Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,

Slides:



Advertisements
Similar presentations
High Resolution studies
Advertisements

Confidence Intervals Chapter 19. Rate your confidence Name Mr. Holloways age within 10 years? within 5 years? within 1 year? Shooting a basketball.
Estimating Population Values
Lecture 9 Regression Analysis.
Which Test? Which Test? Explorin g Data Explorin g Data Planning a Study Planning a Study Anticipat.
Copyright © 2014 by McGraw-Hill Higher Education. All rights reserved.
National Town Meeting on Demand Response Focus on Pepcos Washington, DC Residential Smart Meter Pilot Program Presented By Steve Sunderhauf July 14, 2009.
Evaluating the Effects of Business Register Updates on Monthly Survey Estimates Daniel Lewis.
Risk and return (1) Class 9 Financial Management,
Describing Data: Measures of Dispersion
BUS 220: ELEMENTARY STATISTICS
Credit Cards 101. Shopping for A Credit Card Comparison shop credit cards Dont take the first offer that comes to you: –Pre-approval Means nothing No.
Copyright © 2010 Pearson Education, Inc. Slide
1 Week 2 Sampling distributions and testing hypotheses handout available at Trevor Thompson.
7.1 confidence Intervals for the Mean When SD is Known
Simple Linear Regression 1. review of least squares procedure 2
Samples The means of these samples
Normal Distributions: Finding Values
CHAPTER 16 Life Tables.
Confidence Intervals and the Missing Link. Youve taught students the normal curve and the central limit theorem, but they just dont get confidence intervals.
Capacity and Constraint Management
Capacity and Constraint Management
Network and System Design
Cost estimation - Cost behavior What we really want to understand is how spending will vary in a variety of decision settings. Cause-effect relations and.
Statistical Sampling.
Figure 1. PX Prices and Total ISO Load (May 15 - August 31, 2000) MW $/MWh.
Quantitative Analysis (Statistics Week 8)
Healey Chapter 7 Estimation Procedures
Do Now Do you have extra credit to turn in? Get out pink review paper.
Module 16: One-sample t-tests and Confidence Intervals
CHAPTER 20: Inference About a Population Proportion
CHAPTER 14: Confidence Intervals: The Basics
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Simple Linear Regression
Sampling and Sample Size Determination
Presented to the PWG Meeting of May 26, 2010
1 Simple Linear Regression Chapter Introduction In this chapter we examine the relationship among interval variables via a mathematical equation.
1 BA 555 Practical Business Analysis Review of Statistics Confidence Interval Estimation Hypothesis Testing Linear Regression Analysis Introduction Case.
1 Marketing Research Aaker, Kumar, Day Ninth Edition Instructor’s Presentation Slides.
Plant Utility System (TKK-2210)
Overview – Non-coincident Peak Demand
AM Recitation 2/10/11.
Introduction to Linear Regression and Correlation Analysis
Aim: How do we find confidence interval? HW#9: complete question on last slide on loose leaf (DO NOT ME THE HW IT WILL NOT BE ACCEPTED)
Copyright © Cengage Learning. All rights reserved. 13 Linear Correlation and Regression Analysis.
Copyright © 2013, 2010 and 2007 Pearson Education, Inc. Chapter Inference on the Least-Squares Regression Model and Multiple Regression 14.
1 Least squares procedure Inference for least squares lines Simple Linear Regression.
Marketing Research Aaker, Kumar, Day Seventh Edition Instructor’s Presentation Slides.
Section 8.2 Estimating Population Means (Large Samples) HAWKES LEARNING SYSTEMS math courseware specialists Copyright © 2008 by Hawkes Learning Systems/Quant.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
Confidence Interval Estimation
Technical Conference on Net Metering Load Research Study November 5, 2014.
University of Ottawa - Bio 4118 – Applied Biostatistics © Antoine Morin and Scott Findlay 08/10/ :23 PM 1 Some basic statistical concepts, statistics.
Section 8.2 Estimating Population Means (Large Samples) HAWKES LEARNING SYSTEMS math courseware specialists Copyright © 2008 by Hawkes Learning Systems/Quant.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
Correlation and Prediction Error The amount of prediction error is associated with the strength of the correlation between X and Y.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
Confidence Interval Estimation For statistical inference in decision making:
Confidence Interval Estimation For statistical inference in decision making: Chapter 9.
LOAD RESEARCH Irrigation Load Study Utah Cost of Service Task Force August 25, 2005.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Simple Linear Regression Analysis Chapter 13.
1 Simple Linear Regression and Correlation Least Squares Method The Model Estimating the Coefficients EXAMPLE 1: USED CAR SALES.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Business Statistics: A First Course 5 th Edition.
PWG Long Term Strategy How do we maximize scarce resources?
Marketing Research Aaker, Kumar, Day and Leone Tenth Edition Instructor’s Presentation Slides 1.
2015 SDG&E PTR/SCTD Evaluation DRMEC Spring 2016 Load Impact Workshop George Jiang May 11 th, 2016 Customer Category Mean Active Participants Mean Reference.
Estimating Population Means (Large Samples)
Aaker, Kumar, Day Ninth Edition Instructor’s Presentation Slides
Emergency Response Service Baselines
Presentation transcript:

Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson, Supervisor-Load Research, GoodCents

Introduction to Sample Design Sample Size Determining Sample Size General formula N=CV 2 /(D/Z) 2, where CV is coefficient of variation, D is percent accuracy desired, and Z is the standard normal deviate for the confidence level desired, Z=1.65 for 90% confidence, 1.96 for 95% confidence

Introduction to Sample Design Sample Size Determining Sample Size Example, 100,000 AC, estimate connected load CV estimate is 0.5 What sample size is necessary to know average connected load to within 10% at 90% confidence? N=CV 2 /(D/Z) 2, N=(0.5) 2 /(0.1/1.65) 2 N=68

Introduction to Sample Design Sample Size

Determining Sample Size Problems encountered in Research –No estimate of Population CV available –Solution, Use a correlated readily available variable- almost always billed kWh use –For AC load Management, recommend using July or August kWh use

Introduction to Sample Design Sample Size Determining Sample Size If we have population data available on a correlated variable such as billed kWh or AC connected load, we can use an alternate formula for sample size

Introduction to Sample Design Sample Size Determining Sample Size N=(1-R 2 )*CV 2 /(D/Z) 2 Where R is an estimate of the correlation of AC load and August billed kWh and CV is the coefficient of variation of August billed kWh

Introduction to Sample Design Sample Size

AC Maximum Demand versus August kWh- R= using actual End Use LR data, Assume CV of August kWh=0.75 N=(1-R 2 )*CV 2 /(D/Z) 2 N=( )*153 N=101

Introduction to Sample Design Sample Size Note on CV Estimates CV for Residential Class varies widely –CV Examples- 500,000 population –700,000 population – 0.6 –Calculate CV from Actual Billing Records

Introduction to Sample Design Sample Size Note on Residential Sample Sizes, CV Estimates Typical sample size assuming CV of 0.75 is 150 Use of Regression Estimator typically reduces sample size to about 115 points assuming R=0.5

Introduction to Sample Design Stratification Stratification- Dividing the population into smaller groups with like variance We recommend stratification to improve the overall load reduction estimates

Introduction to Sample Design Stratification Stratification How to determine strata boundaries to minimize variance? Use method of Dalenius and Hodges (DH)

Introduction to Sample Design Stratification

Introduction to Sample Design Allocation of Sample to Strata We now know our strata and we will assume a sample size of 150 Do we assume 50 sample points per strata? We use Neyman allocation to allocate to strata based on σ of design variable and number of units in each strata

Introduction to Sample Design Allocation of Sample to Strata

Introduction to Sample Design Test and Control Groups Dont we need a test and control group since this is basically an experiment to see the effects of load control on AC use? The problems with a test and control group involve cost to do the research and matching up customer demographics and usage patterns to get comparable groups

Introduction to Sample Design Test and Control Groups We prefer to use the test group as its own control, therefore we do not have to match up demographics and we only need one sample Customers will be controlled on some days and not controlled on others Comparison will be of AC or premise loadshapes on control versus no-control days We will use regression analysis to develop the control estimates from our sample

Data Collection and Analysis Metering Equipment Interval Load Data –Interval load data is necessary to develop load impact estimates for load management programs –We recommend the collection of at least hourly interval load data and if possible 15- minute data –The 15 minute data is averaged to get the hourly data

Data Collection and Analysis Metering Equipment Premise Metering –Meter Premise with interval meter –Estimate AC load reduction using premise data –Data must be collected monthly or can be collected real time if an AMR system is deployed –Costs $ per point

Data Collection and Analysis Metering Equipment Premise Metering –Utility may have interval meters for cost of service load study- no extra cost for equipment –Customer may not need to be recruited, Utility can gather data since utility owns meter –Load Reduction may be due to other equipment being turned off –Recommend sample size of at least 150 points if using premise meters only

Data Collection and Analysis Metering Equipment End Use Metering –Can Meter AC Compressor and other load managed end uses directly, highly accurate (99%) – Load Reduction Estimates are very accurate, smaller sample sizes (<100) can be used since CV of AC is less than CV of premise –Customer has to be recruited. Unit must be located next to Home load center( panel box), Unit needs a telephone line, either dedicated line or use customers line for downloads. May need to pay customer incentive

Data Collection and Analysis Metering Equipment End Use Metering –Can also gather indoor temperature data and premise data –Cost per site for installation, equipment and 12 months of data collection is $2,000- $3,000 or more per point

Data Collection and Analysis Metering Equipment

Run Time Data Collection This involves a low cost device (<$100) that senses the on and off time of the compressor Data must be collected on site and downloaded to a shuttle once a month A large sample size is recommended due to high failure rate (15-20%) of data collection

Data Collection and Analysis Metering Equipment Run Time Data Collection failure is usually due to improper placement of the equipment or other equipment interfering with the signal This data requires more analysis time since the on-off time must be converted to kW, Data is discontinuous

Data Collection and Analysis Characteristics Data Characteristics data should be collected at each home –Necessary Data AC/ WH Nameplate, Make, Model, Serial Number Total Square Footage Indoor Daytime Thermostat Setting –Like to Have Number of Floors (square footage of each if available) Number of people in household Outdoor Construction

Data Collection and Analysis Weather Data We have found that NWS or CMS data for the nearest station is preferable to data collected at the site. This is because site data is not collected using NWS/CMS standards. Daily and Hourly data can be used in the modeling process. We typically use Daily maximum temperature data. Indoor temperature Data is useful if end use metered data is available.

Data Collection and Analysis End Use Database The interval load, weather,control and characteristics data must be combined into one database for analysis. We recommend careful review of the database to ensure that the various files have been merged correctly before beginning modeling. Plots of data are helpful in identifying problems. We recommend and use SAS ® for data analysis, graphics and modeling.

Data Collection and Analysis Regression Modeling Our methodology is to develop a model from a sample of customers with interval data gathered on control and non-control days. The model is typically developed by strata and over a maximum outdoor temperature range for which AC load data is available.

Data Collection and Analysis Regression Modeling The SAS System 14:17 Thursday, December 8, The FREQ Procedure Table of control by Maximum Temperature control Maximum Temperature Frequency Percent Row Pct Col Pct Total ƒƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆ ƒƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆ ƒƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆƒƒƒƒƒƒƒƒˆ Total

Data Collection and Analysis Regression Modeling A model we typically use assumes AC use is determined by the temperature difference between the maximum daily temperature and the daytime thermostat setting squared multiplied by the size of the AC compressor in kW Models are developed by AC size strata used in the sample design process

Data Collection and Analysis Regression Modeling ACLOAD(Hour t, SiteJ) =A+B1*controlmaxmaxt2:(ACMaxkW(site J))*(0=no control in hour t, 1=control in hour t)*(max temperature-thermostat setting)**2 +B2*maxacdb2:(ACMaxkW(site J))*(max temperature-thermostat setting)**2 +B3*aclag:Hour 13 ACLoad(site(J))

Data Collection and Analysis Regression Modeling A is the regression intercept and B1, B2 and B3 are regression coefficients determined during the modeling process. The B1 coefficient is the load reduction estimate for a 1 kW AC at hour t and a given temperature and thermostat setting. A total of 12 regressions were estimated. These are cross-sectional models and are estimated with all data from all sites for each strata and hour of control.

Data Collection and Analysis Regression Modeling Strata=1 (0-3 kW) HR=15 The REG Procedure Model: MODEL1 Dependent Variable: ac Number of Observations Read 1303 Number of Observations Used 1302 Number of Observations with Missing Values 1 Analysis of Variance Sum of Mean Source DF Squares Square F Value Pr > F Model <.0001 Error Corrected Total Root MSE R-Square Dependent Mean Adj R-Sq Coeff Var

Data Collection and Analysis Regression Modeling Strata=1 (0-3 kW) HR=15 The REG Procedure Model: MODEL1 Dependent Variable: ac Parameter Estimates Parameter Standard Variable DF Estimate Error t Value Pr > |t| Intercept <.0001 controlmaxmaxt <.0001 maxacdb <.0001 aclag <.0001

Data Collection and Analysis Regression Modeling

Mean AC Size, Thermostat Settings By Strata Daytime AC Size Thermostat StratakWTonsSetting

Data Collection and Analysis Regression Modeling A sample calculation for strata 3 for hour 17 for a temperature of 98 Degrees is shown below using data from Tables above. Control Coefficient (controlmaxmaxt2) Temperature- 98 Degrees Daytime Thermostat Setting Average Connected AC kW Control Estimate= *( )*( )* = kW.

Data Collection and Analysis Regression Modeling Strata 1 Weighted Control Estimate = kW * = kW Strata 2 Weighted Control Estimate = kW * = kW Strata 3 Weighted Control Estimate = kW * = kW Population Weighted Average Control Estimate for Hour 17, Maximum Daily Temperature 98 Degrees= kW at Customers meter.

Data Collection and Analysis Testing the Model Statistical Validity –Do coefficients have the right sign? –Are coefficients significant, T>1.65? Do the results make sense? –Is the control too much >average connected load times cycling percentage? –Is the control too small <<average connected load times cycling percentage?

Data Collection and Analysis Model Accuracy The stratified regression coefficients can be used to develop an estimate of the accuracy of the load reduction estimate by calculating the overall variance of the control estimate.

Forecasting Load Reductions Current Forecast The results of the regression model can be used to forecast current load reductions The output is typically a time-temperature matrix of load reductions The weighted load reduction mean estimate for each control hour is multiplied by the number of program participants

Forecasting Load Reductions Current Forecast

The forecast is only valid over the temperature range that the model was estimated over This may be an issue if you have only one year of history with maximum temperatures of say 93 degrees and you need estimates up to 100 degrees

Forecasting Load Reductions Thank You Contact Information X1067 Cell X1059