W. Weathers1A Conference Call 8/18/05 Examples: In all cases a Parent Reservation to be Redirected must be Firm Point-to-Point. Unless noted otherwise,

Slides:



Advertisements
Similar presentations
Series: Composition:30% polyester 70% PVC Roll Length:25~35 Standard Width:2m 2.5m 3m Openness Factor:3% Abrasion Resistance:>1000(ASTM.
Advertisements

North American Energy Standards Board (NAESB) Procedures (Note : Titles of Swim lanes change periodically) NAESB Office Triage Subcommittee Executive Subcommittee.
W. WeathersModeled after Redirect Examples Examples: Reservations that are dotted show Capacity Available to Resell or Transfer. MWs in Gray are.
11 OASIS Subcommittee - Notification Task Force UPDATE May
DRAFT Recommendation Preemption & Competition CHALLENGER COUNTEROFFER June 25, 2013 NAESB OS.
1 Defender Mitigation Proposed Name Change: Defender Reservation True-up Jan 15, 2012 NAESB OASIS Subcommittee Progress Report.
OASIS Subcommittee Status Preemption and Competition EC Meeting 4/30/13.
E-Tag 1.8 An industry tutorial.
Business Practices Subcommittee Update August 17, 2010.
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Preemption and Competition Redirect Issues NAESB OS Meeting June 6, 2012 BPA Presenting.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
North American Energy Standards Board (NAESB) Procedures (Note : Titles of Swim lanes change periodically) NAESB Office Triage Subcommittee Executive Subcommittee.
E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
Timing and Flowchart Assignment
Standards Review Subcommittee Update October 22, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Timing Considerations for Short-term Preemption and Competition Automation NAESB OS Presentation.
NAESB OASIS 1A Subcommittee Wendy Weathers, Chair ESS Meeting May 2005 Resale Recommendation.
Development of Model Business Practices Process Flows (Note : Titles of Swim lanes change periodically) NAESB Office Triage Subcommittee Executive Subcommittee.
Can you explain the ideas
FERC Order minute Scheduling.
25-Aug-14Created by Mr. Lafferty Multiples and LCM Factors and HCF Types of Numbers Prime numbers Prime Decomposition.
NAESB OASIS Subcommittee Long Term Competition Mike Norris, Rebecca Berdahl May 13, /13/141.
Standards Development Improvement Opportunities February 18, 2014.
DRAFT E-Tag Notification Presentation NAESB OS Mar 26-28, 2013 Seattle, WA.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Treatment of Firm Redirects Recent FERC Order. Entergy Order Docket Nos. ER OA ER Issued May 16, 2013
Pseudo-Tie Reservations
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
Resale Business Practice Standards 3 Options remain.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Resale Business Practice Standards 3 Options remain.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
OASIS SUBCOMMITTEE STATUS EC Meeting 4/29/14. Preemption and Competition Annual Plan Items Affected  2013 AP Item 2(a) Develop version 2 business practice.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS Presentation August 20, 2014 BPA Presenting.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
Consolidation (API 5.d R09015) Business Practice Standards Draft WEQ OS Marie Pompel – July 2015.
NAESB WEQ EC Meeting 10/20/2015.   Workload  Long-Term Competition for Rollover Rights OASIS Subcommittee.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
NAESB Update Kathy Anderson October 2015 MIC Meeting.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Standards Review Subcommittee Update August 19, 2014 Co-Chairs Rebecca Berdahl, BPA Marie Knox, MISO.
NITS on webSmart OASIS. NITS on webSmart OASIS Agenda  Company and User Permissions  Electronic Industry Registry requirement  WebSmart OASIS NITS.
Preemption-ROFR Notification
Duke Energy Carolinas Quarterly Stakeholder Meeting
WEQ OASIS Subcommittee
BPA Formal Comments Overview to NAESB OS
Duke Energy Carolinas Quarterly Stakeholder Meeting
Duke Energy Carolinas Quarterly Stakeholder Meeting
Recommended Appendix B Redirect Standards Examples
WEQ OASIS Subcommittee Development Update to the
Preemption & Competition Standards BPA – Southern Compromise Proposal October 24, 2017 PURPOSE: Review and discuss the inequity with the Short-Term Firm.
Assigned to the WEQ OASIS and BPS Subcommittees
Use of the term “Confirm” and derivatives in NAESB Business Standards
Duke Energy Carolinas Quarterly Stakeholder Meeting
Short-term Competition and Preemption (STCP)
Interchange Scheduling and Accounting Subcommittee Meeting
2019 Annual Plan Items 3b and 3f (formerly 2018 API 3c and 3h)
NITS on webSmart OASIS.
Kathy Anderson October 2015 MIC Meeting
OASIS Subcommittee Status Preemption and Competition
OASIS Notification Recommendation.
Standards Review Subcommittee Update
Presentation transcript:

W. Weathers1A Conference Call 8/18/05 Examples: In all cases a Parent Reservation to be Redirected must be Firm Point-to-Point. Unless noted otherwise, example Redirect requests may be on either a firm or non-firm basis. Reservations that are shaded show Capacity Available to Redirect. MWs in Gray are no longer available to Redirect. Requests that are cross-hatched are outside the bounds of the Parent Reservation. R05002 Redirect Examples Appendix

W. Weathers1A Conference Call 8/18/05 Example 1 – Capacity Available to Redirect against Parent ARef# 1000 would be 60 MW for Day one and 30 MW for Day two. See Standards 9.4, 9.5, 10.4 and 10.5 and definition of Capacity Available to Redirect. Day 1Day 2 Day 3 Day 4 60 MW - 30 MW MW - Confirmed Resale ARef# 1001 Confirmed Redirect ARef# 1002 Pending Redirect ARef# 1004 Confirmed Redirect ARef#1003 Pending Tag ID# 101 Implemented Tag ID# 100 Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 1000 RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10 Example 1: Parent Reservation Example 1: Capacity Available to Redirect on Parent Reservation (shaded area) after Various events

W. Weathers1A Conference Call 8/18/05 Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 2000 Outage Example 2 – The Capacity Available to Redirect is unaffected by the outage. The Capacity Available to Redirect against Parent ARef# 2000 would be 100 MWs for all four days. See Standards 9.2 and Example 2: Capacity Available to Redirect on Parent Reservation Not Affected by Outage RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10

W. Weathers1A Conference Call 8/18/05 Example 3 – The TP must deny Request 3001 because the time period is invalid (i.e. extends past the time period of the Parent Reservation). The Capacity Available to Redirect on the Parent Reservation remains at 100 MW for the duration of the reservation. See Standards 9.3, 9.4.1, 10.3 and Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 3000 Invalid Redirect ARef# 3001 Example 3: Redirect Request with Invalid Time Period RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10

W. Weathers1A Conference Call 8/18/05 Example 4 – With a Non-Firm Redirect Request where the capacity requested exceeds the Capacity Available to Redirect of the Parent, if ATC is available, the TP may Counteroffer ARef# 4001 at 100 MW (See Example 4a) or deny ARef# 4001 (See Example 4b). In 4a, assuming the customer confirmed the Counteroffer, the Capacity Available to Redirect on Parent Reservation ARef# 4000 would be 100 MW for the first two days and zero for days 3 and 4. See Standards 10.2, 10.3, 10.4, , and Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 4000 Non-Firm Redirect Request ARef# 4001 Example 4: Non-Firm Redirect with Capacity Requested exceeding Capacity Available to Redirect on Parent Reservation. Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 4000 Non-Firm Redirect ARef# 4001 Counteroffered and Confirmed at 100 MW Example 4a: Non-Firm Redirect with Optional Counteroffer. RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10

W. Weathers1A Conference Call 8/18/05 Example 4b – In this scenario, the TP denied the Non-Firm Redirect ARef# The Capacity Available to Redirect on Parent Reservation ARef# 4000 remains 100 MW for all four days. The TP could also Counteroffer Request 4001 at 100 MW (See Example 4a). See Standards 10.3, and Day 1Day 2 Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 4000 Denied Non-Firm Redirect ARef# 4001 Example 4b: Non-Firm Redirect with Optional Deny. RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10

W. Weathers1A Conference Call 8/18/05 Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 5000 Firm Redirect ARef# 5001 Counteroffered and Confirmed at 100 MW Example 5 - With a Firm Redirect Request where the capacity requested exceeds the Capacity Available to Redirect of the Parent, assuming ATC is available, the TP must Counteroffer ARef# 5001 at 100 MW. Assuming also that the customer confirmed the Counteroffer, the Capacity Available to Redirect on Parent Reservation ARef# 5000 would be 100 MW for the first two days and zero for days 3 and 4. See Standards 9.3 and Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent ARef# 5000 Firm Redirect Request ARef# 5001 Example 5: Firm Redirect with Counteroffer Example 5: Firm Redirect with Capacity Requested exceeding Capacity Available to Redirect on Parent Reservation. RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10

W. Weathers1A Conference Call 8/18/05 Confirmed Firm Parent Reservation 5000 Example 7 – The Customer may have multiple requests for Firm or Non-Firm Redirects pending against the same Capacity Available to Redirect. Once Request 7001 is Confirmed, Non-Firm ARef# 7002 may be Refused by the TP or Withdrawn by the Customer. The Capacity Available to Redirect is 40 MW for days 1 and 2. (The TP could also Counteroffer non-firm ARef# This scenario is not shown). See Standards , , 10.5 and Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Confirmed Firm Parent Reservation ARef# 7000 Accepted Non-Firm Redirect ARef# 7001 Accepted Non-Firm Redirect ARef# 7002 Day 1Day 2 Day 3 Day 4 60 MW - 20 MW MW - Confirmed Non-Firm Redirect ARef# 7001 Withdrawn Non-Firm Redirect ARef# 7002 Confirmed Firm Parent Reservation ARef# 7000 RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10

W. Weathers1A Conference Call 8/18/05 Day 1Day 2Day 3Day 4 60 MW - 20 MW MW - Accepted Firm Parent ARef# 8000 Example 8 – The Customer may only Redirect against capacity of a reservation that is in a Confirmed State. ARef# 8001 would be Refused and the Capacity Available to Redirect against Parent ARef# 8000 would be zero MWs for all four days because the reservation is not Confirmed. See Standards and Refused Redirect ARef# 8001 RECOMMENDATION TO NAESB WEQ EXECUTIVE COMMITTEE Requesters:Electronic Scheduling Subcommittee and Information Technology Subcommittee Request No.:R05002 Request Title:Revision of Redirect Standards 9 and 10