I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator October 5, 2010.
1 Fairfax County Base Realignment and Closure Laura Miller Fairfax County BRAC Coordinator October 18, 2011.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
County of Fairfax, Virginia Department of Transportation Regional Bus Rapid Transit Efforts Board Transportation Committee October 20, 2009.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
County of Fairfax, Virginia Department of Transportation Transportation Funding Alternatives and Outreach Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Transportation Advisory Commission 1 Department of Transportation Fairfax County Transportation Advisory Committee Jeff Parnes.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Fairfax County Transportation Committee November 29, 2011 Fairfax County Transportation Committee November 29, 2011 I 95 HOT Lanes Update.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
1 Item 11, Presentation to the TPB, September 15, 2010.
Chair, Fortune Green & West Hampstead Neighbourhood Development Forum
Mead Valley Municipal Advisory Council October 17, 2012
Update on FHWA/FTA Proposed Rulemaking. MAP-21 Requirements Section 1318(a)(3) o Solicit requests from state DOTs, transit authorities, and MPOs, for.
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Update on VDOT’s Northern Virginia ITS Architecture Plan and Integrated Corridor Management (ICM) Activities MANAGEMENT, OPERATIONS, AND INTELLIGENT TRANSPORTATION.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Virginia Department of Transportation (VDOT) Value Engineering Program Virginia Department of Transportation (VDOT) Value Engineering Program VDOT 6/14/2012.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
1 I-95/I-395 HOV/Bus/HOT Lanes Project update December
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Regional Priority Bus Transit Conference June 24, 2009.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
County of Fairfax, Virginia Silver Line Update Board Transportation Committee December 1, 2015 Mark Canale Fairfax County Department of Transportation.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Metro Highway Program Presentation to CMAA Abdollah Ansari
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Route1 Multimodal Alternatives Analysis Status Update
Four Winds Condominium Association August 2, 2017
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
DATA Transportation 101 Project Status March 20, 2002
Major Projects in Development
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Slugging in the I-395 Corridor
Board Transportation Committee October 13, 2015
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011

The Title Would be Placed Here Relief & new choices on I-95 Concurrent package of improvements: I-95 HOV/HOT Lanes Provide new choices, add capacity, extend and improve performance of existing HOV Department of Rail and Public Transportation Transit improvements Maximize benefit of growing HOT Lanes network by expanding bus service, Park & Ride lots VDOT Seminary HOV/Transit ramp Link HOV lanes on I-395 to growing Mark Center Seminary/Duke I-395 Auxiliary lanes Improved traffic movement on the regular lanes

The Title Would be Placed Here Environmental Assessment Draft NEPA document approved for public release by FHWA Interchange Justification Report Draft IJR report being finalized Technical Requirements Preliminary Design for Design Public Hearing Since March Transportation Committee Briefing

The Title Would be Placed Here Key Milestones Combined Design Public Hearing, NEPA and Transit Study Information Meeting September 26 th (Woodbridge) September 28 th (Springfield) September 29 th (Stafford) Finalize Environmental Document Finalize Interchange Justification Report Commercial Close Financial Close Construction as early as 2012 Construction approximately 3 years

The Title Would be Placed Here Regional Project and Traffic Information VIRGINIA.ORG Project Information Resources

The Title Would be Placed Here Auxiliary lane

The Title Would be Placed Here Mark Center HOV/Transit Ramp Delivered concurrently with HOV/HOT Lanes Links Seminary Road to I-395 Ramp restricted to HOV/transit No anticipated impact on Winkler Nature Preserve Environmental, traffic studies begin 2011 Construction as early as 2013

The Title Would be Placed Here Short & Intermediate Term Improvements