Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.

Slides:



Advertisements
Similar presentations
Doing Order of Magnitude Cost Estimates (C) 2002 Dr. Bradley C Paul.
Advertisements

Surface Sr. Design Week 7. What You Should Have Distances to Mill and Leach as a Function of Depth Cycle Time Calculations for Proposed Truck Fleets.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
KompoZer. This is what KompoZer will look like with a blank document open. As you can see, there are a lot of icons for beginning users. But don't be.
Sequencing Mining Operations with MineSight® ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Scheduling Discoverer Reports Scheduling Standard Reports Printing & Re-printing Standard Reports Focus on Reports Session 2 To print: Right click Choose.
Senior Design – Week Projects. A General Comment Team leaders need to get me team member assignments.
Week 9. COAL Things Missed Last Week Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year.
MineSight VALP Optimizing Cut-Off Grades © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides.
Classic Open Pit Mining
An Example of Drawing Hard Rock Room and Pillar in MineSight ©2012 Dr. B. C. Paul Note – The screen shots in these slides come from the program MineSight.
Roads in MineSight.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Introduction to Excel 2007 Part 2: Bar Graphs and Histograms February 5, 2008.
Week 5 Senior Design Work on Coal Preparation You have determined that you will use a heavy media plant – Plus ½ inch will go to heavy media baths.
An Introduction to MS Reserve
ABC’s of PowerPoint (Office 2007) Part 1: Basic Vocabulary Part 2: Cursors Part 3: Insert Your Text Part 4: Insert Your Pictures Part 5: Basic Tools &
Please open your laptops, log in to the MyMathLab course web site, and open Daily Quiz 16. IMPORTANT NOTE: If you have time left out of your five minutes.
ExitTOC Run & Route Directions 2003 Editing Run and Route Directions Edulog.nt v9.2 Use the buttons to navigate the training package First PagePreviousNextLast.
Grade Scale Test 1 Results: Average class score after partial credit: __________ Commonly missed questions: #_________________ If you got less than 70%
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Lecture 11 Optimizing Cut-Off Grade Strategy
Week 6/7 (no presentations next week due to SME).
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Adding Content To Your Faculty Page 1.Login 2.Create your Faculty Page 3.
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Calculating Stripping Ratios for Area Strip Mines Mnge 315
Post Break Week 3. Metal Miners This weeks presentation is much improved over last weeks, however, critical design problems remain including – Floating.
Sequencing Mining Operations with MineSight®
Week 4. SME Weirdness There will be no class from the week of Feb. 16 to 20 th Your report on this work load will be presented on Tuesday Feb. 24 th This.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Obtaining Information From the Geologic Block Model
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
SharePoint document libraries I: Introduction to sharing files Sharjah Higher Colleges of Technology presents:
CREATING A TEST IN WORD 2007 Also creating and using equations in Word 2007 Jeff Klamm Tec 539.
Steps in Fleet Selection ©Dr. B. C. Paul 2000, revised 2008 Note- General steps and methodologies found in these slides roughly follow material found.
Processing unknowns (mapping.) June, 2015 The new XR-7.
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Lecture 10 Design of Rough Draft Stage Pits ©2010 Dr. B. C. Paul Note – These Slides contain numerous screen shots from the program MineSight® developed.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Just After Spring Break Sr. Design. Coal Group For Each of Your Coal Seams Define the Boundary of the areas you believe are minable –Provide a plan view.
Your First Lab (No its not a variety of Dog) ©Jan 2008 Dr. B. C. Paul The ideas and techniques given in these slides are considered common knowledge to.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Week 9 ©2012 Dr B C Paul. Coal Trouble in the Board Room –Plans to ignore large amounts of met coal and drop mining your low sulfur coal and cut down.
Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
Design of Belt Conveyors Step #3 Checking Out the Power ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt.
Using Statistical Interpolation to Build Block Models – Part II (Setting up Files and Coding Air Blocks) Using MineSight® ©2007 Dr. B. C. Paul revisions.
Showing the Developer Tab. Windows vs Mac This is one of the places where the Mac and Windows procedures are different. We’ll look at the Windows method.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Mineral Resources. What is a mineral resource? Any [ ] of naturally occurring material in or near the Earth’s crust. – Can be extracted and processed.
Putting Roads and Benches in a Pit ©2012 Dr. B. C. Paul Note – These slides contain screen shots from the program MineSight which was created by Mintec.
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Starting Up MineSight for Your Coal Mine Project.
Unit #4 Carlson Software. Carlson is an Autocad Overlay Designed to build specialized commands into a widely used drawing package Largely 2D or a highly.
Slopes in MSOPT Calculations ©2012 Dr B. C. Paul Note – These Slides are based on and include screen shots from the program MineSight by Mintec. Credit.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
College Advice For my AP monkeys. College Life Welcome to freedom… and lack of discipline, time management, etc. ▫Once you realize you’re responsible.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Weebly Elements, Continued
Site Grading Site Grading Civil Engineering and Architecture
Presentation transcript:

Post Break Week 2

Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact the markets you can actually go after Obviously you loose a lot of long term coal contracts – A side effect – your #5 coal is high chlorine and variable in sulfur content You loose all low chlorine coal markets You loose the ability to blend or average your coal sulfur content which will go up and down without control (unless you have incredible large stockpiles for blending) You have drastic turns in the size of your work crews.

Suggestion You have proven that your longwalls draw only 140 ft ahead of where they are – If you make #5 your timing control you can mine from #6 by room and pillar what ever is needed to keep steady tonnage Since #6 also has high and low sulfur areas you can mine from high or low sulfur areas to balance out the sulfur so long as the areas you mine are at least 140 ft ahead of the #5 longwall #6 can also provide you a low chlorine product (Yes that will cause a very wonky inefficient layout and timing in #6) To keep your own work crews steady use contract miners to mine room and pillar – use company employees to mine longwall – When you hit the weird labor drop around year 36 when you are mining only advance on the west side of the fault send some of your own employees to work room and pillar some place

Preparation Item to Look at You have washability curves on #7, #6, and #5 How high can you make your recovery and still meet your market specs? – You don’t have to go for the same recovery on all size fractions How will the sulfur content (and thus your coal price and markets) change as you mine – What is the average insitu sulfur level each year Get resulting mass balances worked through your coal preparation plant

Metal Miners There were huge problems with drawings last week – Your pits constructed by the expansion tool did not contain variable slopes – Because you never merged your pit surface with the topo surface you did not realize that half of your pit road to the end point at the surface was in the middle of the air Your road may not even come out and meet your other roads

Draw Me Pretty Pictures Your can adjust your pit slope in the pit expansion tool using the “options” tab. You will want to use pit slopes by sectors – Activate MineSight – On the menu at the far right click help On the drop down menu pick the first item “ms3d and compass help” – In the window that opens select the search tab – Type in pit expansion tool – On the list that appears pick pit expansion and then click display Read all about how to do variable slopes in the pit expansion tool You will be doing pit slopes by sector (my guess on how to best do this)

Construct Me Pits First put the borrow pit for Idris’s roads so that you are pre-stripping ore (this does not mean mine ore for use in roads) – Merge the borrow pit with the topo surface – Show me the surface with the borrow pit and roads in place – Show me a report on the borrow pit that shows you did not mine ore Be prepared in later drawing to show that the material you removed in fact was pre-stripping ore you would mine.

Continued Use the pit expansion tool and construct the pit at 3, 6, 9, 12,15,20,25,30,35,and 40 years (assuming a rate for a 40 year mine life) – These pits should honor the variable slopes by direction Use a set of 2D cross sections to show that your expansion pits follow the phase pit outlines produced by MSOPIT – The conveyor slope road in the pit should have a slope of 20% (recommended maximum slope prescribed by CEMA for copper ore) – Use your pit contours from the pit expansion tool and triangulate and surface and then intersect and merge that surface with the topo surface (ie don’t just have a topo surface and the pit contour objects on at the same time) Show that your road into the pit actually exists below ground for its entire length Do the same for your conveyor route Show that your roads and conveyor routes come out to meet your existing roads. (If they do not you may have to rebuild all your roads on the surface and rebalance your cut and fill and redesign your borrow pit).

Check Your Roads with Time Do any of your push-backs destroy the haul roads? – If so do a view of your pit before the push back with a replacement haul road in place before destroying the old haul road – Show that your pit is never without a viable haul road

Check Your Tonnages You already have surfaces created by MSOPIT for different phases of the pit being mined – Use the reserves function in MSOPIT and show the reserves by type and grade that you have between each pit Example – I have a pit surface at year 3 and year 6 – I do not want a total reserves report on the year 3 and the year 6 pit – I want the reserves between the 3 year and 6 year pit Now use the merged surface created from triangulating your pit expansion pit and intersecting it with the topo surface – Create a gridded surface from the topography – Now use the resulting gridded surfaces and MSOPIT to check the reserves between each pit as you actually built them. Compare your reserves by year for theoretical and as built pits – Show that your as built pits are reasonably following the theoretical pits – What is “reasonable” – within about 15% (Rio Tinto does this exercise and requires 5%)

Comment This will require hours and hours of MineSight drawing work – Don’t dump this on one person (he’ll die and won’t finish) – Divide the work up and get everyone doing MineSight drawings – Build the views to demonstrate pit and performance and put them in slides as you go along rather than praying for a 24 hour wonder of putting everything into a slide show at the last minute.