B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercially Similar Taskforce Report Taskforce Update January 15, 2013.

Slides:



Advertisements
Similar presentations
EP & Boundary Questions
Advertisements

Percent Composition Empirical Formula Molecular Formula
Estimating Population Values
Understanding Value Stream Decision Making
Covalent Bonding: Orbitals
From percentage to formula
Flexible Budgets, Variances, and Management Control: II
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Future Value, Present Value and Interest Rates.
Chapter 7 Constructors and Other Tools. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 7-2 Learning Objectives Constructors Definitions.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Extended Learning Module D (Office 2007 Version) Decision Analysis.
Commercial Implications of ERR Calculations Option 3 method vs. Transaction method.
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Whiteboardmaths.com © 2007 All rights reserved
Measurements and Their Uncertainty 3.1
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Public Notice: To provide parents and the general public with information on how AZ schools are performing Accountability: To identify schools that are.
MISO Southern Region Integration – ARR/FTR Timeline FTR WG February 6,
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
FERC Order minute Scheduling.
Binary Relations Binary Relations on Real Numbers.
Discrete Random Variables and Probability Distributions
Introduction to Cost Behavior and Cost-Volume Relationships
Cost Control and the Menu—Determining Selling Prices and Product Mix
The AKS Primality Test Ilse Haim Directed Reading Program
Open Season MT to Idaho Calendar of Events Posted on NWE OASIS September 30, 2004 (Slide 8 updated 2/28/05)
Math Word List 5.
Contingency tables enable us to compare one characteristic of the sample, e.g. degree of religious fundamentalism, for groups or subsets of cases defined.
Cost-Volume-Profit Relationships
23-1 Simple Circuits.
COMP 482: Design and Analysis of Algorithms
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management 6e..
Developing the Project Plan
The challenge ahead: Ocean Predictions in the Arctic Region Lars Petter Røed * Presented at the OPNet Workshop May 2008, Geilo, Norway * Also affiliated.
VOORBLAD.
Solving Equations How to Solve Them
R.USHA TGT ( MATHEMATICS) KV,GILL NAGAR CHENNAI.
Solving Linear Inequalities Solving Linear Inequalities
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
A Third Look At ML 1. Outline More pattern matching Function values and anonymous functions Higher-order functions and currying Predefined higher-order.
Chemistry 18.2.
Elasticity of Demand and Supply
What Could It Be? Finding Empirical and Molecular Formulas.
FINANCIAL PLANNING FOR SENIOR MANAGERS ACCOUNTING METHODS AND FORMATION OF FINANCIAL STATEMENTS PAUL LOWER FOR ReCh MANAGEMENT CENTRE 1.
Inferential Statistics
Rate of Return Multiple Alternatives Lecture slides to accompany
Flexible Budgets and Performance Analysis
Pass out calculators. Warm Up Questions: 1.What is the solution to the system of equations shown below? Y = 2x – 2 8x + 2y = What value of n makes.
4/4/2015Slide 1 SOLVING THE PROBLEM A one-sample t-test of a population mean requires that the variable be quantitative. A one-sample test of a population.
Control Structure: Loop (Part 1) Knowledge: Understand the various concepts of loop control structure Skill: Be able to develop a program involving loop.
Section 7.6 Solving Radical Equations  The Power Principle for Equations If A = B then A n = B n  The Danger in Solving an Equivalent Equation  Equations.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 3 Section 2 – Slide 1 of 27 Chapter 3 Section 2 Measures of Dispersion.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
1 Capacity Forecast Report Mark Ruane Director, Market Credit CWG / MCWG March 10, 2015 ERCOT Public.
Learning Objective Chapter 12 Sample Size Determination Copyright © 2000 South-Western College Publishing Co. CHAPTER twelve Sample Size Determination.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
MTH 070 Elementary Algebra Chapter 2 Equations and Inequalities in One Variable with Applications 2.4 – Linear Inequalities Copyright © 2010 by Ron Wallace,
Discrete Manufacturing SIG Cost Sub-Committee
NTS Entry Charging Review Update
DEC/DEP ATC Methodology Consolidation
Every number has its place!
Presentation transcript:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercially Similar Taskforce Report Taskforce Update January 15, 2013

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 1.The reservation capacity released by the defender or group of defenders should provide roughly equal or greater reservation capacity to the challenger. AND 2.Competition should be limited to commercially similar paths (similar flowgate impacts). 3.These principles will apply or behave the same for Mod 28, Mod 29, and Mod 30 systems. 4.These same principles will apply to Defenders of both PTP and NT Challengers. Principles to be Strived For

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 Commercially Equivalent Paths

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 4 Commercially Equivalent Paths

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 5 Commercially Equivalent Paths Test 1 - A valid commercially similar defender must have 67% of the significantly impacted FGs of the Challenger.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 Commercially Equivalent Paths Test 2 - A valid commercially similar defender must have 67% of the constrained FGs of the Challenger impacted by applying the 90% rule. 90% Rule - To relieve a constrained flowgate or path, a Defenders TDF must be at least 90 % of the Challengers TDF. For MOD 028 and MOD 029, the TDFs are assumed to be either 0 or 1. For example, if the challenger TDF on a constrained element is 0.15, the defender must have an impact on the same constrained element with a TDF of or greater.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 Commercially Equivalent Paths If Test 1 and Test 2 are both true, it passes the equivalency test. Identify the largest recall percentage required from the flowgates that passed the 90% rule. Compute credits to all flowgates based upon that recall amount.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 8 Commercially Equivalent Paths Discussion Is the concept OK? 67% OK for Test 1 and Test 2? 90% Rule OK? Do we eliminate individual Defenders only, or do we total all defenders who pass and apply 90% rule to the total as well? The actual system impact of the 100 MW defenders ranged from 38 MW to 167 MW. Do we care? Next Meetings January 29 th, 9:00 – 12:00 Central Time February 8 th, 9:00 – 12:00 Central Time