FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.

Slides:



Advertisements
Similar presentations
Mass and Half-Life Measurements of Stored Exotic Nuclei
Advertisements

Heavy Ion Cancer Therapy
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
Site report GSI Darmstadt FAIR project Overview IT at GSI
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration Tom Davinson.
Research Contracts 11 October 2007 University of Strathclyde Kathleen Boyle.
Murray River Project Update Coal Forum October 2013.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
1 June 13, 2013YMPO RTP Technical Advisory Committee Meeting.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
FAIR – the Universe in the labororatory
and collaboration with France
Presentation transcript:

FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006

FAIR Baseline Technical Report 2006 Volume 1:Executive Summary Volume 2:Technical Report Accelerators and Scientific Infrastructure~ 700 pages Volume 3:Technical Experiment Proposals on QCD Physics Volume 3A: CBM ~ 450 pages Volume 3B: PANDA, PAX, ASSIA ~ 600 pages Volume 4:Technical Experiment Proposals on Nuclear Structure and Astrophysics (NUSTAR)~ 700 pages Volume 5:Technical Experiment Proposals on Atomic Physics, Plasma Physics and Applied Physics (APPA)~ 500 pages Volume 6:Technical Report Civil Constructions a. Supplies b. Electrical Systems c. Civil Engineering d. Radiation Safety Supplement 1: Cost, Schedule, Manpower Supplement 2: Costbook (5000 entries: 3500 WPs)

FAIR - Facility for Antiproton and Ion Research 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR GSI today Future facility ESR FLAIR Rare-Isotope Production Target Antiproton Production Target

FAIR - Facility for Antiproton and Ion Research Parallel Operations:

FAIR - Facility for Antiproton and Ion Research

FAIR Baseline Cost Costbook TAC Cap (-10%) (M) (M) Accelerators Baseline Experiments Buildings & Supply Systems Total Investments Manpower (2400 MY) Total Project Construction Cost Cost increases (beyond inflation) since Conceptual Design Report (CDR-2001): Added Features: 12% True Cost Increases: 11% Spending profile: 2007 – 2017 (construction phase: 2007 – 2014)

FAIR Operation Cost Cost for: Accelerator staff (320 FTE per year) Direct cost for accelerators (6500 hrs/yr) Experimental equipment Maintenance of buildings IT Safety … … in the process of being worked out! ~ 120 M per year - approx. 10% uncertainty - full price tag from 2015 on - in 2005 prices

Site Lab.-Services Landlord Activ. POF-Research Res.-Infrastr. Scientific- Technical Infrastructure FAIR (Facility) Construction / Operation FAIR-GmbH Management (Long-term) Contractual Arrangements "Geschäftsbesorgungsvertrag" Strategic Planning Budget & Financing Controlling Scientific Program & Schedule International Employment FAIR Line Management Administrative Infrastructure GSI Line Management Laboratory Facility & Site Operations Engineering Design Site Preparation and ES&H Technical & Civil Construction Production Supervision Assembly & Commissioning GSI-mbH Management

Issues – Questions – Next Steps: Acceptance of Baseline Technical Report by ISC (by May 2006) in particular: cost – schedule – manpower BMBF: accepted with conditions (s. next point) Financing: guidelines from FCI working group BMBF: German federal project budget fixed other sources: 50 M from 25% scaling from partners GSI comitted to carry all manpower cost (re-directed effort) remainder? Government-level negotiations letters from German Minister (Schavan) to foreign ministries with requests to identify counter-partners for negotiations and to begin negotiations Finalize Baseline Technical Report (by June 2006) Finalize legal documents and organizational structure (2-company model) etc. (by Fall 2006)