areas – Large Equipment Paths – Utilities – Site Visitors/Parking – Material Storage Locations and Movement

Create Your Own Internal Traffic Control Plan

End Module Five “This material was produced under the grant SH F-11 from the Occupational Safety and Health Administration, U.S. Department of Labor, and contract M from the National Institute for Occupational Safety and Health. It does not necessarily reflect the views or policies of the U.S. Department of Labor or U.S. Department of Health and Human Services, respectively, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.”