Commercial Implications of ERR Calculations Option 3 method vs. Transaction method.

Slides:



Advertisements
Similar presentations
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Advertisements

1. ***Confidential*** Concerns Tag Non Firm Option October 10, 2010 Bert Bressers 2.
Flowgate Allocation Method Examples of Proportional Curtailment of FIRM PTP and GTL Houston, December 1-2, 2010.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
First to Curtail – Last to Curtail Examples December 1 – 2, 2010 (Revised based on Requests/Suggestions During Review) 1.
First to Curtail – Last to Curtail Examples December 1 - 2,
Parallel Flow Visualization/Mitigation Proposal
Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
White Paper on the Future of Congestion Management IDC Granularity Task Force Standing Committee Meetings July 20-22, 2004.
Business Practices Subcommittee Update February 2, 2010.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
Intra-BA Pseudo Ties Errors to Market Flow Calculations Nate Schweighart Tennessee Valley Authority 02/11/2014.
Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Case Study 250,000 square foot suburban office building
Timothy R. Mayes, Ph.D. FIN 3300: Chapter 9
Capital Investment Decisions
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Ch 6 Project Analysis Under Certainty
4. Project Investment Decision-Making
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 14 Strategic Investment Decisions.
Element Definition Process Presented by Peak to ECC Task Force April 28, 2015.
EE 369 POWER SYSTEM ANALYSIS
FINAL EXAM REVIEW Fall Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present Worth.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
1 Capital Budgeting Capital budgeting - A process of evaluating and planning expenditure on assets that will provide future cash flow(s).
Business Funding & Financial Awareness Time Value of Money – The Role of Interest Rates in Decision Taking J R Davies May 2011.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Portfolio Performance Evaluation 03/09/09. 2 Evaluation of Portfolio Performance What are the components of portfolio performance evaluation? What are.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
Implications of Engineering Analysis Assumptions Organization of MISO States: CARP XII December 14-15, 2009 Nick Bowden: 1.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
1 Chapter Nine Capital Budgeting. 2 Capital Budgeting Decisions require sizable commitments of cash. are expected to generate returns that will last more.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Highlights of Midwest ISO: 2004 State of the Market Report and Day-2 Energy Markets Prepared by: David B. Patton, Ph.D. Independent Market Monitor Midwest.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
The Environment Institute Where ideas grow Water Reform How far and where do we need to go? Mike Young Executive Director, The Environment Institute.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
Accounting Rate of Return mefielding.com1. Definition  Accounting rate of return (also known as simple rate of return) is the ratio of estimated accounting.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interchange Distribution Calculator Working Group (IDCWG) Update
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Economic Concepts Christopher R. Bennett
Entry Capacity Overrun price calculation
Bus 512- Capital Budgeting | Dr. Menahem Rosenberg
Enhanced Curtailment Calculator (ECC)
Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.
Request for Information IDC Granularity Option 3/3A
Point 14 Inventory Cost (1): Specific Identification and Average Cost
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Presentation transcript:

Commercial Implications of ERR Calculations Option 3 method vs. Transaction method

A C B D E F G H I Sample 9-bus System

A C B D E F G H I A Purchases From B

A C B D E F G H I Flows for B to A

A C B D E F G H I B Purchases from G

A C B D E F G H I Flows for G to B

A C B D E F G H I G Purchases from F

A C B D E H I Flows for F to G F G

A C B D E H I Net Flows for F to A F G

A C B D E H I Assume Constraint on Flow-gate G-I F G Proposed Option 3: IRR: All BAs could have some congestion costs ERR: F and A would share in remainder of the congestion costs Note: Option 3 still requires the calculation of TDFs on flowgate G-I for a transaction from F to A

A C B D E F G H I B-A and F-G Impacts on Flowgate G-I Both F and A are imposing flows counter to constraint Question: On what commercial basis should F and A bear any ERR congestion cost responsibility?

A C B D E F G H I True Cause of Constraint Transaction G-B Caused flows that contribute to constraint More Appropriate Option: IRR: All BAs could have some congestion costs ERR: Transaction G-B bears remainder of the congestion costs Note: Uses same data to calculate TDFs on flowgate G-I, but for a transaction from G to B instead. Also, no weighted average involved.

Implications RC can still simply redispatch to resolve the G-I constraint. By submitting tags, the following is true –PSE A is willing to accept responsibility for congestion caused by transaction B-A –PSE B is willing to accept responsibility for congestion caused by transaction G-B –PSE G is willing to accept responsibility for congestion caused by transaction F-G The same TDF data set are required for both Option 3 and this modified proposal Improved IDC granularity will resolve any concerns regarding incremental generation vs. tag source –Tag Source -> ERR –Incremental generation -> IRR