NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS 1.1.7 Page 1 1 Infrastructure Review - W.B.S. 1.1.7 Water Systems Water Systems –Upstream.

Slides:



Advertisements
Similar presentations
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Advertisements

KURSUS PENGENALAN KEPADA PERKHIDMATAN MEKANIKAL DALAM BANGUNAN
Ground Loop Design. Heat Sources Horizontal ground loops  Collector pipework laid horizontally  Requires large land area  Cost.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
Booster System Basics: Constant Speed Systems
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Heather Instasi Tulio Borel. Objectives Design a radiant heating system for a greenhouse located in Atascadero, CA Hot ethylene-glycol solution flowing.
STEAM HEATING.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
High Density Cooling Air conditioning for high density applications
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Update on the PSB Cooling and Ventilation Systems
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CBETA Technical Review
SABRE PoP Fluid Handling
News and brief overview of Beamline plans for the next few months
Recirculating CO2 System
LEBT water cooling system
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream LCW for Extraction and Pre-Target Magnets & P.S. –Downstream LCW for cooling the MINOS Near Detector Coil, Power supply and Electronics Racks. –Downstream RAW for cooling the Absorber. –Decay Pipe Cooling for cooling the decay pipe. –Horn RAW (RadioActive Water), for cooling the Horns. –Target RAW for cooling the target, horn protection baffles. Vacuum Systems –Extraction and Primary Beam, Hadron Decay Pipe Gas Systems –Primary Beam Instrumentation –Secondary Beam Instrumentation WILL HAVE A SEPARATE REVIEW OF THE RAW SYSTEMS ON 8/1/01

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 2 2 Infrastructure Review - W.B.S Upstream LCW (MI-62) System U.S. LCW System has LCW pumps, Heat Exchanger located in MI-62. Heat Exchanger sized for 1200 kW, actual heat load is approximately 750kW. HX is a shell and tube unit and is already in MI-62. Strand needs to be built, stands drawings underway. 550 gpm pump, 440 feet TDH, 100 HP. Pump spec’d not purchased. Will include a hot stand-by unit. Provides LCW to all magnets in extraction and pre-target areas, Power supplies in MI-62, TSB, Underground Mechanical Space (horn P.S.) ~ 4630 gallons of LCW in the piping, more in exp. tank. Heat rejected to MI pond G via pumps in PV-9. Existing pumps are not perfectly fit to our application (too much head with two pump operation/too little flow for one pump operation).

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 3 3 Infrastructure Review - W.B.S Upstream LCW (MI-62) System Status of the Upstream LCW System: –Piping already installed in MI up to the shield wall. –Piping will need to be extended in MI after the shield wall is removed. –MI-62 piping laid out as far as possible w/o pump and strainer selections finalized. –Piping Installation in the carrier tunnel, pre-target, shaft, underground mechanical area, and NuMI Target Service Building (MI-65?) to be in the Outfitting and Service Building Contract –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. Will use one PID loop to control temperature Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 4 4 Infrastructure Review - W.B.S Downstream LCW (MINOS) System D.S. LCW System has LCW pumps, Heat Exchanger located in the MINOS Near Detector Hall. Heat Exchanger sized for 200 kW, actual heat load is approximately 110kW. Will use a welded plate and frame HX. 160 gpm pump, 35 feet TDH, 3 HP. Pump not spec not yet written. Will include a hot stand-by unit. Will have a booster pump for the power supply just like the one at NMS currently. Provides LCW to the near detector magnet coil, power supply, and 27 water cooled electronics racks. ~ 150 gallons of LCW in the piping, more in expansion tank, rack, magnet coil. Heat rejected to MINOS chilled water (same water used for de- humidification in the underground spaces).

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 5 5 Infrastructure Review - W.B.S Downstream LCW (MINOS) System Status of Downstream LCW (MINOS) System: –Piping layout drawings completed. –Piping to be installed in the Service Building and Outfitting Contract. –Skid Design not started. –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. Will use one PID loop to control temperature Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 6 6 Infrastructure Review - W.B.S Absorber Cooling RAW System Absorber RAW System has pumps, heat exchanger located in the absorber access tunnel. Intermediate loop has the pumps, heat exchangers and filters located in the MINOS service building. Heat Exchangers sized for 200 kW, actual heat load is approximately 130kW. Will use a welded plate and frame HX between RAW and intermediate loop, a S&T between intermediate loop and the pond water. Both RAW and Intermediate loop pumps are 60 gpm pumps, 65 feet TDH, 3 HP. Pump not spec not yet written. Will include a hot stand-by unit for both RAW and Intermediate loop pumps. Provides cooling to remove the beam energy deposited in the absorber along the vacuum decay pipe. ~ 90 gallons of water in the absorber and piping, more in expansion tank, heat exchangers and manifolds. Heat rejected to MINOS pond water. Activation of water not yet quantified.

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 7 7 Infrastructure Review - W.B.S Absorber Cooling RAW System Status of the Absorber Cooling RAW System: –Piping layout drawings have not been started. –Piping to be installed in the Service Building and Outfitting Contract. –Skid Design not started for either the RAW or the Intermediate loop skid. –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. Will use one PID loop to control temperature for the intermediate loop, no direct temperature control on the RAW loop. Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 8 8 Infrastructure Review - W.B.S Decay Pipe Cooling RAW System Decay Pipe RAW System has pumps, heat exchanger located in the absorber access d.s. end and heat exchanger, filter, DI bottle in the underground mechanical support room at u.s. end. Heat Exchanger sized for 200 kW, actual heat load is approximately 150kW. Will use a welded plate and frame HX. 50 gpm pump, 325 feet TDH, 7.5 HP. Pump not spec not yet written. Will include a hot stand-by unit. Provides cooling to remove the beam energy deposited in the shielding along the vacuum decay pipe. ~ 1250 gallons of water in the piping, more in expansion tank, heat exchangers. Heat rejected to MINOS chilled water (same water used for de- humidification in the underground spaces) at downstream end and to the intermediate loop of CUB water at the upstream end (also used for de- humidification in the underground spaces). Activation of water is not severe. Should not have to change this water during the life of the experiment.

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 9 9 Infrastructure Review - W.B.S Decay Pipe Cooling RAW System Status of the Decay Pipe Cooling System: –Piping layout drawings started in PPD. Have begun to change the layout to move the connections between individual tubes and the manifold to an accessible area. –Piping to be installed in the Service Building and Outfitting Contract. –Skid Design not started. –Equipment Purchase Requisitions and specifications not prepared. –Changing from 1” nominal copper lines to ¾” nominal polyethylene coated copper lines to prevent galvanic corrosion between the copper and the low carbon steel decay pipe. The decay pipe is less noble, therefore it would corrode, possibly causing a vacuum leak. –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. No temperature control Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Infrastructure Review - W.B.S Horn 1 Cooling RAW System Horn 1 RAW System has pumps, heat exchanger, filter, DI bottle in the underground mechanical support room at u.s. end. Heat Exchanger sized for 150 kW, actual heat load is approximately 30kW. Will use a welded plate and frame HX. 115 gpm pump, 61 feet TDH, 5 HP. Pump not spec not yet written. Will include a hot stand-by unit. Provides cooling to remove the beam energy and I 2 R deposited in horn 1. ~150 gallons of water in the piping, more in expansion tank, heat exchangers. Heat rejected to the intermediate loop of CUB water at the upstream end (also used for de-humidification in the underground spaces). Activation of water is severe. Will change annually but will also exceed the recommended concentrations.

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Infrastructure Review - W.B.S Horn 1 Cooling RAW System Status of Horn 1 Cooling Raw System: –Piping layout drawings 90% completed. –Piping to be installed in the Service Building and Outfitting Contract. –Skid Design has just been started. –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. No temperature control is used Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Infrastructure Review - W.B.S Horn 2 Cooling RAW System Horn 2 RAW System has pumps, heat exchanger, filter, DI bottle in the underground mechanical support room at u.s. end. Heat Exchanger sized for 50 kW, actual heat load is approximately 10kW. Will use a welded plate and frame HX. 115 gpm pump, 61 feet TDH, 5 HP. Pump not spec not yet written. Will include a hot stand-by unit. Provides cooling to remove the beam energy and I 2 R deposited in horn 2. ~100 gallons of water in the piping, more in expansion tank, heat exchangers. Heat rejected to the intermediate loop of CUB water at the upstream end (also used for de-humidification in the underground spaces). Activation of water is severe. Will change annually but will also exceed the recommended concentrations.

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Infrastructure Review - W.B.S Horn 2 Cooling RAW System Status of Horn 2 Cooling RAW System: –Piping layout drawings 90%completed. –Piping to be installed in the Service Building and Outfitting Contract. –Skid Design has just been started. –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. No temperature control is used Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Infrastructure Review - W.B.S Target Cooling RAW System Target RAW System has pumps, heat exchanger, filter, DI bottle in the underground mechanical support room at u.s. end. Heat Exchanger sized for 20 kW, actual heat load is approximately 10kW. Will use a welded plate and frame HX. 15 gpm pump, 58 feet TDH, 1 HP. Pump not spec not yet written. Will include a hot stand-by unit. Provides cooling to remove the beam energy and I 2 R deposited in the target and baffle. ~50 gallons of water in the piping, more in expansion tank, heat exchangers. Heat rejected to the U.S. LCW system. Activation of water is unknown as it has not yet been calculated.

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Infrastructure Review - W.B.S Target Cooling RAW System Status of the Target and Baffle RAW System: –Piping layout drawings 90%completed. –Piping to be installed in the Service Building and Outfitting Contract. –Skid Design has not started. –There remains some difference of opinion as to if the beam baffle is, or is not, water cooled. This has a negligible affect on the cost. –Instrumentation List Complete Best scheme to read in to/out of ACNET not yet settled. No temperature control is used Will have a few pump interlocks

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Vacuum Vacuum in the Primary Beam: –Designing for a 1 x torr level in the instrumentation region of the primary beam transport pipe. P&ID prepared. –Generated Instrument Lists for extraction. –Pre-Target Instrument List not completed –Parts for Vacuum Instrumentation being purchased. Custom building of controller chassis for Ion pumps and instrumentation. Decay Pipe Vacuum : –Decay system P&ID prepared. 24 hour pump down calculated 48 liters of water is the maximum volume of water in the air in the decay pipe assuming 100% relative humidity at the beginning of the pump down. –Skid drawings not yet started nor equipment specified.

NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page Gas Systems Gas Systems for: –Loss monitors for primary beam area (Ar-CO 2 ) –Secondary beam Monitoring (He-2%H 2 ) Status: –Both system designs remain on hold pending instrumentation development. –Significant chance that the secondary beam monitoring may choose a technology which does not require gas.