Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion Board Retreat February 7, 2012.
Advertisements

Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
County of Fairfax, Virginia 11 Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17,
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
County of Fairfax, Virginia Department of Transportation Urban Street Standards Progress Report Board of Supervisors Transportation Committee December.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
County of Fairfax, Virginia Transportation Priorities Plan Future Updates 1 Ray Johnson and Tom Biesiadny Fairfax County Department of Transportation Board.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Metro Highway Program Presentation to CMAA Abdollah Ansari
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
City of Belmont Pavement Reconstruction Project October 15, 2014.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Football Post Traffic Set UP
planning and zoning committee presentation September 19, 2016
District 3 Complete Streets Projects
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
River to Sea TPO Meeting US 92/International Speedway Boulevard
Comprehensive Transportation Plan
Presentation transcript:

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011

Purpose – Consider the current status and future access needs in the vicinity of the two stations – Provide pedestrian and bicycle access, and effective bus feeder service, and – Manage vehicular traffic projected in the area of the stations Study Area – Reston-Wiehle Avenue and Reston Town Center station areas Design Periods – Wiehle Ave Station – 2013 – Reston Town Center Station – 2017 – Other conditions RMAG Status Report

Public input was developed through the RMAG monthly meetings Four public meetings: – Initiation of the study – Existing conditions – Preliminary findings – Final recommendations Priority at station areas was given to: – Pedestrians – Bicyclists – Transit Users (buses) – Private Vehicles (drivers and carpools) RMAG Status Report

Northside bus routing Southside bus routing

Proposed Street Grid at Wiehle Avenue Station RMAG Status Report

Project Prioritization – Based on Metrorail Opening Date Reston-Wiehle Ave – December 2013 Reston Town Center – early 2017 – Projects required by the Record of Decision – Project required by Comstock development – Linkage between projects – Availability of funds – Longer term needs

RMAG Status Report Project Prioritization Matrix

Board Approved Funded Projects – Sunrise Valley Drive, add curb-abutted sidewalk on south side from Soapstone Drive to South Lakes Drive - - 5,000 feet – Sunrise Valley Drive, upgrade asphalt sidewalk on north side from Soapstone Drive to South Lakes Drive - - 4,500 feet – Wiehle Ave, upgrade to curb abutted sidewalk on west side from Sunrise Valley Drive to Station entrance feet – Wiehle Ave and Isaac Newton Square South, add signalized crosswalks and median – Isaac Newton Square West and WO&D Trail, upgrade and add asphalt sidewalk on west side to Sunset Hills Road – Wiehle Avenue, add sidewalk along east side from Chestnut Grove Square to North Shore Drive (south) - - in design RMAG Status Report

Improvements Required by Record of Decision – Additional left turn lane from Wiehle Ave northbound at station entry – Additional left turn lane from DTR eastbound ramp at Wiehle Ave and the addition of interim bus bays – Widen Sunset Hills Rd from Wiehle Ave to Isaac Newton Sq and install left turn lane from Sunset Hills Rd westbound to Isaac Newton Sq (south) – New entry from Isaac Newton Sq (south) into station area – Intersection and pedestrian improvements at Wiehle Ave and Sunset Hills Road – Improvements to right turn lane from Sunrise Valley Dr (westbound) to Wiehle Ave (northbound)

RMAG Status Report Project Funding for RMAG Recommendations – Total RMAG funding requirement is approximately $111 million Roadway improvements:$74 million Pedestrian/bike improvements:$29 million Transit improvements:$ 8 million – Currently $4 million in Congestion Mitigation and Air Quality (CMAQ) fund for the previously mentioned projects – $21 million in Regional Surface Transportation Program (RSTP) funds are programmed through FY 2017 for additional RMAG projects – Future redevelopment in the Reston area may generate developer contributions toward the RMAG projects – Additional federal, state, regional and local funding opportunities will be explored as they become available