Independent Advisory Panel Presentation to the MWAA Board of Directors March 16, 2011 Brenda Bohlke Adrian Ciolko Walt Mergelsberg Rich Redmond Piet Van.

Slides:



Advertisements
Similar presentations
Planning and Development Committee West Corridor Update May 10, 2007.
Advertisements

Extending the Value of e-Procurement to Contingency Staffing
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Tysons January 15, Operational Analysis of Dulles Toll Road Ramps to Tysons Boone Boulevard Ramp Analysis Seyed Nabavi Fairfax County Department.
Replacement of the Queens Approach Bronx-Whitestone Bridge
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
Maryland Transportation Builders and Materials Association November 20, 2013.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Commuter Rail Vehicle Technology September Commuter Rail Vehicle Technologies for FasTracks Diesel & Dual Mode Locomotive Hauled Coaches (LHC) Electric.
Utah’s Use of CMGC & Project Delivery
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Alternative Project Delivery
Facilities & Capital Construction Program Overview Program Overview Project & Scope Schedule Alternative & Traditional Procedure Approaches E-Builder.
Commuter Rail Vehicle Technology Analysis | 1 May 2007 Commuter Rail Vehicle Technology Analysis May, 2007.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
2005 CitiMortgage, Inc & PHH Mortgage Full Mortgage Choice Offers Benefits to Relocating Employees and the Government Presented to: Government Wide Relocation.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Olympia School District Slide 1 9/15/2015 Administration Budget Proposal School Year.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1. Project Team  Susan Barry, Project Director  Brian Burger, Deputy Project Director  James Martin  Mike Landvik  Kevin Irving, FHWA 2.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Problem Statement High level of activity in region and state. Construction costs increased 20% to 50% over past year. Commodity price increases Commodity.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Contractor Alternate Design Serving the Public’s Best Interest.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
County of Fairfax, Virginia Silver Line Update Board Transportation Committee December 1, 2015 Mark Canale Fairfax County Department of Transportation.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
CHANGING PROJECT DELIVERY SYSTEMS
Lease-Leaseback Project Delivery Method
Overview of MSBA Building Process and Project Timeline
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Interstate 15 North Phase 4 8/19/2015 Update
(Additional materials)
CHANGING PROJECT DELIVERY SYSTEMS
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager
Cost Containment Working Group Board Update
Silver Line Department of Transportation
Delta Water Supply Project
Cost Containment Working Group Board Update
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

Independent Advisory Panel Presentation to the MWAA Board of Directors March 16, 2011 Brenda Bohlke Adrian Ciolko Walt Mergelsberg Rich Redmond Piet Van Dijk

Contents Architects Vision Construction Estimate Program Cost Status Phase 2 vs. Phase 1 Differences Contract Packaging Airport Segment Choices IAP Airport Station Recommendation

Construction Cost Estimate Status $100 M reduction in airport segment realized thru recent VE and cost review Only 20% or less of project cost partially reviewed Discrepancies w/quantities/unit prices & Basis of costs Recommend validation of remaining 80% + soft costs with DRC

Recent Project Cost Comparisons Similar project cost comparisons – Local and similar projects– $150-M to $170 M/mile – Aerial Station and line$ Million per mile Present Phase 2 estimate is $ M/mile (airport aerial; Modified LPA, respectively)

Program Cost Check Phase 2 Overall program costs are higher than expected for a project of this scope Phase 2 costs should be less than Phase 1: Ph 2 is competitively bid R/O/W is mostly MWAA owned Less utility reconstruction 80% of alignment is at-gradesimple, std metro design Fewer roadway relocations Less Maintenance of Traffic cost Significant less risk of third party impacts

Phase 1 Phase 2 L = 11.5 Miles – 8.5 miles at grade – 2.6 Miles Elevated 5 stations – 2 at grade – 3 elevated Major roadway relocation Heavy corridor MOT Major Utilities work Significant ROW purchase required Significant third party impacts Strong costs differentiators L =11.5 Miles – at grade – miles u/g or aerial 6 stations – 5 at grade – 1 u/g or elevated Minor temporary roadway relocation Easy MOT Less Utilities Mostly MWAA owed ROW Minor third party impacts

Multiple Packages= Less Risk, Potential Savings Eliminate biggest financial risk exposure to MWAA with full bonding Package low risk elements= lower contingencies=lower bids Attracts more bidders: – Proposal Investment is less for contractor w/ better chances to secure a contract – Attracts local experienced contractors

Airport Alternative Stations Analysis Goal : Best transportation solution Down to two basic alternatives – North Garage Aerial – C&C Station and Mined Tunnels (LPA) Design improvements could be made on both

Recommended Airport Station & Alignment Alternative Recommendation: Locally Preferred Alternative =Modified Baseline Allows innovation in contractor approach/schedule Provides protected and direct passenger access Longer service life/replacement schedule Shorter schedule to environmental approval No aesthetics and visual impacts w/ VDHR Fewer and shorter term construction impacts for Dulles