Future of OASIS II Conference Presented by Karl Tammar – NYISO For the ISO/RTO Council March 29, 2005 ISO/RTO Activities and Initiatives.

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
March 29, OASIS: After 10 years, Where are We Going? Don Watkins - BPA
©2005 PJM 1 Development of Wholesale Electricity Scheduling and OASIS Determining the Future Needs of the Open Access Same-time Information System Andy.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
FERCs OASIS II ANOPR Marvin Rosenberg Economist Division of Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal Energy Regulatory.
NAESB Coordinate Interchange
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
Future Of OASIS Conference March 29, 2005 Future of OASIS Conference Related Industry Initiatives NAESB - Robert Harshbarger OASIS IA Task Force and ESS.
NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Class 5 suggestions. Transmission Planning Class 5 supports implementation of a systematic, transparent process for developing and updating bus-level.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
PacifiCorp-CAISO EIM Initiative Overview
EPRI CIM for Market Extensions (CME) and CIM-Based Messaging to Support Markets and Reliability July 14, 2004 Terry Saxton Xtensible Solutions.
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Conference on the Status of OASIS II MARCH 29 TH, 2005 FERC Offices Washington, DC John Simonelli ISO New England Inc Manager, Tariffs, Schedules & OASIS.
©2003 PJM FERC Technical Conference July 14, 2004 MISO-PJM-TVA Alain Steven Vice President and CTO PJM Interconnection.
Presentation to WECC Market Interface Committee March 24, 2015
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
The Continuing Evolution of U.S. Electricity Markets
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
 Power Costs, Inc All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced without permission.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
Bulk Power Transmission System
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Facilitated Transaction Checkout Improving Operational Efficiency.
Successful Restructuring: The Way Forward Mark Bennett Senior Manager of Policy Electric Power Supply Association Restructuring and the Wholesale Market.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
FERC Staff’s Report on Demand Response and Advanced Metering.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NERC OC Special.
Conference on Standard Market Design Issues Alice Fernandez, FERC Staff January 22-23, 2002.
North America Energy Standards Board Craig L. Williams, Specialist Ld.Sr. ISAS Meeting January 13, 2016 Phoenix, AZ W ESTERN E LECTRICITY C OORDINATING.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
NAESB Gas-Electric Harmonization Forum Jerry Dempsey Senior Vice President Sheldan Perry Manager of Gas Systems Houston, TX February 18 and 19, 2016.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Energy Markets at the Crossroads Illinois State University Institute for Regulatory Policy Studies 12 December 2002 Springfield, Illinois Vito Stagliano.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. ISAS Meeting April 20, 2016 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
NERC vs. RTOs July 16, 2001.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Regional Transmission Organizations
ERCOT Technical Advisory Committee June 2, 2005
Pseudo-tie business procedure
North America Energy Standards Board
North America Energy Standards Board
Pseudo-tie business procedure
North America Energy Standards Board
Presentation transcript:

Future of OASIS II Conference Presented by Karl Tammar – NYISO For the ISO/RTO Council March 29, 2005 ISO/RTO Activities and Initiatives

OASIS II Issues and Goals: Many Transactions Crossing RTO Boundaries Numerous Customers doing business with multiple RTOs Remove barriers to the ability to trade Standardizing Electronic Communication in Electric Industry Develop effective processes and tools

Periodic Model Updates Load Forecasts Real-Time Values Constraints Approval Requests Operating Information Economic Unit Set Points NetIntertieSchedule Generation Supply Curves Request Approvals Operating information Market Information Settlement Reports Offers & Bids Bilateral TA Meter Data PlanningScheduling and Dispatch RegulationTransaction Management SettlementsMarket Monitoring Regional Market Participants Local Control Center Functions Periodic Model Updates Load Forecasts Real-Time Values Constraints Approval Requests Operating Information Economic Unit Set Points NetIntertieSchedule Generation Supply Curves Request Approvals Operating information Market Information Settlement Reports Offers & Bids Bilateral TA Meter Data PlanningScheduling and Dispatch RegulationTransaction Management Settlements and Billing Market Monitoring Regional Functions Market Participants ISO/RTO Basic Functions: Demand Response and Retail Access Local Security Automatic Generation Control Data Acquisition Dispatch Gateway Functions

Seams Issues barriers and inefficiencies equipment limitations differences in market rules and designs operating and scheduling protocols, other control area practices inhibit or preclude the ability to transact capacity and energy across control area boundaries.

Regional Seams Initiatives Related to Transaction Scheduling Northeast – IESO, ISO-NE, NYISO, & PJM Removal of Export Charges between control areas (Rate Pan-caking Elimination) E-Tagging Integration- automated response on incoming E-Tag requests and automated updates for bid /schedule changes to the E-tag system resulting from the hour-ahead evaluation. Facilitated Checkout Midwest – MISO & PJM Rate Pan-caking Elimination Congestion Management (improve real-time use of transmission interfaces – Regional Dispatch Coordination) West – SSG-WI: AESO, CAISO, RTO West participants & West Connect participants SSG-WI evaluating proposals and previously submitted white papers Single Market Interface (SMI) work is ongoing

Adopted and De Facto Standards ICCP – Real Time Reliability E-Tag – Blends Reliability & Business OASIS 1A – Physical Transmission Business CIM – Quasi Static Reliability CME – Market Extensions to CIM FCO – Application implementation RTO OASIS/MIS – Market Participant Interface

SCUCSCEDetc Markets Functions Components Data Architecture Market Rules & ISO Operating Procedures/Bus. Processes Day AheadReal Time... What Information is exchanged? System Architecture... Etc.... SMD and Regional Market Designs RegulationScheduling and Dispatch Transaction Management Market Monitoring Etc.... SECAetc EMS Application Integration Bus Other Components Other Data CIM Data Model Market Design/Policy ISO/RTO Systems Market Interfaces Transaction Scheduling InterfaceMarket Information and Reporting Bid/Offer Interface Etc....

ISO/RTO Activity: Facilitated Transaction Checkout Tool for data exchange to support real-time transaction checkout Each Area provides a service that enables neighboring CAs to view their current transaction stack Areas can integrate this data into existing displays to meet the unique needs of their own Operators Changes made on FTC screen seamlessly carry into current scheduling software Supplemental data (e.g. Ramp info) may be added for one Control Area and available for all without it being required for all. Application Implementation Open Architecture (free code sharing) No monthly fee or upgrade costs to third party Total Project cost is limited to internal development time and server costs (45 to 60K US dollars) Project Costs are quickly recovered with reductions in additional staff required for checkout

Goals of CIM for Market Extensions (CME) Project Extend the CIM architecture to support SMD and facilitate markets Focus on the Day-Ahead and Real-Time Market Processes to define extensions needed for the CIM data model to support these processes Standardize information format and application interfaces to make the North American wholesale electricity market run efficiently, reduce seams issues and save substantial costs in the development of applications for each RTO Will allow RTOs to buy best-of-breed applications and communicate with Transmission operating Organizations and/or other ISOs/RTOs in a standard information format Will allow marketers, Load Serving Entities (LSE), and Generator Serving Entities (GSE) to access information and bid in the RTOs preferred format

Scope of CME Project RTO A ISO DRTO C ISO B Generators Loads Marketers CIM extensions in scope for CME XML information exchange model and terms database – message standards to be developed as part of RTO/ISO Data Initiative Market, Load, Generation Participants CIM extension and information exchange model – Other Initiatives and/or Future Phase(s) Inter-ISO/RTO Messaging MIS SCUCSCED Settlement Intra-ISO/RTO Messaging RTO A

Reliability Standards Accountability/ Implementation Standards Working Groups/Task Forces National, State, or Provincial Authority (e.g. FERC) Market Design / Policy /SMD NERC Reliability ISO/RTO Market Design/Rules NAESB Participant Business Practices Regulatory/ Policy Wholesale Market Rules & Operating Procedures Software Architecture and Security Standards Market Interfaces ISO/RTO Related Data Interchange Bilateral Market Standards Market Participant Business Practices/Processes Industry Related Data Interchange NERC working groups/taskforces ISO/RTO Council – Delegation to working groups for specific tasks Direct Participation Working Groups as Required General Structure for Responsibilities Systems Implementation Responsibility Reliability EntitiesISOs/RTOs are Standards Users Standards Users

Challenges for OASIS II SMD Closure Rate Pancaking Data Confidentiality Protecting Existing Investments Determining Business Case

Questions