By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.

Slides:



Advertisements
Similar presentations
Public-Private Partnerships for infrastructure in the European Union Chris Hurst Director, Infrastructure Department.
Advertisements

HEAT TRACING SPECIALIST
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Milton Caplan Dr. Terry Thompson PBNC Vancouver, August, 2014 NEW NUCLEAR PLANT DEVELOPMENT - BALANCING LOCALIZATION WITH COMPETITIVENESS.
Fachgebiet Projektmanagement 3. Kasseler PM-Symposium 2007 K. Spang: Partnerschaft zwischen AG und AN – die Zukunft des Bauens Chair of Project Management.
Starting an Innovation Process Life of any business is finite. For companies to endure, the drive for efficiency must be combined with excellence in.
Contracting in the New Economy June 2007 Managing Construction Projects In Today’s Environment Aecon Atlantic Group Presented by Frank Ross, President.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
P ROJECT O WNERS SHOULD INCREASINGLY ADOPT THE C OST P LUS MODEL OVER LSTK P OSITION : A GAINST THE M OTION Kuwait City, Kuwait - 12 th June 2011 PMI AGC.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Supply Chain Management
© 2002, D.Lyftogt, IDC Capturing Market Share With Partner and Influencers: AIP Implementation Assistance Dennis Lyftogt, Principal.
PROJECT DELIVERY SYSTEMS
OUTLOOK FOR FPSO ORDERS OVER THE NEXT FIVE YEARS Presentation by Jim McCaul at the Global FPSO Forum 25 September 2014.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
XII- COST CONTROL, MONITORING & ACCOUNTING
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Benchmarking at Saudi Aramco
Introductions Mike Dement Multi Management Services
Process Engineer’s Role in Project Management Dr Abdullah Malik.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Financing Urban Public Infrastructure
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Implications of a contractor Failure. Implications of Contract Failure Costs –Lost Revenue –Poor Service Delivery –Cost and effort of ongoing risk mitigation.
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
Prospects, issues, and implications of gas exploration in the Eastern Mediterranean Focus on energy developments and commercial dynamics in Cyprus Prepared.
Commercial Opportunities
Industrial Engineering Roles In Industry
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Risk Management in the Built Environment Management of Risk in Construction By Professor Simon Burtonshaw-Gunn – licensed under the Creative Commons Attribution.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
King Fahd University of Petroleum & Minerals
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
Cash Flow Analysis Part 2 King Saud UniversityCE511- Construction Planning & Control 1.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Introduction Transportation is necessary to:
Gulay Litchfield For CQI-TECH PLC
Tel: Preparing a Business Plan Workshop for McMaster University Campus Incubator Business Plan Challenge September.
State IT Agency Briefing on Annual Report 2014/15 to Parliamentary Portfolio Committee on Telecommunications and Postal Services 16 October 2015.
INTRODUCTION Mehmet Sait Andaç Web: Office: 431.
Published Date: 22 December 2014 No. of pages : 118 Global Air Compressor Market Forecast
INTRODUCTION: The objective of this lesson is to acquaint learners with the roles of the ‘STAKEHOLDERS’ in the business environment. The typical high street.
BPP LEARNING MEDIA CIMA P2 Advanced Management Accounting 熊家财
Global & US Trends in Management Consulting
Rob Connatser NSS Instrument Work Packages and XLPM.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Natural Gas Utilization – Will LNG stay competitive?
Key Concepts Energy Efficiency Resources for Undergraduate Engineering
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Performance Measurement
Surety Performance SystemTM
Surety Performance SystemTM
PROJECT DELIVERY METHODS
Introduction Chapter 1 Copyright ©2016 Pearson Education, Inc.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Construction Contracts
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does Project incubation define Project success?

Introduction FPSOs a popular choice in recent years. Majority of FPSO projects incur significant project delays and budget overruns. Conceptual / Tendering phase a bone of contention

Objective To show the challenges of current Conceptual / Tendering phase practices and how this can affect the success of a FPSO project. To highlight the strategic roadmap to better results

Outline Challenges Key drivers Current practices Impacts and challenges Way forward

Decade Challenges History shows that FPSO projects have a turbulent past. Data Source: IPA

Decade Challenges Cost and schedule overruns regularly surfacing. Successfully executing a FPSO topsides project on time and budget is a serious challenge. Most FPSO projects, and in particular Lease FPSO’s, are fast track projects. Consequently few FPSO lease companies make healthy profits. Many leased FPSO’s struggle to meet expected delivery schedule, production regularity and production rate.

KEY DRIVERS TO THE CHALLENGES

Market Trends Increasing size & complexity (Brazil main driver) Field specific solutions HT & HP wells Heavy Oil Salt and CO2 issues Deep waters Harsh environment Local content at design and construction phase

Why the hurry? The Operator Company have invested a lot of money in Seismic activities and expensive drilling programs. First oil as quickly as possible in order to start return of investment.

CURRENT PRACTICES

Current tendering practices Field Operator spending long time on preparing, however first oil date does not change. Functional specifications. Short bidding period. Pushing risk over to the contractors. FPSOs high profile developments, with senior management “attention”. Schedule commitments made independent of project realities. Consequently definition stages are arbitrarily shortened. Insufficient time to complete definition deliverables.

IMPACTS AND CHALLENGES

Skimped Engineering Definition and its peril Data Source: IPA

Impact of tendering practices FPSO projects are more likely to have upsets… Hence need a more matured conceptual design and a balanced tendering process Data Source: IPA

Increasing the odds Operator Topsides Provider Each contractor different philosophy 3 different layout Redundancy philosophy Options Contractor 1 Contractor 2 Contractor 3

A very basic Tender / FEED Layout Higher level of detailing needed during tender phase. FEED Stage Layout Detailed Engineering Data Layout HP Compression Module Layout comparison for one of Samsung’s past projects.

Chain reaction Slippage of Engineering Deliverables adds to Project costs. Late engineering and its link to cost growth Data Source: IPA

Chain reaction Cost growth in Engineering leads to growth in Fabrication. 50 % growth in Engineering leads to 20% Hull/Topsides fabrication growth. Data Source: IPA

WAY FORWARD…..

Working together Lease contractors pick a strategic partners for various key supplies. Specialists companies can often come up with better, more robust and cost efficient solutions that give added value for client. Early involvement in order to allow sub-contractors sufficient time to make quality bid and reduce risk for both parties Balanced contracts (Back to back)

Project definition phase utilization Front loading effort in the project definition and tendering phase will provide a mature and predictable basis for weight and cost estimate. The design status at authorization may have a significant effect on project cost, schedule:  Basis for equipment design and bulk material quantity  Key element of an accurate cost estimate Late changes to process design after start of detailed design are costly and a threat to delivery schedule.

The bid workflow (typical) Example: Typical time needed for above process 8-10 weeks Example: Typical time given 4-6 weeks

Conceptual Engineering Detail Engineering Fabrication Contract award Tender phase as far as possible towards detail engineering phase. Topside Module EPC Project execution strategy

Potential risks Poor quality information from suppliers/sub contractors. Large number of clarifications and deviations  Example: “A process guarantee is given provided the proper use of chemical injection program” Delivery schedule uncertainties. Variation Orders with significant cost growth.

Way Forward Industry believes FPSO projects that are well defined in Front-End Loading (FEL) stage are better positioned for project success. In order to execute a fast track project to success, it will be necessary to front load concept design effort Arrive at realistic expectations Arrive at firm basic data

Way Forward Front loaded in project definition phase (Owner) Matured Conceptual design (Owner) Participation by key stakeholders during Concept finalization (Owner) Early involvement of potential Contractors….Design competition (Owner) Inject incentives and risk sharing measures (Owner) Focus on Life Cycle cost (Owner / Bidder) Pick a few strategic partners & develop long term relation (Bidder)

Thank you !

Thank you