NUSTAR 05 - 1 ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting.

Slides:



Advertisements
Similar presentations
29 May GNSO Improvements Top Level Plan 29 May 2009 Plan distributed 22 May by Avri.
Advertisements

EURONSTown Meeting Septrmber 2007, Helsinki Towards a new I3 proposal of the European nuclear structure community At the NuPECC meeting in Muenchen.
The High Intensity Stable Ion Beams Working Group HISIB-WG
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
GSC: Standardization Advancing Global Communications Towards a Common ITU/ISO/IEC Patent Policy by Masamichi Niiya Telecommunication Standardization Bureau.
Democracy at School (English version) ImPULS- Schule Schmiedefeld.
SuperDARN Workshop May 30 – June PI Report Mark Lester On behalf of the SuperDARN PIs.
Logistics: –My office hours: T, Th 4-5pm or by appointment –Class Web page:
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
1 Dissertation & Comprehensive Exam Process Dissertation Process Comprehensive Exam.
1 Dissertation Process 4 process overview 4 specifics –dates, policies, etc.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
Progress Report to the PSC Steering Committee INTOSAI PSC Subcommittee on Internal Control Standards SAI of Poland (NIK) June 2011, Wellington.
Carmen Angulo, N-02 CARINAEURONS PCC-Meeting, Groningen (NL), December 2006 Summary of N-02 CARINA activities April 2006 – December
Doc.: IEEE /0095r1 Submission Jan 2005 Gregg Rasor, FreescaleSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Workshop On European Small-Scale Accelerator Facilities Organized at Agios Nicolaos, Crete, Greece, September 7-8, 2007 Scientists from almost all European.
T 2.3 Follow up to Conferences Leonardo Piccinetti, EFB FORESTA Project Meeting Brasilia, 20 September 2011.
LIGO-G R LSC Presentations Policy: a proposal for procedures David Shoemaker and Peter Saulson LSC, Livingston 14 March 2001.
F. Azaiez (IPN-Orsay) The European Collaboration for Stable Ion Beams – ECOS Pushing the limits with high intensity stable beams A typical bottom up initiative.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
th session of JINR SC 1 JOINT INSTITUTE FOR NUCLEAR RESEARCH Recommendations of the JINR Directorate for the financing of projects and themes.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
PARIS21 Steering Committee26 April 2006 PARIS21 Steering Committee, Paris, 26 April 2006 PARIS21 Work Programme for 2006.
How to live a good and useful life Community Project.
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.
Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing.
IICWG VI Applied Science & Research Standing Committee Open Action Items for IICWG-7 Co-Chairs Lars-Anders & Breivik Dean Flett.
Report on “WG-CPI” “The role of the cadastral parcel in INSPIRE and in the NSDIs” Julius Ernst Joint C&LR EG – PCC Meeting Vienna, June 7 th – 9 th 2006.
Workshop on How to Publish Data in VO ESAC, June 25-June Tips & tricks by the Ivoa Document Coordinator Bruno Rino
List of Decisions #Decision for the Board 1 Does the Board agree to its composition? The Board requested that its composition be considered “proposed”
SENIOR COLLEGE APPLICATION PROCESS BERNARDS HIGH SCHOOL Guidance Department September 24, 2015.
Project 1 (CGNB 413) Briefing
Project Design How to construct a Gantt diagram. What is a Gantt Diagram/Chart? A bar chart that … Shows a schedule of activities – Start and end dates.
The RIA Users Organization (RIAUO) Witold Nazarewicz (Tennessee) EURISOL Week, CERN, November 2006 History The Mission Organization Activities Perspectives.
Introduction This afternoon session is mainly targeting the extracting PDF information from LHC measurements (present and future) This is a follow-up of.
ECES-490 Course Policy Stewart D. Personick (SDP) S490_TN/
ROTARY GLOBAL/DUNN SCHOLARSHIP IMPLEMENTATION SCHEDULE AND PROCEDURE FOR D Using the flyer E. & W. Hartford clubs advertise/spread the word in their.
Doc.: IEEE /054r0 Submission January 2003 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
First Grade Sight Words. the of and a an to.
1 F. Azaiez Pushing the limits with high intensity stable beams Story started in 2000!....
How did we measure sustainability at Thomson House/PGSS? There are two facets to the project: – A building audit (completed by an architecture and engineering.
WELCOME TO MICRO ECONOMICS AB 224 Discussion of Syllabus and Expectations in the Class.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
INTRODUCTION TO COLLEGE WRITING Writing Workshop September 24 & 25, 2015.
European Small-Scale Accelerator Facilities S. Harissopulos: NuPECC Strategy Meeting, Darmstadt, January 16, 2016.
Itzhak Tserruya Weizmann Institute of Science
Transcript request
The RIA Users Organization (RIAUO)
ILD phone meeting September 5, 2017 K. Kawagoe (PSB chair)
for the EURISOL Steering Committee
HOW DOES A BILL BECOME A LAW?
CARTES II Atlas du Sahara -Sahel
Chemical Monitoring mandate
Eurostat regional yearbook 2012 – new routines and time planning
What is Congress? PSA’s National Delegates’ Congress is made up of delegates representing all PSA members – it’s the highest decision making body in.
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
Minimum Income Campaign
IEEE IMT-Advanced Review Process
HOW DOES A BILL BECOME A LAW?
Presentation transcript:

NUSTAR ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting -The future of ECOS

NUSTAR The ECOS document -The ECOS draft document was shortened from 64 pages to 44 pages. It was agreed that 40 pages is an acceptable size for the final document. -Each of the ECOS members have worked on the document for corrections and suggestions and sent back his/her version to me. Document includes in addition: The KVI contribution The g.s properties of neutron deficient nuclei Nuclear Astrophysics: G. de Angelis at the CARINA workshop meeting, on the second week of June! My suggestion…. It was agreed that once the document is finalised and accepted by NuPECC, it would be put on the NuPECC-ECOS web pages to be accessible to the whole community well before the ECOS town meeting.

NUSTAR The ECOS town meeting This town meeting is meant to inform our community about the work that has been done in the group and to discuss our recommendations to NuPECC. The suggested date and location for the meeting is the second week of January 2006 in Paris. The organisation of the town meeting should be proposed soon to an advisory committee. Regarding the town meeting, the topics to be discussed are as follows: General talks on each of the physics cases that are in our document Talks on the facilities and their up-grading to higher intensities Talks on the scientific policy of the facilities (present and future research directions) Talks on the subjects identified in our document as being of major importance for R&D (targets, spectrometers, electronics, DAQ and ion sources) Discussion on the future (the ECOS recommendations) The organisation of the town meeting will be the main item of our next meeting, which will be on the 28 of September in Paris!

NUSTAR The future of ECOS: The idea that ECOS should continue its activity beyond the completion of the document and the town meeting has received general acceptance. Concerning future tasks and goals of ECOS, the following ideas have been discussed: - Coordination of R&D activities on separators, targets, detectors and electronics+DAQ that are needed for the future high intensity beams. - Coordination of the Stable Ion Beam Facility Network (from the point of view of the research activities). This part should be discussed deeper in the following ECOS meeting!