County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

County of Fairfax, Virginia Department of Transportation Fairfax County Transportation Funding and Roadway Service Delivery Study Study Update – Transportation.
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
County of Fairfax, Virginia Alternatives for Improving Roadway Services in Fairfax County Board Transportation Committee Meeting March 1, 2011 Department.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
County of Fairfax, Virginia Department of Transportation R esidential T raffic A dministration P rogram Traffic Calming Program Status July 20, 2010.
Prince William County Government Prince William County Department of Transportation Road Program DATA June 23, 2010.
County of Fairfax, Virginia Transportation Advisory Commission 1 Department of Transportation Fairfax County Transportation Advisory Committee Jeff Parnes.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Tysons 1 Tysons Corner Interim Metro Parking December 20, 2011.
1 RESIDENTIAL PARKING - COMMERCIAL / LARGE VEHICLE PROBLEMS March 2009.
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
PHOTOSafe Newport News
Port Authority Update March 15, 2012 Ryan Wolfe Director of Campus Services.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
HS-8 Traffic Calming / Control Committee Draft Plan February 29, 2012 Belmont Ridge Middle School 1.
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
FUTURE OF PARKING IN VENICE BEACH Venice Neighborhood Council Meeting January 22, 2013.
DESCRIPTIONDESCRIPTION PROCEDURESPROCEDURES CUT- THROUGH RESTRICTION TRAFFIC- CALMING $200 FINE FOR SPEEDING SIGNS MULTI-WAY STOP (“MWS”) SIGNS THROUGH.
THE 2012 FINANCIALLY CONSTRAINED LONG-RANGE TRANSPORTATION PLAN (CLRP) AND THE FY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Transportation Planning.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
MICHIGAN DEPARTMENT OF TRANSPORTATION Davison TSC
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
PUBLIC HEARING: Development (Impact) Fees - Land Use Assumptions & Infrastructure Improvement Plan Reports June 30, 2014.
Guidelines for Traffic Control at Surface Mines
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Old Policy – which no one ever seem to have heard of.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Kern Motorist Aid Authority Services And Operations.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
ROAD ADOPTION PROCESS TOPIC GROUP OVERVIEW OF HCC ROAD ADOPTION PROCESS DAVID HUMBY 24 TH & 25 TH FEBRUARY 2010.
Regional Priority Bus Transit Conference June 24, 2009.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
County of Fairfax, Virginia Department of Transportation Potential Fairfax County Photo Red Light Program Board Transportation Committee December 10, 2013.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Roadway Median Tree Program Public Works Department July 13, 2015.
Criteria for Secondary to Primary System Transfers Robert W. Hofrichter Assistant Administrator Transportation and Mobility Planning Division.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Edward L. Fischer P.E..  Ed, it was hard to read slides from back of room with this background.  Can I change it? Nancy Brickman.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
Prospective Rural Additions Meeting JULY 15, 2015.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Alternatives for Improving Roadway Services
Board Transportation Committee May 6, 2014
Rural Transit Stop Design Guidelines Prof Omer maaitah
Presentation transcript:

County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting the Fairfax County Parkway and Franconia / Springfield Parkway from a Secondary Road to Primary Road 9/20/11

County of Fairfax, Virginia Updates on Alternatives for Improving Roadway Services in Fairfax County

County of Fairfax, Virginia Alternatives for Improving Roadway Services Thru Truck Studies on Secondary Roads No Parking Requests Advanced Street Name Signs Bus Shelters Traffic Signal Construction Funding Mowing

County of Fairfax, Virginia Thru Truck Studies on Secondary Roads Approximately six requests processed a year. Current process time up to one year Process requires Fairfax County to conduct a public hearing and VDOT to either conduct a public hearing or collect public comments Would require a Code Change for Fairfax County to take responsibility for the process VDOT recommends a phased / interim approach before supporting a Code Change

County of Fairfax, Virginia Thru Truck Studies on Secondary Roads – Process Timelines Existing Process – 52 ½ weeks Interim Process – 27 weeks Full County Responsibility after Code Change – 17 weeks

County of Fairfax, Virginia Thru Truck StudiesThru Truck Studies on Secondary Roads Advantages Reduced process time from 12 + months to 4 to 5 months Stream line process would only require one public hearing / public comment period Local jurisdiction adopts restriction by resolution Consequences Requires additional manpower resources – 0.15 FTE Requires funding for studies and associated traffic signs - $40,000 Requires VA Code Change for County responsibility of program

County of Fairfax, Virginia Staff Recommendations FCDOT should assume a phased in / interim approach for the responsibility of conducting the necessary evaluation / study for restricting through trucks on the secondary system. Once VDOTs interim conditions are satisfied, County should pursue General Assembly action to shift authority for approving through truck restrictions on the secondary system to the County.

County of Fairfax, Virginia No Parking Requests Existing No Parking programs include FCDOT residential permit parking and community parking district programs VDOT reviews 350 requests per year. VDOTs program concentrates on restrictive zones for safety and capacity. Approximately 20% of requests result in the installation of No Parking signs. Once initiated, VDOT review time per request averages four hours Total VDOT processing time varies depending on backlog of requests

County of Fairfax, Virginia No Parking Requests Advantages Eliminates confusion by the public on who establishes the different No Parking programs Places all parking programs under one jurisdictions responsibility Better coordination with enforcement agency

County of Fairfax, Virginia No Parking Requests Consequences Requires additional manpower resources – 1 FTE Requires additional funding resources for signs - $10,000 Requires that the Board conduct a public hearing and adopt a resolution prior to placing restrictions – resulting in extended process timeline – a resolution is not required for VDOT process No time savings in overall process Fairfax County would have to follow adopted standards and guidelines for the establishment of No Parking restrictions

County of Fairfax, Virginia Staff Recommendation Existing No Parking Programs remain in place. Current Code of Virginia allows for the County to regulate parking on the secondary system after an public hearing and Board resolution. Because of public hearing requirement and current VDOT backlog, unlikely that the County could improve upon current VDOT processing time.

County of Fairfax, Virginia Advanced Street Name Sign Program VDOT has in place an advanced street name signing program for selected intersections with traffic signals Field observations concluded that there is some inconsistency in the application of VDOTs program VDOT does not provide advance street name signs for streets with significant amounts of cross street traffic that are un-signalized Program guidelines need to be developed if the County assumes this program

County of Fairfax, Virginia Advanced Street Name Sign Program Advantages Provides a benefit to those motorists who are unfamiliar with the area and street system Improves traffic safety by allowing drivers to plan which turn lane to get into prior to approaching the intersection thus avoiding last minute lane changing Consequences Requires additional manpower resources -.61 FTE Requires funding for installation of the associated traffic signs - $100,000

County of Fairfax, Virginia Staff Recommendation The County assume responsibility for development of this program, and the installation of new guide signs should funding become available. Agreement with VDOT, noting that VDOT would be responsible for the maintenance of the signs once they are installed.

County of Fairfax, Virginia Traffic Signal Construction C & I funding could be used to fund the construction of new or the modification of existing traffic signals As of 9/1/2011 – VDOT has indicated that there are no approved traffic signals in their queue Signal installation largely dependent upon availability of right- of-way for signal equipment. County assumption of this activity would not eliminate this requirement No time savings for the County to assume study, design and construction of traffic signals.

County of Fairfax, Virginia Bus Shelters Fairfax County recently entered into an agreement with an advertisement agency, that allows for advertisements on bus shelters. The advertisement agency is responsible for the maintenance and construction of all bus shelters in Fairfax County at no cost to the County. A memo of understanding with VDOT and WMATA to be executed which will allow the advertisement agency to advertise on VDOT and WMATA shelters and allow for the advertisement agency to maintain and fund new bus shelter installations.

County of Fairfax, Virginia Staff Recommendation Pursue the MOU between Fairfax County, VDOT, WMATA and the advertisement agency, that allows for advertisements on bus shelters with the advertisement agency responsible for maintenance and installation of future shelters at no cost to Fairfax County

County of Fairfax, Virginia Mowing Most VDOT Primary and Secondary mowing done by contractors. Interstate mowing excluded Current Contract: 3 mowing cycles / season (May – July – Sept. / Oct.) Approx. 30 days required for complete cycle Includes litter removal Approx. $160,000 - $200,000 per cycle Excludes P-R lots, VDOT maintenance yards, miscellaneous ad- hoc mowing by state forces 2012 is 3rd year of 3-year contract Additional cycle(s) could be added relatively easily. Need contractor agreement

County of Fairfax, Virginia Advantages Improved appearance of Primary and Secondary roadsides Potential improvement in sight distances / safety etc. Consequences Requires approx. $160,000 - $200,000 per mowing cycle Mowing

County of Fairfax, Virginia Summary of Manpower and Funding Needs

County of Fairfax, Virginia Questions

County of Fairfax, Virginia Discussion of Converting the Fairfax County Parkway and Franconia / Springfield Parkway from a Secondary Road to Primary Road

County of Fairfax, Virginia VDOT Criteria for Transferring Secondary System Roads to the Primary System Fairfax County Franconia/Springfield Parkway Parkway --- The Road Serves as a link between interstate or intrastate highways, or both; Serves a site of historical or scenic interest; Connects county seats; Has a minimum traffic volume of 2,000 vehicles per day; indirect connection

County of Fairfax, Virginia Fairfax County Franconia/Springfield Parkway Parkway --- The Road Carries a minimum of: 7 percent out-of-state-vehicles; 20 percent light and medium trucks; 2 percent tractor-trailers and buses. 20 percent of traffic is on trips of 25 miles or more; Was Not Studied Was Not Studied 5 percent of traffic is on trips of 100 miles or more. Was Not Studied Was Not Studied Degree of The degree of conformance with each of the criteria should be considered. Conformance Those roads suited for additions to the Primary System should fully conform to a majority of the criteria. Reference Code of Virginia, § and Commonwealth Transportation Board Minutes, 12/17/98 VDOT Criteria for Transferring Secondary Roads to the Primary System

County of Fairfax, Virginia Staff Recommendations Request VDOT to transfer the Fairfax County Parkway route 7100 and Franconia/Springfield Parkway route 7900 from the secondary system to the primary system

County of Fairfax, Virginia Questions