NANC Toll-Free IMG Activity Summary & Status November 28, 2000.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
NANC Toll-Free IMG Activity Summary & Status October 17, 2000.
NANC Toll-free IMG Activity Report & Status February 20, 2001.
NANC Toll Free IMG Status Report & Activity Summary January 17, 2001.
NIIFs Report to the NANC on Issue #0173, Toll Free Record Application Performance Guidelines by David H. Bench, NIIF Moderator.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
0 - 0.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
THE WORK AT ANTIOCH. I. WORKED ACCORDING TO ABILITY, Acts 13:1-3 A. "Ministered," v. 3; Eph. 4:11-13; 1 Pet. 4:11; 1 Cor. 12: 14-22; Matt. 25:15, 21,
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
1 TSD-160 Introduction to Network Analyzers and Error Correction Doug Rytting 4804 Westminster Place Santa Rosa, CA
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Essential Cell Biology
Fourth Quarter Oklahoma Data (October-December 2011)
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Presentation transcript:

NANC Toll-Free IMG Activity Summary & Status November 28, 2000

NANC Toll-Free IMG Activity Summary & Status Activities Since the October Meeting –10/23/00 Virtual Meeting- 21 Participants Agreed to move forward w/ Technical Requirement Document, cease work on FSD –10/10/00 Virtual Meeting- 18 Participants No Consensus Regarding competitive bid Reviewed contributions in preparation for Dallas face-to-face meeting

NANC Toll-Free IMG Activity Summary & Status Number CompanyContribution TitleDate Submitted 1WorldComManagement and Oversight of Toll Free Administration10/10/00 2QWESTRevised text for Contribution: Security & Data Maintenance10/24/00 3Richard BartelFCC Part 52 Regulations on Warehousing and Hoarding10/27/00 4ATTReports10/27/00 5VerizonSMS Transaction Rate10/31/00 6SprintNIIF Draft Document11/1/00 7Sprint/SBCTF IMG Guidelines for Technical Requirements Document11/2/00 8WorldComResponse to Bell South Questions11/2/00 9DMSIResponse to SMS Transaction Rate11/2/00 10Bell SouthWork Plan and Load Management11/6/00 11VerizonSection 9.011/6/00 12WorldComCompetitive Bid11/10/00 13SprintText11/13/00 14WorldComSystem Flexibility11/14/00 15Judith OppenheimerText for Section 1.511/14/00

NANC Toll-Free IMG Activity Summary & Status Activities since the October Meeting –November 14 through 16, 2000, face-to- face meeting Baseline text agreed to for sections 1-4 of the technical requirement document Agreement reached to request more time (3 months) to complete work

NANC Toll-Free IMG Activity Summary & Status *Toll-Free/LNP Comparison Toll-Free Million Numbers LNP Million Numbers Ported Toll-Free Record size up 255 K Bytes LNP Record size 500 Bytes

NANC Toll-Free IMG Activity Summary & Status Technical Requirement Document Table of Contents Section 1.0Introduction 2.0RespOrg Interface 3.0Features/Functionality/Record Maintenance 4.0Routing Network Interface 5.0System Characteristics and Performance 6.0Operations/Administration/Maintenance 7.0RespOrg Changes 8.0Structure 9.0Oversight/Compliance 10.0Quantification 11.0Acronyms and Definitions Appendices ARequirements Trace-ability Matrix BStandard Reports

NANC Toll-Free IMG Activity Summary & Status Planned Activities –12/4/00, Conference Call to review contributions (due 11/29/00) –12/6-8/00, Meeting, Toronto –12/22/00 Conference Call –1/9-11/01, Meeting, San Francisco –1/30 through 2/1/01, Meeting, Atlanta –2/13-15/01, Meeting, Location TBD