Energy Day Dolores Chezar – KeySpan Energy Kathryn Burch – Duke Energy January 24, 2005.

Slides:



Advertisements
Similar presentations
NAESB WEQ/WGQ Business Practices Subcommittee Jan
Advertisements

In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Demand Response Commissioner Suedeen Kelly June 3, 2008.
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
December 1-2, 2004 Energy Day Meetings 1 North American Energy Standards Board Wholesale Gas Quadrant Overview of Gas Day Standards December 2004.
Future of OASIS II Conference Presented by Karl Tammar – NYISO For the ISO/RTO Council March 29, 2005 ISO/RTO Activities and Initiatives.
© 2004 Dominion Dominion Proposal January 24, 2005.
©2005 PJM 1 Development of Wholesale Electricity Scheduling and OASIS Determining the Future Needs of the Open Access Same-time Information System Andy.
NiSource Presentation of Work Paper on Request to Create a Standard Energy Day January 2005.
Energy Day Timing Issues and Operational Concerns Pipeline Segment Wholesale Gas Quadrant North American Energy Standards Board Business Practices Subcommittee.
1 Intra-Day Nominations through a Posted Point of Restriction Kathryn Burch Project Manager – Standards and Regulatory Compliance Spectra Energy Transmission.
NAESB Coordinate Interchange
March 5, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Gas-Electric Interdependency Standards.
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Natural Gas Tutorial MIC Meeting March Discussion Topics Analogies. Electric vs. Gas day. Trading & Scheduling. Operating Constraints.
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Enhanced Day Ahead Commitment Project: Enhancements to the DACP IESOTP 244-3d.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Topics The Midwest ISO The Midwest Market Market Design Process
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
PJM©2013 Future Generation Mix in PJM Governor’s Conference on Energy Richmond, VA Steven R. Herling Vice President, Planning PJM Interconnection October.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
OPSI Annual Meeting Bob Hayes Vice President Natural Gas Trading October 13, 2014.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
0 Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power October 15, 2012.
Stan Chapman SVP, Marketing & Customer Services Oct 8, 2013.
® July 30 th, 2014 Utah PSC Technical Conference.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
1 October 2003 Electricity Markets Regional Evolution Randy Berry
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
M. Novak/NFGDNAESB Energy Day Mtgs. 1/24-25/051 R04016 – Energy Day Problem Statement Develop a standard energy day that would: –Apply to both the electric.
Conference on Standard Market Design Issues Alice Fernandez, FERC Staff January 22-23, 2002.
1 NAESB Standards Request R04016 Summary of Strawman Proposal of The New Jersey Companies January 24-25, 2005.
Gas/Electric Coordination OPSI Annual Meeting October 12, 2015 Asim Z. Haque Vice-Chairman Public Utilities Commission of Ohio.
NAESB GEH Forum Dan Buckner Director of Fuels Origination and Strategic Development.
Market Implications and Considerations for Enhanced Scheduling Flexibility: Facts Observations Problems Solutions February 2016 Greg Lander– President.
Mario S. DePillis Jr. USAEE Meeting, Pittsburgh, PA October 25-28, 2015.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
Aligning the Gas and Electric Markets: EDF Solutions
Energy Day Strawman Proposal
North American Markets Status
Electricity Wholesale Markets: Designs for a low-carbon future
APEx Conference 2016 October 12-14, Medellin Panel 1 – Value of Markets and Future Development Presenter: Restricted.
OPSI 10th Annual Meeting Improving Generation Performance
Gas-Electric Coordination Can New Services Bridge the Divide?
New England Electricity Restructuring Roundtable
Resilience and Reliability in PJM’s Competitive Markets
Presentation transcript:

Energy Day Dolores Chezar – KeySpan Energy Kathryn Burch – Duke Energy January 24, 2005

Energy Day Objectives Promote Fair, Reliable, Safe and Efficient Service to all segments of the Energy Industry. Develop a Standard Energy Day for the Gas and Electric Industries Eliminate Split Peak for Gas Generation - begin Standard Energy Day during an off-peak period Enhance communication and coordination across both gas and electric industries Allow both industries to more closely match fuel deliveries with generation requirements Alleviate the disconnect between gas and electric scheduling – R04020 Any move toward a Standard Energy Day will impact both the electric and gas industries.

Electric Day Ahead Market Scheduling versus Gas Day Nominations – All Times Central 12am 12 pm 6 am 6 pm 3 am9 am 3 pm9 pm Gas Nominations and Scheduling RTO Markets Timely Intra Day 1 Evening Intra Day 2 Noms due 11:30 AM PJM ISO NE CAISO MISO Mkt Bids due 11 AM Init Commitment Sched 3 PM Mkt Bids due 11 AM Init Commitment Sched 3 PM Mkt Bids due 8 AM Init Commitment Sched 2 PM Mkt Bids due 11:30 AM Init Commitment Sched 1 PM Confirmations 3:30 PM Noms due 10 AM Noms due 5 PM Noms due 6:00 PM Confirmations 1 PM Confirmations 8 PM Confirmations 9 PM NY ISO Mkt Bids due 4 AM Init Commitment Sched 10 AM

Electric Market Scheduling versus Gas Nominations – All Times Central Electric Market Scheduling Day Ahead MarketMarket Bids Due Initial Commitment Schedule Issued Re-Bid Period NY ISO4 AM – 10 AM4 AM10 AM PJM11 AM – 5 PM11 AM3 PM3 PM – 5 PM ISO NE11 AM – 5 PM11 AM3 PM3 PM – 5 PM MISO8 AM – 2 PM8 AM2 PM CAISO11:30 AM – 2 PM11:30 AM1:00 PM1 PM – 2 PM Gas NominationsNominations Due Confirmation of Scheduled Volumes Gas Flow Timely11:30 AM 3:30 PM - Confirmed 4:30 PM – Scheduled 9 AM Next Day Evening6 PM 9 PM – Confirmed 10 PM - Scheduled 9 AM Next Day Intra-Day 110 AM 1 PM – Confirmed 2 PM - Scheduled 5 PM Same Day Intra-Day 25 PM 8 PM – Confirmed 9 PM - Scheduled 9 PM Same Day

REAL TIME ELECTRIC MARKET Changes to just the gas nomination cycle will not resolve electric scheduling concerns. Solution involves action by FERC and ISOs/RTOs to provide incentives to electric generators to contract for firm pipeline capacity. FERC could provide recovery of pipeline reservation charges in rates or through other mechanisms. ISOs /RTOs could provide dispatch priority or other preference for holders of firm capacity. Pipelines could design services to meet the needs of electric generation.