EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.

Slides:



Advertisements
Similar presentations
Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
Advertisements

EURISOL Peter Butler University of Liverpool
Status of the EURISOL Design Study and Plans for FP7 Peter Butler University of Liverpool.
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
Strategy for SCRF in next decade 2007 Develop SCRF Centre of Excellence at TRIUMF industrial (PAVAC) and scientific collaborators (ILC, TTC) ILC, 1.3 GHz.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Cyclotron Refurbishing & Development Meeting March 6, 2008.
EURISOL User Group Charter –Objectives of the User Group –Organization Next actions in the light of the future of EURISOL.
EURISOL Transition period MYRRHA and
EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.
A. FaccoJoint EURISOL-EURONS Town Meeting Helsinki, Overview of accelerators for EURISOL Alberto Facco (INFN-LNL) on behalf of the EURISOL DS.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
F Project X Overview Dave McGinnis October 12, 2007.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
TIARA-PP WP 9 « TIHPAC » Test Infrastructure for High Power Accelerator Components Sébastien Bousson (CNRS-IN2P3-IPN Orsay) TIARA PP TIARA Steering Committee.
3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
Summary of IAP comments from 2007 EURISOL Town Meeting
Study on IFMIF Beam-Target Interface
The Future of EURISOL Results from the Design Study
for the EURISOL Steering Committee
Hosting Orsay Walid KAABI
Acceleration of RIB using linacs
Status of the beta-beam study
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Superbeams with SPL at CERN
ADS Accelerator Program in China
DESIGN OF THE HWR CAVITIES FOR SARAF
A High Intensity Neutrino Oscillation Facility in Europe
Charge and Agenda of the 18th TAC meeting
Presentation transcript:

EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure Action - Structuring the European Research Area EURISOL DS Project Contract no RIDS. The EC is not liable for any use that can be made of the information contained herein.

EURISOL DS Major Technical Achievements Managerial achievements Proposals for the Future

The Main Challenges Design a 5MW; 1GeV proton driver with additional capability of 200 AMeV deuterons and A/Q=2 Heavy Ions (Task7) ; build and test prototypes of the cavities (task 8). Design a liquid Hg converter which will accept 5 MW of beam power (task 2). Design a UCx target which will make the most efficient use of the neutrons produced (task 4). Evaluate the safety constraints of the above set up (task 5). Design an efficient multi-user beam distribution system (task 9). Design a superconducting HI LINAC capable of accelerating 132 Sn up to 150 AMeV (task 6) Investigate technologies for the instrumentation of the future (task 10) Provide a conceptual study for a beta-beam neutrino facility (task 12).

New baseline scheme with extended capabilities 2 injection lines for H,D, He and A/q=2 ions SARAF scheme up to 60 MeV/q IPNO scheme from 60 to 140 MeV/q CEA scheme from 140 to 1000 MeV/u cw beam splitting at 1 GeV (1 line 4 MW + 3 lines 100 kW) Total length of the linac: ~240 m H-,D- H+,D+, 3 He ++ RFQ 176 MHz HWR 176 MHz 3-SPOKE 352 MHz Elliptical 704 MHz 4 MW H- 100 kW H+, 3 He MeV/u 60 MeV/q 140 MeV/q 1 GeV/q B stripper foil stripper >200 MeV/q D, A/q=2 =0.047 =0.03 =0.09 =0.15 =0.65 =

1 GeV Multiple Extraction 3 splitting stations 4 simultaneous users for cw proton beams: 1 4 MW kW (continuously adjustable) Unique ability of EURISOL at present EURISOL parallel cw Proton extraction

SPIRAL-2 philosophy : Smoothest beam dynamics (regular FDO lattice, low number of -sections), Modular solution and simple cryostats, Separated vacuum (safety with FP), Warm focusing (easier for alignement), Possibility to insert diagnostics at each period, ease of tuning Main technical requirements: Only 2-gap cavities (high q/A acceptance) Max. accelerating fields 7.8 MV/m Nominal operation for A/Q between 4 and 8 Design of the post-accelerator

New Target Concept

Reactor Type Target Concept Validated by International Advisory Board

Double effusion line prototype (E. Bouquerel, L. Penescu ) Heat screen Bellows ISOLDE cold FEBIAD MK7 Ion source Cu body 2 pneumatic valves RIB 1.4GeV protons 2xwater cooled transfer lines 2x20cm containers

Underground target position Front-end retracts vertically Hot-cell for target exchange Separator in 3 rd level Neighboring hot-cell accessible during run Effective dose rate E (Sv/h) Soil activation! Effective dose rate maps Conceptual design of 100kW target station

Fragmentation of 132 Sn (Preliminary results) Fragmentation of 132 Sn on Be D. Perez and D. Dragosavac

Management Achievements Organization of mid-term review (April 2007) Organization of 3 rd Town meeting in association with EURONS Link with EC concerning financial aspects of annual report and extension of the contract to 31/07/2009 Start up of EURISOL User Group: Angela Bonaccorso, chair. First workshop Jan. 2008; Charter established; election of executive committee (UEC) in progress Start-up of Site Investigation Panel : A. Shotter, G. Cuttone, D. Geesaman, A. Mueller, S. Myers. First Meeting Jan Mandate Written Production of brochure for General Public Defining strategy for the future of EURISOL

Financial Situation Second Pre-Financing has been received and distributed. Third expected next year (no auditing for 3 rd year). Extension will allow the timely use of all resources Spending in-line with expectations (95%) Slight overspending in Personnel compensated by under spending in T&S and Consumables

Proposal for the Future of EURISOL EURISOL has made use of EC instruments: 5th framework RTD and 6th framework DS. Major advances have been achieved and a large community with varied technical expertise has developed and must continue to be nurtured Full engineering report necessary before Pre- construction phase: No (evident) EC instrument for funding. We (the EURISOL DS MB) propose to form a EURISOL collaboration consisting of laboratories interested in participating in the continuing effort.

Role of the EURISOL Collaboration Follow the scientific and policy recommendations of NuPECC Promote and Coordinate the R&D to further EURISOL Solicit support of the funding agencies, in particular through the NuPNET Eranet, and explore other funding opportunities (EC, intercontinental…) Interact with the EC >> entry on the ESFRI list. Goal : Produce a full engineering report for the facility

Organization of the EURISOL Collaboration Collaboration board representing participants >> Elects collaboration chairperson and appoints project leader. Project office supported by collaboration fee. Engineering work coordinated by project leader and funded by funding agencies (+ other), preferably coordinated by NuPNET. Work divided into work packages

EURISOL Work Packages (3-5 years) Management (Project Office) RIB production: Specific prototyping and tests –Neutron converter in beam –Fission target in n flux –New target materials; liquid metal direct target –Novel beam splitter system… Prototyping at intermediate facilities; linked to EUR- ISOL Net in ENSAR Documentation and licensing Infrastructure Updating the science case : coordinated by EURISOL User group

Requests Very approximate price tag: 2M/year for 4 years. We would like the support of NuPECC to implement this plan (and welcome your suggestions). Collaboration launched by the EURISOL Steering Committee in Nov Startup should be in fall 2009