June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 1 North American Energy Standards Board Capacity Release Modifications Summary.

Slides:



Advertisements
Similar presentations
Setting Natural Gas Prices Prepared by: Mark R
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
SFAS 142 Valuation Case Study
1 Simplification & Harmonization: CPAP & AWP S and H Roll Out Countries Nairobi 25 – 27 June 2003.
North American Energy Standards Board (NAESB) Procedures (Note : Titles of Swim lanes change periodically) NAESB Office Triage Subcommittee Executive Subcommittee.
December 1-2, 2004 Energy Day Meetings 1 North American Energy Standards Board Wholesale Gas Quadrant Overview of Gas Day Standards December 2004.
June 22, 2005 NAESB Board of Directors Meeting, San Antonio, Texas 1 North American Energy Standards Board Meeting of the Members NAESB Board of Directors.
Measurement and Verification Standards for Demand Response in Wholesale Electric Markets September 30, 2009 Eric Winkler, Ph.D. Project Manager, Demand.
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Parallel Flow Visualization/Mitigation Proposal
1 No Sends Annual Plan or Request to BPS Receives Annual Plan or Request From EC EC BPS IR TEIS Develops recommendation to decline and Balanced Vote to.
Energy Day Timing Issues and Operational Concerns Pipeline Segment Wholesale Gas Quadrant North American Energy Standards Board Business Practices Subcommittee.
Business Practices Subcommittee Update August 17, 2010.
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 30, 2009 Eric Winkler, Ph.D. Project.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Overview Presented to: Data Privacy Task Force February.
North American Energy Standards Board (NAESB) Procedures (Note : Titles of Swim lanes change periodically) NAESB Office Triage Subcommittee Executive Subcommittee.
Standards Review Subcommittee Update February 1, 2011.
NAESB Coordinate Interchange
Business Practices Subcommittee Update February 2, 2010.
M. Novak 11/30/05 DRAFT Presentation to Joint REQ/RGQ Executive Committee 1 REQ/RGQ Consolidation Proposal Consolidate the two retail quadrants into one.
Standards Review Subcommittee Update May 12, 2009.
March 5, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Gas-Electric Interdependency Standards.
Standards Review Subcommittee Update May – August 2008 August 19, 2008.
Business Practices Subcommittee Update April 30, 2012.
Development of Model Business Practices Process Flows (Note : Titles of Swim lanes change periodically) NAESB Office Triage Subcommittee Executive Subcommittee.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
ACCESS TO GENETIC RESOURCES AND BENEFIT-SHARING UNDER THE CONVENTION ON BIOLOGICAL DIVERSITY by Valérie Normand Secretariat of the Convention on Biological.
1 The EU and the Turkish Cypriot community Jan Truszczynski, Deputy Director General DG Enlargement, European Commission Nicosia, 6 March 2008.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA)
Unauthorized Commitments
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Louisiana Public Service Commission Technical Conference: Natural Gas Hedging for the Investor Owned Utilities July 26, 2013.
How to Prepare a Quality Modification Request
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
Mississippi Special Education Advisory Panel Annual Report to the State Board of Education July 2009.
July 14, 2009 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Review with the Demand Response Coordinating.
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
North American Energy Standards Board Activities and Work Group Update Market Issues Subcommittee August 9-10, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
BY-LAWS COMMITTEE PRESENTATION MARCH 2007 PRESIDENTS CONFERENCE.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
Business Communication Report Writing
Recommended Administrative Structure for Rotary Clubs
July 15, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NARUC Summer Session 2007 NAESB Update to NARUC.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
RESEARCH REPORT PREPARATION AND PRESENTATION. 2 RESEARCH REPORT A research report is: – a written document or oral presentation based on a written document.
2009 NWCCU Annual Meeting Overview of the Revised Accreditation Standards and New Oversight Process Ronald L. Baker Executive Vice President and Director,
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
1 North American Energy Standards Board EPSA Regulatory Affairs Conference NAESB Activities in the Wholesale Electric Market Washington, DC October 25,
2008 All Source Participants WorkshopJune 19, Participants Workshop All Source RFO June 19, 2008.
® July 30 th, 2014 Utah PSC Technical Conference.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
Standards Review Subcommittee Update August 17, 2010.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
PORT OF TACOMA. Request adoption of Resolution , amending the Port’s Master Policy and superseding Resolution Master Policy Resolution.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
How to Prepare a Quality Modification Request
QPTM-Capacity Release
Standards Review Subcommittee Update
Presentation transcript:

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 1 North American Energy Standards Board Capacity Release Modifications Summary of Recommendation for Capacity Release Modifications Technical Implementation and Standards/Definitions NAESB Board of Directors

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 2 North American Energy Standards Board Capacity Release Modifications On May 14, 2009, the WGQ Executive Committee adopted the page recommendation. The WGQ Membership ratified the recommendation on June 15, The modifications will be included in the WGQ Version 1.9 publication.

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 3 North American Energy Standards Board Capacity Release Modifications Background Modifications to the capacity release business standards corresponding to Order No. 698 were adopted by the WGQ Executive Committee (EC) on June 25, 2008 and subsequently ratified by the membership on August 25, Additional modifications corresponding to FERC Order No. 712/712A were adopted by the Business Practices Subcommittee on July 10, The recommendation provides the full staffing of the business standards to ensure standardized implementation across the industry. As a result of developing the technical implementation, additional changes to the standards adopted by the EC were identified and adopted by the WGQ Business Practices Subcommittee on March 16, 2009.

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 4 North American Energy Standards Board Capacity Release Modifications What does the recommendation cover? 2009 Annual Plan Item 3a - FERC Order Nos. 698/698-A – Index-Based Pricing 2009 Annual Plan Item 4b - FERC Order Nos. 712/712-A – BPS i. Lifting of price cap for transactions for term one year or less ii. Asset Management Arrangements iii. Retail Choice Programs iv. Tying of inventory related requirements associated with a storage release Accommodation of market-based rates Related Miscellaneous NAESB Requests – R07018, R08019 and R08024 (data element usage change and new code values) Note: For purposes of this implementation, the Offer Upload and Bid Upload are not available to be communicated via NAESB WGQ EDI/EDM.

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 5 North American Energy Standards Board Capacity Release Modifications Accommodation of Market-Based Rates Added a data element, Market-Based Rate Indicator, to identify if the base contract of the capacity release transaction utilizes a FERC approved market-based rate. Recognition that market-based rate transactions do not have associated minimum/maximum tariff rates.

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 6 North American Energy Standards Board Capacity Release Modifications FERC Order Nos. 712/712-A Added four new data elements: 1.Replacement Shipper Role Code – identifies whether the transaction: a. involves an Asset Management Arrangement (AMA) b. is associated with a Retail Choice Program (RCP) c. or neither (Other) 2.Storage Inventory-Conditioned Release Indicator – identifies storage release transactions with inventory condition(s) 3.Special Terms and Miscellaneous Notes – AMA – location of AMA obligation(s) 4.Special Terms and Miscellaneous Notes – Storage Inventory Conditions – location of related inventory requirements

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 7 North American Energy Standards Board Capacity Release Modifications Index-Based Releases (IBR) Identifies whether the transaction being released utilizes Index-Based Pricing and if so, how it is priced: a.Basic Formula – process within the one hour time line b.Unique Formula – may have to processed outside of the one hour time line

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 8 North American Energy Standards Board Capacity Release Modifications Index-Based Release – Basic Formula: The structure of an IBR Basic Formula is: (IBR Index Reference 1 Multiplier * Index 1) +/- (IBR Index Reference 2 Multiplier * Index 2) +/- (IBR Formula Variable) Example of a Basic Formula: The Releasing Shipper offers a formula that equates to 90 percent of one index reference minus 85 percent of another index reference, plus 10 cents

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 9 North American Energy Standards Board Capacity Release Modifications IBR Release - Unique Formula The releaser offers a formula that does not fit into the Basic Formula. In these situations, a complete description of the formula, the indices, all identifying information, rate components and other factors necessary to calculate a rate must be included in the IBR Unique Formula Special Terms.

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 10 North American Energy Standards Board Capacity Release Modifications Transactional Reporting – Capacity Release, Firm Transportation and Interruptible Transportation: In addition to other data elements previously adopted by NAESB for inclusion in Version 1.9, a number of new data elements were added to the 3 transactional reporting data sets to more clearly disclose the terms of the transaction(s).

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 11 North American Energy Standards Board Capacity Release Modifications Transactional Reporting – Capacity Release: i. Allowable Re-release Indicator ii. Business Day Indicator iii. IBR Index-Based Capacity Release Indicator iv. Market-Based Rate Indicator v. Permanent Release Indicator vi. Prearranged Deal Indicator vii. Previously Released viii. Recall Notification Period Indicators (one for each cycle) ix. Recall/Reput Terms x. Replacement Shipper Role Indicator xi. Right to Amend Primary Points Indicator xii. Right to Amend Primary Points Terms xiii. Special Terms and Miscellaneous Notes – AMA Obligations xiv. Special Terms and Miscellaneous Notes – Storage Inventory Conditions xv. Storage Inventory-Conditioned Release Indicator

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 12 North American Energy Standards Board Capacity Release Modifications Other Items Added for Improved Understanding Expanded detail was included in the Technical Implementation of Business Practices (TIBP) to provide guidance on how these data concepts work – including, but not limited to: a.expanded narrative explanation b.sections devoted solely to Index-Based Release transactions c.instructions on how to accommodate a bidders desire to bid 100% of the maximum reservation rate (modified NAESB WGQ Standard No ) d.multiple Sample Papers e. Data Element Quick Guides to assist in understanding multiple dependencies within the data sets.

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 13 North American Energy Standards Board Capacity Release Modifications The development of the technical implementation took: 30+ meetings days over 12 months = approximately 2,000+ man hours

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 14 North American Energy Standards Board Capacity Release Modifications Q&A