1 Critical Electricity Pricing Issues DME Portfolio Committee 23 May 2007.

Slides:



Advertisements
Similar presentations
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Advertisements

1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Energy for a low-carbon economy 11 November 2010 Presentation by Ernst Venter Executive General Manager Business Growth.
Thabelo Nemaorani April, Economic Background Upper-middle income economy, GDP/cap around $7500 – among the highest in SSA Long period of rapid growth.
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Capital Markets and Resource Mobilization
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
Powering Africa – SAPP Strategies
WORLD ENERGY INVESTMENT OUTLOOK
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
1 An Investment Framework For Clean Energy and Development November 15, 2006 Katherine Sierra Vice President Sustainable Development The World Bank.
Eskom’s contribution to the solar park initiative
Overview of the SAPP and the Energy Network in Southern Africa
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
An Overview of Our Regulatory Proposal
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
PIERRE BLAAUW Infrastructure Bottlenecks and the Civil Engineering Industry.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
NARUC Joint Session, Committees on Electricity and Gas Ellen Lapson, CFA February 19, 2008.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Briefing on Eskom Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
© OECD/IEA 2015 Business Models and Smart Policies for Scaling Up Renewable Energy Dr. Paolo Frankl Head, Renewable Energy Division International Energy.
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE PROGRESS ON INFRASTRUCTURE INVESTMENTS CAPE TOWN 14 JUNE 2006.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
15 November 2011 Response to NCCRWP EKC 1 Response to the NATIONAL CLIMATE CHANGE RESPONSE WHITE PAPER 2011 Presented to The Portfolio Committee on Water.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
RSA 20–year Electricity Generation Policy.
AFRICAN MINERALS & ENERGY FORUM BEE Opportunities in the Electricity Industry Parliamentary Portfolio Committee: Minerals & Energy Prepared by: Cingembo.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Global Power Company of the Year 2001 Proudly South African Minerals and Energy Portfolio Committee 19 March 2003.
The construction industry and economic growth in South Africa P Blaauw.
Presentation to Select Committee on Economic Development
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
MYPD2 APPLICATION 15 OCTOBER 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
Damitha Kumarasinghe Director General
Distribution Tariffs in Brazil
Inquiry into the national electricity supply shortage and load shedding Presented to the Parliamentary Portfolio Committee on Minerals and Energy 28 May.
DEPT OF PUBLIC ENTERPRISES
Eskom Holdings Limited Reg. No. 2002/015527/06
16th Renewable Energy Summit
Report to the UPDEA 39th General Assembly
ILLUSTRATION BASED ON 31 AUGUST 2016 Total Generated Eskom Generated
Presentation transcript:

1 Critical Electricity Pricing Issues DME Portfolio Committee 23 May 2007

2 THE BRIEF To address the committee on the following: Affordability, reliability and accesibility to electricity for all South Africans; The Eskom price increase of 18% - what informed this significant increase; The Eskom view on the pricing methodology developed by NERSA

3 Peak demand (MW) Reserve margin = 25% Reserve margin = 20% Reserve margin = 16% Reserve margin aspiration = 15% Reserve margin = 8- 10%

4 Capacity expansion - driven by long term demand forecast Eskom position based on 4% growth electricity growth supporting 6% economic growth MW MW Eskom moderate position 2.3% electricity growth based economic growth of 4%

5 Capital Expenditure - R150bn 72%  Mothballed stations  2 Coal base load stations  Hydro and gas options  Nuclear plant  Refurbishment 2% 14%  Lines and cables  Network improvements  Refurbishment 12%  Network strengthening  Cater for growth  Refurbishment Generation Transmission Distribution Corporate

6 Research PBMR UCG Concentrating Solar Cogeneration Hydro Nuclear Gas Coal Solar Transmission Renewables * Red outer circle indicates – out of Borders project Opportunity Identification New Coal Supply Oscar Yankee Discard Coal November Victor Gas 2 Zulu Mike Hwange Coal 1 Hydro 1 CBM Coal 2 Non Eskom Generation 1 Hydro 2 Whiskey MW Pre-feasibility Tango Sierra Co-Gen 1 Foxtrot HVDC 1 Golf Nuclear n MW Feasibility, Business Case, Contract Concluding India Lima Papa Nuclear 1 Echo Quebec Delta Juliett Kilo Bravo MW Build Renewable 1 Ingula Komati Camden Grootvlei Medupi Arnot P1&P2 Gas 1 OCGT 400kV 765kV MW Capacity projects funnel

7 Generation Major Projects Major Generation Projects ProjectTypeProject Approval R billion MWApproval Date1st UnitProject Completion CamdenCoal Dec-03Jul-05Mar-08 GrootvleiCoal Dec-03Sep-07Oct-09 KomatiCoal Dec-04Sep-08Oct-11 MedupiCoal Dec-05Apr-11Jan-15 ArnotCoal1.0300Jun-05Apr-06Nov-10 Commercial windWind1.1100Dec-06Dec-09Dec-10 Angerlik & Gourikwa (OCGT) Gas Jun-05Jan-07May-07 GAS 1Gas Aug-06May-08Sep-08 IngulaPump storage Mar-06Mar-12Dec-12 Kriel refurbishmentCoal1.6-Dec-04Nov-06Nov-11 Matla refurbishmentCoal1.9-Dec-06Apr-09Apr-14 Majuba RailRailway1.9-Dec-04N/ADec-09 Bravo *Coal Mar-07Mar-12Dec-15 Total * Awaiting PFMA approval

8 Transmission projects BLOEMFONTEIN DE AAR KOMATIPOORT RICHARD'S BAY WITBANK Namibia Botswana Mozambique Swaziland CAPE TOWN DURBAN EAST LONDON PORT ELIZABETH PRETORIA DE AAR Mercury Perseus Hydra Gamma Omega Kudu kV 400 kV Matimba 2009/10 for integration of project Alpha Marang Dinaledi Grassridge Eros Delphi Neptune BEAUFORT WEST Juno Bloemfontein 2009

9 Transmission Major Projects Major Transmission Projects ProjectTypeProject Approval R millionApproval DateProject Completion Cape Strengthening WG400kV line & substations1100Mar-04Jun-07 Line reinsulation (Western & Southern Grid)Lines192Mar-06Mar-08 Substation reinsulation (Western & Southern Grid)Substation212Apr-06Apr-10 Camden HV YardSubstation70Apr-04Sep-07 Komati HV YardSubstation145May-06Apr-09 Gourikwa HV Yard400kV line & substation166Jul-05May-07 Ankerlig HV Yard400kV line & Substations170Jul-05May-07 Grootvlei HV YardSubstation123Oct-05Apr-08 ErosSubstation81Sep-05Dec-07 Majuba Umfolozi765kV line & substations775Jan-07Dec-09 Tabor Spencer 275kV line400kV line & substations463Jul-05Jun-07 Apollo RefurbishmentHVDC substation440Jul-05May-08 Shunt Caps (Beta, Hydra & Perseus)Substations99Jan-06Dec-07 Duvha Leseding 400kV Line400kV line & substations289Aug-06Nov-08 Platinum Basin400kV line & substations1300Jun-03Jun-06 Lowveld Transformation Capacity400kV line & substations150Jul-06Jul-08 Witkop 3rd TrfSubstation82Sep-04Mar-08 Tabor Spencer 275kV line275kV line & substations182Jun-06Oct-08 Medupi HV Yard Integration765kV & 400kV lines & substations2000Oct-06Dec-09 Zeus Hydra765kV line & substations3000Aug-06Jun-09 Hydra Omega765kV line & substations3300Aug-06Jun-09 Dedisa400kV line & substations427Jan-07Dec-09 GAS 1 HV YardSubstations335Oct-06Dec-08 JBH North UpgradeSubstations408Dec-06Dec-08 Total15509

10  50% from retained earnings  50% from debt of which  At least 25% from the domestic market  Long tenors (matches our assets), best value, no currency risk  Up to 25% from international markets  Various instruments - Export Credit Agency, Bonds, Private placements Funding strategy

11 Rating Status Moody’sS&PFitch Foreign Currency Local Currency Domestic Long-term Domestic Short-term Outlook A2 A1 - - Stable BBB+ A- AA+ A1 - A AAA A1+ Eskom’s credit rating

12 Investment Grade Investors require (per Rating Agencies): 1.Predictable regulatory framework with tariffs for efficient cost recovery 2.Asset security for loans: 3.Control over cash flows from an effective customer base 4.Confidence in the sustainability of critical capabilities: Methods to protect all national capabilities – capital build, electrification, demand side management 5.Continuity of successful management: Assurance of business continuity through competence & planned succession

13 Demand-side management  Targets:  MW by 2025  Investment of R10 billion planned by 2012, 3000MW  Focus areas  Installation of an energy saving culture  Adoption of energy efficient technologies e.g.. lighting  Tariff reform, particularly for households  Dynamic market pricing for industrial customers (DMP)  Use of renewable energy with households – Solar Water Heating  Approach to be followed  Aggressive roll-out planned nationally, with emphasis on areas with network constraints  Partnership between government, local authorities and Eskom

14 Our competitive advantage will continue into the future Source NUS April 2006 Restricted and Confidential South Africa 30% cheaper than Australia

15 Mining cost: Unpredictable cost inflation… Most recent data from Stats SA  SA mining costs have increased by 25,7% since Oct  SA coal costs (for SA consumption) have increased by 18,2% since Oct Stats SA’s coal cost index was increasing at only 3,3% (year on year) at the time Eskom lodged its revenue application to the NER in * Includes coal, metal ores, and other minerals 25.7% 18.2%

16 Price of Electricity in real c/kWh new Restricted and Confidential

17 Real price increases are not uncommon - Benchmarking Some recent price increases seen globally Brazil – The Brazilian regulator Aneel has allowed a increase of domestic tariffs by 13%, and industrial tariffs by 18% primarily due to rising fuel costs. Chile – The Chilean regulator INE has increased prices paid to generators by 11% in the central grid and 14% in the northern grid which will be passed through to customers. Ireland – the Irish regulator CER has allowed for an increase in ESB’s end use prices by almost 20% in the New Year primarily driven by high fuel costs. Portugal – The Portuguese regulator ERSE has provided an initial proposal to allow for a 15.7% increase to average tariff levels. China - East China's Shandong Province, Huaneng Power recently raised tariffs by 7.3 per cent to Yuan (US$47.03) per megawatt-hour (MWh), while in South China's Guangdong Province, the company raised prices by 6.2 per cent to Yuan (US$61.37) per MWh. Austria – The Austrian regulator E-Control has allowed price increases of about 5%, driven by an increase in the energy component of some 10%. Ontario – where since cost reflective prices have been established starting in 2003, tariffs have increased by roughly 100%. Restricted and Confidential

18 Key Strategic Issues Affordability Industry viability Internationally competitive prices

19 Conclusion  Achievement of the capacity expansion programme objectives is non negotiable  Eskom plan cater for higher economic growth  Eskom always ensure a long term view of the industry  Maintain our position of being the world’s lowest cost producer  South Africa to remain an attractive investment destination for energy intensive industry

Restricted and Confidential 20 Thank You