AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.

Slides:



Advertisements
Similar presentations
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
AnDY at IP2 Infrastructure Requirements & Experimental Construction 1Charles Folz, BNL.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
A N DY Trigger and DAQ System A N DY Review Chris Perkins UC Berkeley/Space Sciences Laboratory Stony Brook University 11/08/2011.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
 Improve lepton-photon-hadron separation in the FMS to do  Some examples  J/Ψ physics in pAu and pp at forward rapidities  current status from chris.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
BigBite Spectrometer Equipment by Douglas W. Higinbotham.
Berkeley Lab, May Bertrand H.J. Biritz1/16 Outline RHIC and STAR STAR Time of Flight (TOF) High and Low Voltage Power Supply Control Interface Daya.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
January 30, 2016 RHIC/USATLAS Computing Facility Overview Dantong Yu Brookhaven National Lab.
24th. February, 2003Supriya Das : Junior’s Day, STAR Collaboration Meeting, BNL1 The STAR Photon Multiplicity Detector Supriya Das, VECC Kolkata For The.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
PIXEL CAEN Installation Status
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS WG report 9/09/11 FV.
T1 Electronic status Conclusions Electronics Cards:
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
PMT cabling Gian Luca Raselli INFN Pavia
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
DCS WG report 9/09/11 FV.
LLRF and Beam-based Longitudinal Feedback Readiness
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
during Fall GMp run (high current)
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Possible parasitic measurement during Fall GMp run
RPC Electronics Overall system diagram Current status At detector
Experiment DAQ and trigger GMn SBS Collaboration Meeting
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

AnDY Hardware

Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2

Hcal Phase-2 (Run 12) Description: 20 additional Pb-fiber modules inserted between left and right Hcal enclosures from run 11 (phase-1) - Modules exist need to be tested - Sufficient low voltage channels for CW bases on additional modules exist in phase- 1 setup - Sufficient ADC channels for additional modules exist in current QT boards - 24 additional RG-58 and 3 positronix spiders need to be purchased -Support/lifting structures - optional upgrade of low voltage system to computer control - Insert and mounts for central enclosures to be fabbed

Detector set: – ZDCs, BBC-Y, Ecal phase-1, MidY, PreShower phase 2, Ecal phase-2, Hcal phase-3

Mid-Y detector 80 channel scintilation counter - Scintillation plastic reused from run- 11 preshower -40 additional PMTs and bases from E896 cache - 10 TACs -5 additional QT boards to be fabbed - 40 additional RG58 & RG59 cables - 20 additional positronics spiders -- mounting stands need to be fabbed

PreShower Run 13 3 planes w/ 76 detectors each - scintillator to be purchased - pmts and bases from Yale 400 on hand – need testing - # TAC boards to be fabbed - #QT boards (3*76/32<8 to be fabbed (double for TACs) - cables and patch panels LV, 228 signal, 30 positronix to buy - 1 VME crate (negotiating w/ star) - MVME 2306 already obtained - stands need to be fabbed

Ecal run channels -Glass at RHIC supplied by Jlab Need transmission tests - 50 QT boards – to be fabbed - 4 VME (9u) crates (negotiating w/ STAR? - 4 MVME 2306 processors -Pmts supplied by Jlab need to test -CW bases – to be fabbed prototype to BNL next week from Mike Ng - LV cables -Cables – need 200 positronix BNC need patch panels - Stands and rail system to be fabbed

Hcal Phase-3 (Run 13) 80 additional Pb-fiber modules - in negotiations with phenix -- 4 additional QT boards to be fabbed -- 2 VME (9u) crates (negotiate with STAR - 2 MVME 2306 processors - Low Voltage boards -Cabling - Low voltage - 80 RG-58 Cables - 10 positronics spiders -2 additional racks - obtained from SVT lab

Electronics for Run additional DSMs (must be repaired from broken stock) -Miscellaneous cables -1 VME crate for additional Ecal DSMs (negotiate with STAR) -1 MVME Network? RS232 port server?