Rebecca S. Allen THE PALESTRA BUILDING Optimizing Energy Efficiency of the Palestra Building London, England.

Slides:



Advertisements
Similar presentations
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Advertisements

Make the most of your energy Head Office – Case Study.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Chilled Beam Presentation
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
North Pocono High School
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
SENIOR THESIS PRESENTATION
Energy Efficient System Design: Geothermal System Coupled with Chilled Beams and DOAS Montgomery College New Science Center.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Senior Thesis 2013 Ji Won Park Mechanical Option Advisor: Dr. Stephen Treado.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Britt Kern Mechanical Option Advisor: Dr. Treado Hunter’s Point South School Queens, New York.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Outreach Innovation Building Kyle Pepperman The Pennsylvania State University Architectural Engineering Senior Thesis Spring 2005.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
J. david maino the pennsylvania state university architectural engineering lighting/electrical.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Thermal Energy Storage
Eastern Pennsylvania Laboratory Facility
Munters DOAS, Chilled Beams and VRV
Lecture Objectives: Answer questions related to HW 4
Biobehavioral Health Building, University Park, PA
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Feasibility of Ice Storage
Senior Thesis Presentation
Lehigh Valley Heritage Center
Virtua Replacement Hospital -Voorhees NJ
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Presentation transcript:

Rebecca S. Allen THE PALESTRA BUILDING Optimizing Energy Efficiency of the Palestra Building London, England

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Building Background  Occupancy: Multi-Tenant Office Space  Location: London, England  Size: 37,098 m 2 (399,319 ft 2 )  Cost: £68 million  Procurement Type: Design & Build  Projected Completion: July 2006

Rebecca S. Allen THE PALESTRA BUILDING Building Background Palestra Buckingham Palace Westminster Abbey, Big Ben Globe Theatre Tate Modern Trafalgar Square, National Gallery

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING  Owner: Blackfriars Investments and Royal London Asset Management  Architect: Will Alsop, Alsop Architects  MEP Engineers: Buro Happold Ltd.  General Contractor: Skanska UK  Structural Engineers: Buro Happold Ltd. Project Team THE PALESTRA BUILDING Andrew Lacey, Structural Engineer *Former Leeds Exchange Student

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Existing Conditions Architectural Concept  Floating Boxes  ‘Dancing’ Columns  Tilted Facade

Rebecca S. Allen THE PALESTRA BUILDING Lighting/Electrical  4MVA substation in basement  Lighting Density: 15 W/m 2  4 – 800 amp, 500kVA busbars service tenant area  Recessed modular flourescent fixtures, fitted with controls for brightness management Structural  Steel construction  Dancing columns  9 m cantilever  10m x 7.5m structural bays Existing Conditions

Rebecca S. Allen THE PALESTRA BUILDING Mechanical  (7) 537 kW Air-cooled Screw Chillers  Chilled Water Supply 7ºC  (4) 800 kW Natural Gas-fired Boilers  (7) Constant Air Volume Units coupled with terminal Fan Coil Units Existing Conditions

Rebecca S. Allen THE PALESTRA BUILDING Existing Conditions Space Design Conditions Outdoor Air Temperature: WINTER, 4ºC SUMMER, 29ºC DBT 20ºC WBT Internal Air Temperature: 22ºC ± 2ºC, Office Space 18ºC min, Toilets and Stairs Air Movement: WINTER, 0.15 m/s (30 fpm) SUMMER, 0.25 m/s (50 fpm) Relative Humidity: 35-65%, output from FCUs

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Proposal Replace existing Electric Chiller Plant with Gas Engine Driven Chiller Plant Justification for Proposal  Natural Gas prices  Opportunities for lower building emissions/heat recovery  No base-loaded turbine Chiller Plant Optimization Rebecca S. Allen Utility Rates - London, England Electric Day4.592 p/kWh Night2.658 p/kWh Supply Point Charge55.88 £/month Availability Charge106 p/kVA Gas per unit1.515 p/kWh Water per unit88.85 p/m^3 Fixed cost for connection860 £/year 3 pence difference per kWh at peak

Rebecca S. Allen THE PALESTRA BUILDING IC Engine Selection  (5) 200 ton Tecogen Water-Cooled Gas Engine Driven Chillers Chiller Plant Optimization Rebecca S. Allen Electric versus IC Engine Chiller Costs Type Electric Air- Cooled Screw Water-Cooled Engine Driven Cost Per Unit£51,320.00£103, No. Units75 Total Cost£359,240.00£518, % INCREASE IN FIRST COSTS

Rebecca S. Allen THE PALESTRA BUILDING Chiller Plant Optimization Trace™ Energy Consumption Data Original Electric SchemeProposed Engine Scheme Monthly Energy ConsumptionEnergy, kWhCost, £Energy, kWhCost, £ Electric20,394,152 kWh£937, ,803,427 kWh£589, Gas8,288,669 kWh£14, ,182,627 kWh£14, Water-- 4,285 kL£11, Total Monthly Utility Cost £952, £615, First Costs£359,240.00£518, Total Yearly Consumption69,913,486 kWh 47,027,416 kWh Life Cycle Cost £17,704, £16,163, % LCC savings; £337,427 Monthly Savings

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Proposal Replace existing CAV system with FCUs with Dedicated Outdoor Air System (DOAS) with Suspended Chilled Beams Justification for Proposal  Better humidity control  Lowered first costs  Smaller Duct sizes, reduced costs DOAS Design  Run as a “neutral” system where air is supplied at same temperature as typical VAV system  Total and Sensible Heat Recovery  Additional Sensible Load met by Chill Beams Ventilation Optimization Rebecca S. Allen

THE PALESTRA BUILDING AHU Resizing Original SchemeProposed DOAS Scheme% Difference AHU L/s L/s-59.78% AHU L/s L/s-58.57% AHU L/s237.6 L/s-89.81% AHU L/s280.8 L/s-91.24% AHU L/s923.5 L/s-9.99% First Cost Savings ExistingProposedSavings AHUs£214,262.00£114, % Chilled Beams--£495, FCUs£612, % Ventilation Optimization Chilled Beam Selection Building’s Total Sensible Load: Q total = 1,422,700 W Sensible Load Met by DOAS: Q DOAS = 549,619 W No. Beams per Floor = 72 Total Beams Needed: 718 Halton CLL2/780/4100 Passive Beam

Rebecca S. Allen THE PALESTRA BUILDING Ventilation Optimization Table 5.8 Trace™ Energy Consumption Data Original Ventilation SchemeProposed DOAS Scheme Monthly Energy ConsumptionEnergy, kWhCost, £Energy, kWhCost, £ Electric20,394,152 kWh£937, ,608,401 kWh£626, Gas8,288,669 kWh£14, ,242,134 kWh£2, Water-- Total Monthly Utility Cost £952, £628, Total Yearly Consumption69,913,486 kWh 42,136,788 kWh Life Cycle Cost £17,704, £15,878, % LCC savings; £324,032 Monthly Savings

Rebecca S. Allen THE PALESTRA BUILDING Building Optimization Trace™ Energy Consumption Data Original Scheme Proposed DOAS+Engine Chiller Scheme Monthly Energy ConsumptionEnergy, kWhCost, £Energy, kWhCost, £ Electric20,394,152 kWh£937, ,669,017 kWh£583, Gas8,288,669 kWh£14, ,770,855 kWh£4, Water-- 19,061 kL£14, Total Monthly Utility Cost £952, £602, Total Yearly Consumption69,913,486 kWh 40,927,536 kWh Life Cycle Cost £17,704, £15, % LCC savings; £349,677 Monthly Savings

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Solar Energy Estimated Annual Energy Produced Specific Yield102.4 kWh/m^2 Overall PV System Efficiency10.20% Renewable Energy Delivered19,995 kWh Solar PV Cell Selection BP Solar 5160 S Max Output: 160 W Weight: 15 kg Area Allotted: 100m 2

Rebecca S. Allen THE PALESTRA BUILDING Solar Energy RETScreen Cost Summary Total Initial Cost £205, Total Annual Cost £ Total Annual Savings £31, Simple Payback9.1 years Years to Positive Cash Flow6 years Net Present Value (NPV)£125, Annual Life Cycle Cost Savings£12,805.00

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Wind Energy Rooftop Wind Turbine Specifications ManufacturerSWIFT™ Rated 12.5 m/s1.5 kW CO2 Displacement1.4 tonnes per year Turbine5 blade HAWT wind turbine Rotor Diameter2.12 m Weight95 kg 4.6 m/s 60 W 1500 W 12.5 m/s

Rebecca S. Allen THE PALESTRA BUILDING Wind Energy Wind Turbine Costs No. Units10 Clearance Per Unit2.12 m Area Required50 m^2 Total Weight950 kg Initial Investment£15,000 Total Power Output600 W Annual Savings120 kWh Payback Period = £15,000 = 2722 years £5.51

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING RECOMMENDATIONS  Chiller Optimization: Natural Gas Engine Driven Chiller Plant  Ventilation Optimization: Dedicated Outdoor Air System  Building Optimization: Integration of both proposed schemes  Solar Energy: Payback Period 9.1 years  Wind Energy: Payback Period 2722 years Conclusions

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Acknowledgements  Buro Happold Ltd.: Pirooz Kani  Skanska UK: Adrian Head, Stephen Fox  Blackfriars Investments  Penn State Schreyer Honors College  AE Faculty, especially Prof Ling  AE Class 2006  Friends and Family Pirooz Coworker

Rebecca S. Allen THE PALESTRA BUILDING Rebecca S. Allen THE PALESTRA BUILDING Building Background Project Team Existing Conditions Mechanical Redesign Chiller Plant Optimization Dedicated Outdoor Air System (DOAS) Solar Energy Feasibility Study Wind Energy Feasibility Study Conclusions Acknowledgements Questions

Rebecca S. Allen THE PALESTRA BUILDING Questions?