A CPS1-driven market for Clearing/Settling Inadvertent Interchange Simulation from an 11-Day period of 17-control-area Western-Interconnection Jan/02 hourly.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

1 A B C
Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Introduction to Graphing The Rectangular Coordinate System Scatterplots.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
5.1 Rules for Exponents Review of Bases and Exponents Zero Exponents
AP STUDY SESSION 2.
1
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
EE, NCKU Tien-Hao Chang (Darby Chang)
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
PP Test Review Sections 6-1 to 6-6
MCQ Chapter 07.
1 2 Teeth and Function 3 Tooth structure 4 Dental Problems.
Regression with Panel Data
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Biology 2 Plant Kingdom Identification Test Review.
Chapter 1: Expressions, Equations, & Inequalities
2.5 Using Linear Models   Month Temp º F 70 º F 75 º F 78 º F.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
Before Between After.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
12 October, 2014 St Joseph's College ADVANCED HIGHER REVISION 1 ADVANCED HIGHER MATHS REVISION AND FORMULAE UNIT 2.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Static Equilibrium; Elasticity and Fracture
FIGURE 12-1 Op-amp symbols and packages.
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
9. Two Functions of Two Random Variables
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Meat Identification Quiz
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
A CPS1-Driven Market for the Frequency Control Contribution of Inadvertent Interchange presented to Inadvertent Interchange Payback Taskforce North American.
Don’t Overemphasize Spot at the Expense of Forward and Real Time (Macro & Micro) Federal Energy Regulatory Commission February 26, 2002 Robert Blohm Investment.
Presentation transcript:

A CPS1-driven market for Clearing/Settling Inadvertent Interchange Simulation from an 11-Day period of 17-control-area Western-Interconnection Jan/02 hourly data presented to Inadvertent Interchange Payback Taskforce North American Energy Standards Board by Robert Blohm Houston December 10, 2003 Slide #

Inadvertent Interchange is more than just energy at the price of scheduled energy. Its also unscheduled contribution or correction to frequency error. 1

energy transmission loading component frequency control contribution Inadvertent is a vector in a state space 2

Dual pricing of unscheduled energy Ambiguity along the diagonal. Diagonal occurs only when frequency is high. Off-diagonals occur only when frequency is low. Revenue/Expense Unscheduled part 0 good bad receive energy part 0 U sold pUp e pUp e pay bought pUp e pUp e 3

Four possible combinations of Priced Energy Component and Priced Frequency Control Contribution of Inadvertent Interchange 4

Case 1: Frequency High and Control Area A Leaning on Rest of Interconnection for 200 MWh A pays the Interconnection $10/MWh energy price for 200 MWh = -$ 2000 A receives from the Interconnection $15* of FCC p per MWh of Inadvertent = +$ 3000 for 200 MWh of Inadvertent Interchange that is opposite to the frequency error. *FCC p per MWh would be less than $15 if the average frequency error were smaller. A receives from the Interconnection a net total of $ 1000*. *The net result could be a payment if the average frequency error is small enough. 2. Frequency Control Contribution: 3. Net Result: 1. Energy Component: 5

Case 2: Frequency High and Rest of Interconnection Leaning on Control Area A for 200 MWh A receives from the Interconnection $10/MWh energy price for 200 MWh = +$ 2000 A pays the Interconnection $15* of FCC p per MWh of Inadvertent = -$ 3000 for 200 MWh of Inadvertent Interchange that is contributing to the frequency error. *FCC p per MWh would be less than $15 if the average frequency error were smaller. A pays the Interconnection a net total of $ 1000*. *The net result could be a receipt if the average frequency error is small enough. 2. Frequency Control Contribution: 3. Net Result: 1. Energy Component: 6

Case 3: Frequency Low and Control Area A Leaning on Rest of Interconnection for 200 MWh A pays the Interconnection $20/MWh energy price for 200 MWh = -$ 4000 A pays the Interconnection $15 of FCC p per MWh of Inadvertent = -$ 3000 for 200 MWh of Inadvertent Interchange that is contributing to the frequency error. A pays the Interconnection a combined total of -$ Frequency Control Contribution: 3. Net Result: 1. Energy Component: 7

Case 4: Frequency Low and Rest of Interconnection Leaning on Control Area A for 200 MWh A receives from the Interconnection $20/MWh energy price for 200 MWh = +$ 4000 A receives from the Interconnection $15 of FCC p per MWh of Inadvertent = +$ 3000 for 200 MWh of Inadvertent Interchange that is opposite to the frequency error. A receives from the Interconnection a combined total of +$ Frequency Control Contribution: 3. Net Result: 1. Energy Component: 8

Case 1 A receives $1000 Case 2 A pays $1000 Case 3 A pays $7000 HighLowFrequency: Leaning by: Control Area A Rest of Interconnection Summary of the 4 cases Case 4 A receives $7000 9

Animation of the Clearing/Settlement of Frequency Control Contribution based on data of an 11-day period in January 2002 on 17 control-area Western Interconnection : 10

11

i I F 2 1 F 4 1 F 4 1t t 4 9 I 4 1 I 4 1t t,ii 2 9 F I i Slope is "2-dimensional average" ofInadvertent &Frequency-error Average Frequency-error i's Average Inadvertent A Balancing Authority i's Frequency Control Contribution is a "2-dimensional average" of Inadvertent and Frequency-error each weighted by Frequency error. A "2-dimensional average" is the slope of aline from theorigin through the intersection of thelines intercepting the two averages. 4-period scatter of Balancing Authority i's points denoted by the 4 red dots t,it I,F Drawing prepared by Robert Blohm July 5, 2003 t F t,i I Period t Sum = I t,i F t

i I F 8 -4 ¼ F I i,t A Balancing Authority i's Frequency Control Contribution is a "2-dimensional average" of Inadvertent and Frequency-error each weighted by Frequency error. A "2-dimensional average" is the slope of aline from theorigin through the intersection of thelines intercepting the two averages. 4-period scatter of Balancing Authority i's points denoted by the 4 red dots t,it I,F I 4 1 I 4 1t t,ii i's Average Inadvertent weighted by Frequency-error ( F t ) I i F t,t -4 ¼ t F t,i I Period t Sum = I i F t,t 8 F t 2 1 Average Frequency-error weighted by Frequency-error ) F F 4 1 F 4 1t t t 2 F t ( 8 t 2 F t Slope is "2-dimensional average" ofInadvertent &Frequency-error weighted by Frequency-error

Megawatt-Hours of Inadvertent Frequency error in Hertz Bad quadrant: Inadvertent and frequency error in the same direction. Bad quadrant: Inadvertent and frequency error in the same direction. Good quadrant: Inadvertent and frequency error in opposite directions. Good quadrant: Inadvertent and frequency error in opposite directions. Bad quadrant: Inadvertent and frequency error in the same direction. Bad quadrant: Inadvertent and frequency error in the same direction. 14

Line is in the good quadrants: so red control area gets paid for his Frequency Control Contribution for helping frequency. Slope of line is red control areas Frequency Control Contribution. It is the two-dimensional average of red control areas frequency-error-weighted Inadvertent and frequency-error- weighted frequency error. 15 Red control areas 264 hourly-average Inadvertent and frequency error Control Area 1 (CA 1)

16 CA 2

Slope of the black line is two- dimensional average of the combined control areas frequency-error-weighted Inadvertent and frequency-error- weighted frequency error. 17

18 CA 3

19

CA 4 20

21

22 CA 5

23

24 CA 6

25

26 CA 7

27

28 CA 8

29

CA 9 30

31

32 CA 10

33

CA 11 34

35

36 CA 12

37

38 CA 13

39

CA 14 40

41

42 CA 15

43

44 CA 16

45

46 CA 17

47

48

Lines slopes add up to zero slope of horizontal line. 49

Positive slopes pay Bad quadrant: Inadvertent and frequency error in the same direction. Bad quadrant: Inadvertent and frequency error in the same direction. 50

Good quadrant: Inadvertent and frequency error in opposite directions. Good quadrant: Inadvertent and frequency error in opposite directions. Positive slopes pay to the negative slopes 51

Positive slopes pay to the negative slopes and Frequency Control Contribution always clears. 52

Real-time transactions cannot be done moment-by- moment deterministically/deliberately –Time is too short Real time performance must be managed, measured and valued as a statistical distribution –Classical physics versus quantum mechanics joint-indeterminacy of position and momentum –Joint-indeterminacy of time-quantity and reliability- pricing reliability pricing of a time average Market price of a distribution of points over time, not of a sharp point in time Computational Equivalence (Wolfram/Mathematica): computational limitations in humans & physical nature 53

Tiered real-time market Three tiered market for frequency contribution –NERC, Balancing Authorities, local entities. Frequency is a public good requiring an authority like NERC to drive the frequency-contribution markets by the threat of penalty. –This meets both a reliability and a markets objective Balancing Authorities must settle their FCC monthly –Since inadvertents sum to zero by definition, Balancing Authorities always clear 54

Balancing Authorities must also comply with CPS frequency targeting, acting as agents subject to NERC penalty –FCC does not target frequency –NERC CPS penalty will prompt Balancing Authorities to trade their CPS rights instead of paying the penalty, the way DOE pollution penalties prompted the market for pollution rights. To meet their monthly CPS scores, Balancing Authorities will trade their frequency control contributions as an alternative to buying options on frequency support Tiered real-time market (cont.d) 55

FCC is open and scalable to a market below Balancing Authorities –Balancing Authorities can apply FCC to their constituent entities to incent entities self-provision and good performance, thereby minimizing the Balancing Authoritys own local intervention Tiered real-time market (cont.d) 56

Ancillary services markets Ancillary services markets need to be developed as robust options markets –The option price is driven by volatility which is another way to capture/express Frequency Control Contribution 57

Relation between CPS1 and Frequency Control Contribution 58

extends to all inadvertent the price of the trading & procurement of residual inadvertent done to get compliant with. The tolerance band limits and drives. 59

boils down to where is a least-squares estimator of bias 60

With bias, tolerance band and becomes 61

monetization is equivalent to without bias obligation/tolerance:. monetization makes this equation hold because since and 62

Trading/procurement of to get within the tolerance band drives the price of all 63

64

CPS Vertical cutHorizontal band Isoquants : buys FCC or response : buys regulation Isoquants s cut is perpendicular to CPS1's cut/band. Payments for traded s would sum to zero around CPS1's cut/band when. There is excess demand for traded s outside CPS1's cut/band when whence receipt of reduces CPS1 penalty to incent BAs to get back inside. 's vertical cut gets stretched right from the middle into CPS1's horizontal band. BA outside his CPS1 cut/band buys enough from BAs & to get inside his CPS1 cut/band & avoid CPS1 penalty, and thereby helps set the settlement price. 65

To Get Hourly Decomposition of Frequency Control Contribution: Interpret Frequency Control Contribution as an 11-day average of 1-hour Frequency Control Contributions 66

FCC h (11 day* average): *264 hours FCC h (hour 1): (Column K of spreadsheet) 67

1-hour FCC h sum to 0 across control areas i since because I i sum to 0 across the is. || 68

Because 1-hour FCC h sum to 0 across the control areas i, || the 264-hour averages of 1-hour FCC h sum to 0 across the is. 69

Marginal FCC Cost of Inadvertent as Amount of Frequency Control Contribution per MWh of Inadvertent 70

FCC h (hour 1): Marginal FCC cost (in units of FCC 1 ) of Inadvertent I i : (Column F of spreadsheet) 71

To avoid economic gaming a continuous Frequency Control Contribution value of Inadvertent Interchange is needed because the hourly Frequency Control Contribution of Inadvertent Interchange is often very big relative to the Energy Component of Inadvertent Interchange. 72

Inadvertent Payments by/to (Green) Control Area 3 Assuming price of 10¢/MWh/Hz of FCC For Energy +For FCC = =FCC t ¢/MWh/Hz Day 1: Hour 4 Day 6: Hour 2 Day 1: Hour 11 Day 6: Hour 12 Receive $5.06/MWh =FCC 4 MC I 3 Pay $11.95/MWh =FCC 12 MC I 3 Receive $17.21/MWh =FCC 146 MC I 3 Pay $14.60/MWh =FCC 156 MC I 3 11-day Average $2.06/MWh Net Receive $469 Receive $3592 Pay $974 Pay $4197 (Row 277 Column X of spreadsheet) Pay Receive Pay 73