NAESB UPDATE MEETING MAY 30, 2008 DSM EE RETAIL GROUP.

Slides:



Advertisements
Similar presentations
Demand Response Forecasting, Measurement & Verification Methods/Challenges/Considerations National Town Meeting on Demand Response Washington, DC - June.
Advertisements

SmartPOWER Critical Peak Pricing (CPP) June 3, 2008.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Can Today's Demand Response Programs Support Integration of Renewable Energy.
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
National Town Meeting on Demand Response Focus on Pepcos Washington, DC Residential Smart Meter Pilot Program Presented By Steve Sunderhauf July 14, 2009.
ISO New England Demand Resource Measurement & Verification Standards Manual Overview April 11, 2007 NAESB Development of DSM/EE Business Practices Washington,
Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
© 2004 Dominion Dominion Proposal January 24, 2005.
Parallel Flow Visualization/Mitigation Proposal
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 30, 2009 Eric Winkler, Ph.D. Project.
NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
National Town Meeting on Demand Response Session A – Estimate It, Measure It, Verify It Demand Response Coordinating Committee (DRCC) Renaissance Washington.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
July 14, 2009 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Review with the Demand Response Coordinating.
Conducting monitoring and evaluation FACTSHEET 13 Food and Garden Organics Best Practice Collection Manual.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.
1 Measuring What Matters – Looking ahead, what data must we have to succeed? NEET Workgroup #1 Report Co-Chairs: Massoud Jourabch and Mary Smith Executive.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Midterm Review Evaluation & Research Concepts Proposals & Research Design Measurement Sampling Survey methods.
Overview – Non-coincident Peak Demand
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
Copyright © 2007 Pearson Education Canada 3-1 Marketing Research Marketing research serves many roles. It can: 1.Link companies with customers via information.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
© 2012 CenterPoint Energy Proprietary and Confidential Information 2013 SWEDE Conference Utilizing AMI Richard Grasshoff Director Advanced Meter System.
1 Northwest Energy Efficiency Taskforce Workgroup # 1 Measuring What Matters Looking ahead, what data must we have to succeed?
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Demand Response. What is Demand Response? In an electricity grid, electricity consumption and production must balance at all times Demand response in.
June 22 and 23,  The information and/or flow processes contained in this Power Point presentation: ◦ Were created to allow interested parties to.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
March 1, 2011 Load Analysis Update Calvin Opheim Manager, Load Forecasting and Analysis.
Customer Preferences for Metering and Connectivity Metering Americas 2004 San Diego, CA March 24-26, 2004 Lynn Fryer Stein Primen.
SOFTWARE PROJECT MANAGEMENT
March 2003 Focused Workshop on the Informal Draft Revised Disposal Reporting System Regulations Session #2: Transfer Station Issues.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
Load Participation in Real-Time Market: LMP Minus G.
Retail Metering Working Group Progress Report 04/15/09.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
20% 80% Pareto Analysis.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
NAESB Conference Call October 10, 2008 DSM EE RETAIL GROUP.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Utility Benefits of Demand Response Trevor Lauer DTE Energy Marketing Executive Conference Coeur d’Alene, Idaho.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
PWG Long Term Strategy How do we maximize scarce resources?
ELECTRICITIES – INTRO TO AMI Brad Kusant – Area Manager 8/19/2014.
DSM/EE Scoping Taskforce Update August 18, 2009 DRAFT.
1 City of Palo Alto Utilities Large Commercial Customer Pilot Demand Response Program Customer Meeting March 8, 2012.
Advanced Meter School August 18-20,2015 Time of Use and Load Profile Jeremiah Swann.
Direct Participation Enrollment Process for 2017 DRAM
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 14, 2009 Eric Winkler, Ph.D. Project.
Emergency Response Service Baselines
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Peak Day Pricing Module 2:Eligibility & Default
Bulk Fuel,Gasoline and Diesel Event User Guide
Illustrative EE/DSM/DR Planning Process
Eric Winkler, Ph.D., ISO-New England Donna Pratt, New York ISO
RES 500 Academic Writing and Research Skills
Presentation transcript:

NAESB UPDATE MEETING MAY 30, 2008 DSM EE RETAIL GROUP

Project Objective Verify load reductions that are expected from Demand response Programs Be able to state the confidence level of load reductions for Demand Response Programs

Matrix Status 11 demand response programs 5 utility submitters Revise headings with new M&V characteristics Target more submitters for better geographical coverage ( i.e. RTO regions, NERC regions) Evaluate program diversity

Data Collection Develop list of additional submitters Review RTO and NERC territory maps Phone interviews to collect additional examples Focus on existing programs and existing M&V processes Ask submitters to provide info on all of their applicable programs

M&V Characteristics –Sample Accuracy: For M&V where sampled data is used to verify load reductions, what is the confidence level of the sampled load study? ( i.e. +/- 10% with 90 % confidence) –Sample Size: What sample size is required to achieve the target confidence level (i.e. 200 in control group, 200 in non-control group, blind study – participants are not informed about when control actions occur) –Frequency of Data Collection: How often is load reduction data sampled (i.e. 5 minute intervals with daily downloads) –Communication Protocol: How is load reduction data collected (i.e. telemeter – real time data collection) –Notification Testing: How is the customer notified of a curtailment event and how is the communication protocol tested. (i.e. ping the control device at the customer premise and verify its receipt)

M&V Characteristics –Demographics: Do customer demographics pay a roll in M&V - undecided – (i.e. Residential, Commercial, Industrial, Governmental, size) –Meter Accuracy: What are the meter accuracy requirements (i.e. clock time interval) –VEE (Validation/Editing/Estimation): How is data evaluation performed (i.e. validation of data, methodology for editing erroneous data, estimation techniques for missing data) – Market: What is the target market (i.e.. mass market usually has a standard watt hour revenue meter vs. large commercial/industrial market that may have a interval data recorder) –Baseline Method: How is the amount of load drop determined (i.e. the method to determine the customer baseline before a curtailment event)

Discussion Points Will not concentrate on cost benefit issues surrounding DR programs. AMI has the potential to significantly affect DR programs and M&V but is not expected to be part of initial standards. Will focus first on dispatchable programs, however, data will be collected on all DR programs. Will stay closely linked with the RTO effort as many utility retail programs feed into the RTOs

Next Steps Refine the matrix with more specific headings based on M&V characteristics (Rae McQuade) A conference call will be set up to review the refine the matrix (Rip Newcomb) Current data will be entered into the matrix (Rae McQuade, Rip Newcomb, Neal Allen, Submitters) Amend the work plan to reflect the new assignments (Rae McQuade/Rip Newcomb) Review matrix coverage in the United States and contact additional utilities (Rae McQuade, Neal Allen, Rip Newcomb) Continue calls to further populate the matrix (Rae McQuade, Neal Allen, Rip Newcomb) Mary Edwards and Phil Precht will begin to draft a format for the retail standard