1 INC Report to the NANC November 19, 2002 David Bench - INC Moderator Dana Smith - INC Assistant Moderator
2 INC MEETINGS November 4-8, 2002: Washington, DC January 7-10, 2003: Washington, DC Details on all future meetings can be found at:
3 LNPA Workshop Grandfathered Wireless NXX Codes INC added text to the Thousands-Block Pooling Guidelines to direct the PA to set aside those blocks from wireless grandfathered NXXs that were donated to the pool. The PA cannot assign these blocks to SPs until regulatory authorities provide direction on how to handle these unique numbering resources.
4 CIC Workshop The INC agreed to set aside FGD CIC 0911 so it would be unavailable for assignment to any entity. –In the foreseeable future, it could potentially be designated for emergency use. –Requested by NANPA.
5 Committee Issue Summary CICCO/NXXDMMLNPANANP Expansion NPA Active Initial Closure *Resolved *Tabled *Withdrawn *TOTAL WS Issues Total Active Issues as of November 8, 2002: 16 New Issues Since Last NANC Meeting: 15 Total Issues in Initial Closure as of November 8, 2002: 7 *Total Issues Resolved: 282 Issues With No National Agreements = 0 *Since INC Inception
6 RELEVANT INC WEB SITES INC Homepage (front page to all INC links): INC Calendar (future meeting logistics/agendas): INC Issues (historical and active links): INC Meeting Records: INC Published Documents: