GEM Group SETUP Project The Science Education Teaching Unit Preparation Project SETUP Project Prepared for the National Science Foundation NSF 01-136:

Slides:



Advertisements
Similar presentations
Technology Use Plan Methacton School District Patty McGinnis ED TECH 501.
Advertisements

Strategic Interventions for English Learners Long Beach Unified School District Chris Dominguez, Deputy Superintendent Pamela Seki, Director, Program Assistance.
Action Research Not traditional educational research often research tests theory not practical Teacher research in classrooms and/or schools/districts.
Campus Staffing Changes Positions to be deleted from CNA/CIP  Title I, Title II, SCE  Academic Deans (211)  Administrative Assistants.
A Career Ladder is a well defined pathway from one profession to another that includes: Increasing levels of skill and knowledge Increasing levels of.
2010 California Standards Test (CST) Results Lodi Unified School District Prepared by the Assessment, Research, and Evaluation August 17, 2010 Board Study.
Teachers for A New Era Neag School of Education Teacher Preparation Program’s Fall 2008 Common Entry Survey Results Teachers for A New Era (TNE) Teacher.
OCW SE: Project Overview March 29, 2006 OpenCourseWare Secondary Education.
Oregon Common Core State Standards Transitioning to New Standards and Assessments.
STEPPING STONE PROJECT STEPPING STONE PROJECT designing a new engineering discipline presented by team 1.
STaR Chart Comparison Carol McMillan EDLE 672. STaR Chart Comparison Review of key areas - Teaching and learning - Educators preparation and development.
Digital Library Resources Instructional Design (5100:631) Dr. Savery April 27, 2010.
Home Economics Teachers’ Readiness for Teaching STEM
Pondamania: Exploring Pond Viability Project Overview Teacher Planning Work Samples & Reflections Teaching Resources Assessment & Standards Classroom Teacher.
Milwaukee Partnership Academy An Urban P-16 Council for Quality Teaching and Learning.
NSF GK-12 STEP Fellow Training at the University of Cincinnati Dr. Anant R. Kukreti – Lead PI Dan Boles – Secondary STEP Teacher Andrea C. Burrows – Grant.
Stone-Robinson Math Information Night Dr. Nicholas King, Principal December 9, 2014.
Feb. 2006RUFO- 2nd Workshop Al-Quds University Rashid Jayousi, PhD Computer Science Dept. Experiences in E-learning.
Exploring Strategies for the Secondary Level in Mathematics Patricia Latham and Cathie McQueeney September 28, 2006.
Online Robotics Program for Middle Schools EML 4551 Senior Design Project Jeancarlo Casasola Dennis Diaz Emily Senyk Advisor: Dr. Sabri Tosunoglu Department.
Subject Matter Expert/Author: Assoc. Prof. Dr Rashid Johar (OUM) Faculty of Science and Foundation Studies Copyright © ODL Jan 2005 Open University Malaysia.
SCIENCE AND MATHEMATICS TEACHER INITIATIVE Improving the Undergraduate Pipeline to Math and Science Teaching Credentials Program Overview.
Transition to Teaching Recruiting, Preparing, and Retaining Science Teachers through TTT Beatriz Ceja, Gillian Cohen-Boyer and Thelma Leenhouts U.S. Department.
Integrating Educational Technology into Teaching
CSU Math and Science Teacher Initiative California Mathematics Council-South November 7, 2009 Joan Bissell, Director Mathematics and Science Teacher Initiative.
The Savvy Cyber Teacher ® Using the Internet Effectively in the K-12 Classroom 1 Savvy Cyber Teacher ® Using the Internet Effectively in the K-12 Classroom.
The Center for the Future of Teaching and Learning California’s Teaching Force 2004 Key Issues and Trends Research conducted by SRI International California.
OpenCourseWare Secondary Education Steering Committee Meeting – August 10, 2006.
GEM Group SETUP Project The Science Education Teaching Unit Preparation Project S E T U P Prepared for the National Science Foundation NSF : Science,
WELCOME! Get an agenda Get an agenda Take your child’s folder from the correct grade level box. Folders are in alphabetical order Take your child’s folder.
Mathematics and Science Education U.S. Department of Education.
Laboratory 1: Introduction to Microsoft Word, Excel, and PowerPoint General Engineering Polytechnic University.
The Achievement Gap and Equal Educational Opportunity Presented by July & Linda July 23, 2004.
By Nanette Chapa.  To realize the benefits of technology, schools must develop a plan for integrating technology into the curriculum. An effective technology.
ACADEMIC SUCCESS STARTS WITH INFORMATION LITERACY A Pilot Program.
The Center for the Future of Teaching and Learning Research conducted by SRI International California State University University of California, Office.
Lubbock Independent School District Technology Plan By Stacey Price.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
Educational Computing David Goldschmidt, Ph.D. Computer Science The College of Saint Rose Curriculum and Technology.
OUR MOVEMENT: UNDERSTANDING THE BIG PICTURE. 2 OVERVIEW Theory of Change Programmatic Approach.
The Integration of Distance Delivered Technology in Aquaculture Extension Education Programs Dr. Jerry D. Gibson Extension Specialists, Program and Staff.
Reform Model for Change Board of Education presentation by Superintendent: Dr. Kimberly Tooley.
This presentation:  is “ready-to-use” for presentations to school division administrators, board members, library personnel, teachers, etc.  incorporates.
NCATE for Dummies AKA: Everything You Wanted to Know About NCATE, But Didn’t Want to Ask.
CaMSP Cohort 8 Orientation Cohort 8 State and Local Evaluation Overview, Reporting Requirements, and Attendance Database February 23, 2011 California Department.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Professional Development Opportunities for the New Math Standards.
© 2012 Adobe Systems Incorporated. All Rights Reserved. Copyright 2012 Adobe Systems Incorporated. All rights reserved. ® DESIGN PROJECT PRODUCTION PHASES.
Los Angeles Unified School District Local District G Principals Meeting.
Building a Culture of Leadership at Belmont High School Michael M. Harvey, Ed.D. Principal, Belmont High School.
Survey of Enacted Curriculum— © 2004 CCSSO All rights reserved. Surveys of Enacted Curriculum: An Introduction to Accessing and.
Lois McLean, Ed.D. & Rick Tessman, Co-PIs McLean Media, Grass Valley, CA NSDL Annual Meeting - Nov 7, 2007 OBJECT LESSONS Content Clips in the Classroom.
Chris Dyszel Gifted Education in Primary Grades
Webster Public Schools October 8, Goal for AYP in every subject, at every grade level, and for every subgroup. We can do this.
Created By: Erin McAlister Christiana Elder Sherene Mayner Freddie Martinez.
Statewide Evaluation Cohort 7 Overview of Evaluation March 23, 2010 Mikala L. Rahn, Ph.D.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
1 Introduction Overview This annotated PowerPoint is designed to help communicate about your instructional priorities. Note: The facts and data here are.
Accountability & Program Assessment Governing Board Online Training Module.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
What is Title 1? It is a federal formula grant.
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
Oregon Teacher Standards & Practices Commission July 24, 2013
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
2009 California Standards Test (CST) Results
Tucson Unified School District
Change Process communication plan: Google Education
Course Project Overview
8th Grade 4 Year Plan.
Presentation transcript:

GEM Group SETUP Project The Science Education Teaching Unit Preparation Project SETUP Project Prepared for the National Science Foundation NSF : Science, Technology, Engineering, and Mathematics Teacher Preparation (STEMTP) Prepared by Dr. Chris Hasegawa California State University, Monterey Bay CST 308 Fall 2001 Professor Carolyn Sabin Team Members Gillian Keisker, Enrico Monteleone and Maria Valladares

GEM Group SETUP Project Executive Summary In California there is a shortage of science teachers with each type of degree. Because of this, instructors are assigned to teach classes in areas they have not studied. The quality of classroom instruction is compromised. Students are not meeting standards set by the state and nation. SETUP will provide instructors with complete, well thought out lesson plans and also unique features such as how to manage a science activity. SETUP will take the guesswork out of planning and replace it with proven concrete instructional methods. A positive impact will be made on academic achievement for the students. Teachers will be well rounded to all facets of teaching a lesson.

GEM Group SETUP Project Introduction SETUP is committed to meeting the needs of teachers in grades 9-12 in science. A web-based tutorial will be available to assist in the formulation of instructional strategies,lesson plans, resources, and troubleshooting.

GEM Group SETUP Project Objectives Primary audience New and existing High School teachers instructing Physics, Chemistry, and Biology in the Salinas High School District. Have a degree in some area of science but not directly credentialed in the subject they are teaching. Secondary audience Students grades In general, an overall poor academic performance on California/U.S Standardized Tests. 40% of the students are White, 50% are Latino, the other 10% represents a broad demographic. In regards to the Latino population, over 70% of these students come from families that work in the surrounding agriculture fields.

GEM Group SETUP Project Needs Analysis: Teachers The Salinas High School District needs standards- based teaching  One in five teachers in the Salinas Valley and neighboring communities does not have a proper teaching credential  Eighty of the district's 540 teachers are in the first or second year of service.  The majority who are teaching Math, and Science, are teaching with a substandard credential.

GEM Group SETUP Project Needs Analysis: Students The Salinas High School District is ethnically diverse Majority population is Latino (Mexican-American labor)

GEM Group SETUP Project Needs Analysis: Students

GEM Group SETUP Project Needs Analysis: MPUSD Teachers Every year about 5% are new to the profession From those 11% lack full credentials By their fifth year 20% have left the district Different ethnic background  26% non white teachers  40% of the students are minority Little or no training in teaching to state/national standards

GEM Group SETUP Project Needs Analysis: MPUSD students Monterey Peninsula Unified School District  MPUSD students outscores Salinas High School District, but  results are also dismal  20% of its graduates are UC/CSU eligible  36% statewide are UC/CSU eligible  This disparity affects all racial/ethnic groups  Low income families

GEM Group SETUP Project Needs Analysis: Conclusion Under-prepared teachers Low income Factors to the poor academic performance

GEM Group SETUP Project Content Description: The Site Lesson Plan  Objectives  Background  Procedures  Resources  Troubleshooting Troubleshoot Forum

GEM Group SETUP Project Budget Initial Equipment Startup $13,000 Monthly Personnel (20 months) $432,000 Monthly Equipment (20 months) $26,000 Total $471,000 Budget spreadsheet

GEM Group SETUP Project Detailed Design Document Target Audience Technical Specifications Treatment Overview  Simple  Initial science focus  Fun

GEM Group SETUP Project Detailed Design Document Web Site Flow Chart Home Page Requirements Trouble- shooting Forum Search Information Search Results List Search Results Record Online Survey

GEM Group SETUP Project Scope of Work Internet Web Site Delivery system Content Acquisition and Copyright Content Translation Evaluation —  ©

GEM Group SETUP Project Work Plan: Tasks 1.Analysis and planning 2.Design 3.Production 4.Quality assurance 5.Distribution and marketing 6.Maintenance and support

GEM Group SETUP Project Work Plan Timeline Timeline Jan 2002 – Alpha Version Jun 2002 – Beta Version Jan 2003 – Release Version 1 Feb 2003 – Distribution Jun Maintenance

GEM Group SETUP Project Sample Web Site

GEM Group SETUP Project Questions?