Status of the EURISOL Design Study and Plans for FP7 Peter Butler University of Liverpool.

Slides:



Advertisements
Similar presentations
Paul Scherrer Institut 5232 Villigen PSI EURISOL Kick-off meeting, L. Zanini EURISOL DS Task 4 L. Zanini PSI Kick-off Meeting CERN,
Advertisements

Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
EURISOL Peter Butler University of Liverpool
1 NuPECC/ERA-NET, Paris; 27 May 2005 NuPECC LRP & Nuclear Physics ERA-NET Muhsin N. Harakeh NuPECC & KVI.
NuPECC June 2007 The ISOLDE research programme Peter Butler (University of Liverpool) 1.The present 2.The future.
NuPECC Brussels 2009 The Cyclotron Research Centre of Louvain-la-Neuve: Present status Marc Loiselet UCL, Centre de Recherches du Cyclotron Louvain-la-Neuve.
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams HIGH INTENSITY STABLE BEAMS -Available beams at GANIL.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study OUTCOME FROM THE PROJECT ACTIVITY in the period 20 March- 8.
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
NuPECC: Towards a New Long Range Plan for Nuclear Physics in Europe Guenther RosnerEuNPC Bochum 18/3/20091.
08/06/2009: HIAT09 Mattia Manzolaro, SPES Target Group 1/30 The SPES Project: research and development for the multi-foil direct target M. Manzolaro 1,3,
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
EURISOL User Group Charter –Objectives of the User Group –Organization Next actions in the light of the future of EURISOL.
EURISOL Transition period MYRRHA and
EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Challenges for EURISOL and the EURISOL Design Study Yorick Blumenfeld.
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
Town meeting – Helsinki – 17 th September 2007 Overview on EURISOL targets Thierry Stora on behalf of the Target Tasks.
2 nd Oxford-Princeton High-Powered Target Workshop, Y. KadiNovember 6, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of the.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
The Youngsters in Theoretical Nuclear Physics An Ace up France’s sleeve in the RIB competition.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay.
Radioactive ion beam production at other facilities
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
NA-13 : EURISOL-NET Yorick Blumenfeld On behalf of the EURISOL DS management board.
Coseners meeting Sept Future of European ISOL Peter Butler.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
Paul Scherrer Institut 5232 Villigen PSI EURISOL Town Meeting Pisa, March 30-April 2, 2009 / W. Wagner PAUL SCHERRER INSTITUT EURISOL Spallation Neutron.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Eurisol Week 2005.
Calculations of Beam Intensities Task 11 : Calculations of Beam Intensities - first twelve months -
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
Summary of IAP comments from 2007 EURISOL Town Meeting
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Study on IFMIF Beam-Target Interface
The Future of EURISOL Results from the Design Study
for the EURISOL Steering Committee
b-beams: R&D Challenges in FP7
Status of the beta-beam study
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Outline: Why now ? What ? How ?
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
BEAM INTENSITIES WITH EURISOL
Superbeams with SPL at CERN
EffiCAS Efficient Facility for Ions at CAS
European Spallation Neutron Source ESNS
Presentation transcript:

Status of the EURISOL Design Study and Plans for FP7 Peter Butler University of Liverpool

TABLE 1). Participants in EURISOL Design Study ParticipantCountryParticipantCountry GANIL (coordinator) FranceInst. Physics VilniusLithuania CNRS/IN2P3FranceWarsaw UniversityPoland INFNItalyInst. Phys. BratislavaSlovakia CERNEuropeU. LiverpoolUnited Kingdom U. C. LouvainBelgiumGSI DarmstadtGermany CEAFranceU. SantiagoSpain NIPNERomaniaCCLRC DaresburyUnited Kingdom U. JyväskyläFinlandPaul Scherrer InstituteSwitzerland L.M.U. München GermanyInst. Phys. LatviaLatvia FZ JülichGermanyStockholm. U. MSLSweden 20 Participants

Topical areas and tasks of the EURISOL Design Study Topical AreaTasksLead Institution Management GANIL AcceleratorsDriver accelerator Post Accelerator Superconducting cavity prototyping INFN GANIL IN2P3 TargetsLiquid Hg Converter Direct targets High power fission target CERN INFN Physics, beams and safetySafety and radioprotection Beam Preparation Beam Intensities Physics and Instrumentation CEA U. Jyväskylä GSI U. Liverpool Beta BeamsBeta Beam Conceptual Design StudyCERN 12 Tasks

The EURISOL Road Map Vigorous scientific exploitation of current ISOL facilities : EXCYT, Louvain-la-Neuve, REX- ISOLDE, SPIRAL Construction of intermediate generation facilities: SPIRAL2, HIE-ISOLDE Design and prototyping of the most specific and challenging parts of EURISOL in the framework of the Design Study EURISOL-DS.

Ion sources 1 GeV/q H-, H+, 3 He++ >200 MeV/q D+, A/q=2 Charge breeder Low- resolution mass-selector UC x target 1+ ion source n-generator MeV/u (for 132 Sn) To low-energy areas Secondary fragmentation target 4-MW target station High-resolution mass-selector Bunching RFQ To medium-energy experimental areas H- H+, D+, 3 He MeV/u2-20 MeV/u To high-energy experimental areas RFQs Charge selector 100-kW direct target station Schematic Layout for EURISOL facility

The Main Challenges Design a 5MW; 1GeV proton driver with additional capability of 200 AMeV deuterons and A/Q=2 Heavy Ions; build and test prototypes of the cavities. Design a liquid Hg converter which will accept 5 MW of beam power. Design a UCx target which will make the most efficient use of the neutrons produced. Evaluate the safety constraints of the above set up. Design an efficient multi-user beam distribution system. Design a superconducting HI LINAC capable of accelerating 132 Sn up to 150 AMeV Investigate technologies for the instrumentation of the future Provide a conceptual study for a beta-beam neutrino facility.

Recent Management Accomplishments Submission of Second Annual Report on March 15. Only minor comments from EU. Successful Mid-Term Review on April 24 with Project Officer Christian Kurrer Spin off of the EURISOL user group; chaired by Angela Bonnacorso Organization of joint EURISOL-EURONS town meeting in Helsinki; Sept Start of Site Study chaired by Alan Shotter

DateTimeEvent Mon 17 All DayEURISOL-EURONS Town Meeting Talks Tue 18All DayEURISOL-EURONS Town Meeting Talks Early evening Poster Session & Aperitifs EveningTown Meeting Dinner Wed 19 MorningNews from NuPECC Future Activities in Nuclear Structure Physics in Europe AfternoonFuture Activities in Nuclear Structure Physics in Europe Thu 20MorningEURONS PCC MeetingEURISOL IAP MeetingEURISOL Task Meetings AfternoonEURISOL Coordination Board Meeting Fri 21MorningEURISOL Management Board Meeting EURISOL-EURONS town meeting, Helsinki, Sept

Reference MMW Target Station Hg converter and secondary fission targets Hg loop with window 8 UCX targets 40x6x3 cm Problems : Diffusion-Effusion Time Ion Sources Beam Hg flow UC fission target Ion source containment BeO reflector window CERN - INFN

Baseline Neutron converter Optimized ANSYS CFD analyses of optimized liquid mercury neutron converter of SNS (neutron spallation source) type The top view shows the converter with mercury flow guides to improve window cooling and avoid backflow in the converter The middle view shows the temperature distribution in the window which is well below thresholds for irradiated material The bottom view shows the temperature distribution of the circulating mercury which is well below the boiling point of mercury CERN

Windowless « curtain » converter IPUL – CERN - PSI Beam Hg Lamina flow of Hg

MAFF type solution for UC targets Cyril Kharoua, Yacine Kadi and task 2 Fission Target Tube Hg Proton to Neutron converter Hg inlet Hg outlet CERN - MUNICH

Driver: New baseline scheme with extended capabilities 2 injection lines for H,D, He and A/q=2 ions magnetic stripping at 1 GeV of up to 100 kW of the H - beam to H 0 (spilled beam intensity controlled by adjusting B) beam splitting by bending of H - with a magnetic dipole stripping of H 0 to H + by means of a stripper foil H - to MMW target and H + to 100kW targets H-,D- H+,D+, 3 He ++ RFQ 176 MHz HWR 176 MHz 3-SPOKE 352 MHz Elliptical 704 MHz 4 MW H- 100 kW H+, 3 He MeV/u 60 MeV/q 140 MeV/q 1 GeV/q B stripper foil stripper >200 MeV/q D, A/q=2 =0.047 =0.03 =0.09 =0.15 =0.65 = INFN

EURISOL Physics

EURISOL in FP7 Baseline Plan: Lobby for EURISOL to be on ESFRI list in 2009 and apply for preparatory construction phase at next call in Question: Is this approach still valid when taking into account the delays in the construction of SPIRAL2 ? We envisage proposing a continuation of the DS supported by the funding agencies in the framework of NUPNET In order to continue developing the EURISOL concept: LOIs for EURISOL-NET and JRA on ISOL targets in FP7 I3.

EURISOL-NET 24 Participants including all the main DS participants to allow the European laboratories that can conceivably host EURISOL to network with each other, with the funding agencies via NUPNET, and with the user community; to encourage the exchange of know-how on technical & scientific developments in European ISOL facilities (Louvain-la-Neuve, REX-HIE-ISOLDE, SPIRAL- SPIRAL2 and EXCYT); to support the EURISOL User Group and to continuously develop the scientific case for EURISOL.

FINIS

OLD: Temperature distribution in MMW target Acceptable power densities in the Hg. Flow pattern not optimised; maximum temperature ~260 ºC. Acceptable maximum temperature in the beam window (~350 ºC). Large temperature gradient in the window, inducing mechanical stresses above the acceptance limits. Power density (W/cm 3 /MW of beam) PROBLEMS NOW SOLVED

New 1 GeV/q beam splitters magnetic stripping at 1 GeV of up to 100 kW of the H - beam to H 0 The main H- beam transport is not perturbed by the symmetric wiggler beam splitting by bending of H - with a magnetic dipole stripping of H 0 to H + by means of a stripper foil H - to target 1 and H + to target 2(3,4). The spilled beam intensity can be controlled by adjusting the field strength of the magnetic stripper.

= 0.03 = 0.78 Ion sources RFQ 176 MHz HWRs 176MHz Elliptical ISCL 704 MHz 1 GeV/q H-, H+, 3 He MeV/u 100 keV 60 MeV/q140 MeV/q >200 MeV/q D+, A/q=2 Charge breeder Low-resolution mass-selector UC x target 1+ ion source n-generator = = 0.14 = 0.27 = QWR ISCL 88 MHz 3 QWRs ISCL 88 MHz 8 HWRs ISCL 176 MHz Spoke ISCL 264 MHz MeV/u (for 132 Sn) To low-energy areas Secondary fragmentatio n target Schematic Layout for EURISOL facility One of several target stations = spoke ISCL 325 MHz High- resolution mass-selector Bunching RFQ To medium-energy experimental areas = 0.65 Elliptical ISCL 704 MHz = 0.09, = 0.15 H- H+, D+, 3 He MeV/u MeV/u To high-energy experimental areas RFQs Charge selector