Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.

Slides:



Advertisements
Similar presentations
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Advertisements

Requirements Engineering Processes – 2
1 Accessibility Forum Projects Bill Hetzner Jim Kindrick.
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
17th WGITA meeting May 2008 IDI-WGITA eLearning Project Updates.
Cario, April, 18th 2005 Dr. Roland M. Wagner SDI NRW Joint Project 2004: Identification of enhanced SDI elements Dr. Roland M. Wagner
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Quality Assurance Plan Change & Configuration Management Motorola Technology Center Italy Turin - 7/8 June, 2001.
Cultural Heritage in REGional NETworks REGNET Project Management and Coordination.
Cultural Heritage in REGional NETworks REGNET Implementation of the version 2 of the REGNET-Demonstrator – D8 Implementation of the version 2 of the REGNET-Demonstrator.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP7 - Project Management Software Development Plan Increment.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP 5 - Overview Development of a Technological Implementation.
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Cultural Heritage in REGional NETworks REGNET Status of Task 2.1 Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Cultural Heritage in REGional NETworks REGNET T2.4: Business Process Re-engineering.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET Review Meeting (REV-01-01), , Brussels.
Cultural Heritage in REGional NETworks REGNET WP 4 Demonstration, Assessment and Evaluation.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP 7 - Management Task 7.1 – Project Management Task 7.2 – Quality.
Cultural Heritage in REGional NETworks REGNET Trial Service and Recommendations – D11.
By Rick Clements Software Testing 101 By Rick Clements
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
The Managing Authority –Keystone of the Control System
Knowledge Platform for assessing the costs and benefits of flood prevention FLOOD CBA Presentation: Ms Vasiliki Papadopoulou, SIGMA CONSULTANTS Ltd Kick-Off.
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Human Performance Improvement Process
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Break Time Remaining 10:00.
Effectively applying ISO9001:2000 clauses 6 and 7.
15. Oktober Oktober Oktober 2012.
2014 National Patient Safety Goals
We are learning how to read the 24 hour clock
Lecture 8: Testing, Verification and Validation
Lecture 6: Software Design (Part I)
Chapter 10 Software Testing
25 seconds left…...
Career Salary Your pension value at 6 April 2011 Further Information Understand how Career Salary benefits grow This presentation has been prepared to.
: 3 00.
5 minutes.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Uma Rede de Tecnologia e Qualidade ISQ FRIENDCOPTER Integration of Technologies In Support of Passenger And Environmentally Friendly Helicopter instituto.
Clock will move after 1 minute
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
© Copyright, The Joint Commission 2015 National Patient Safety Goals.
Educator Evaluation: A Protocol for Developing S.M.A.R.T. Goal Statements.
Presentation transcript:

Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14

REGNET Final Project Review27 March Outline Motorola GSG Italy The process framework: Benefit of a process framework REGNET Process Framework The process framework implementation Quality Assurance elements Verification & Validation Internationalisation (i18n) & Localisation (l10n) Configuration & Change Management

REGNET Final Project Review27 March Motorola GSG Italy Motorola Global Software Group Italy: High Maturity Process Oriented Organization with a well defined SW Production Process GSG Italy was certified SEI SW CMM Level 3 organization in Nov. 2002

REGNET Final Project Review27 March Benefit of a process framework An appropriate development methodology is in place Standards and procedures are used Adequate documentation is produced Changes are controlled Testing and verification are focused on areas of highest risk Defects are identified earlier

REGNET Final Project Review27 March REGNET Process Framework The Task preview & planning phase is conducted at the beginning of a phase, task or subtask, for the benefit of the project teams, producing a common understanding of the purpose and expected outcome of an activity. The activity phase is the actual deployment of the work, object of the phase, task or sub-task... The Quality Gate is a check to determine whether an activitys output is fit for its intended purpose The Post Mortem is a mechanism for learning from the completed activity

REGNET Final Project Review27 March Apr.1 st Kick-off Workshop (TG) Workshop (CPG) Aug.1 st 2001 Dec.1 st Workshop (Themes) First Review Apr.1 st 2002 Mar.31 st C-T Usability Meeting Aug.1 st 2002 Dec.1 st CPG Meeting Second Review Third Review C-T Usability Meeting Phase 1Phase 2 WP1WP2WP3WP Technical Meeting (TG) Technical Meeting (TG) Final Meeting Preview & Planning (Post-Mortems) The process framework implementation Extended PJM Meeting Q_Gate Review Extended PJM Meeting Technical Meeting (TG) Extended PJM Meeting

REGNET Final Project Review27 March Quality Assurance Elements (I) Identification of a Verification & Validation framework: Verification Document Review Testing (White Box) Validation System Testing (Black Box)

REGNET Final Project Review27 March The REGNET Verification & Validation framework WP1 Analysis of the state of the Art and Development of Centers WP4 Demonstration, Assessment and Evaluation WP3 Validation of the REGNET Demonstrator and preparation of the Demonstration Phase WP2 Implementation of the System and Preparation of Service and Product Generation PHASE 1 PHASE 2 Verification & Validation Verification: Document Review & Testing ( White Box ) Embedded in the System Engineering Group and/or Quality Assurance Group Validation: Testing ( Black Box ) Independent: the V&V group is independent of the development team User group: a broad public participate

REGNET Final Project Review27 March Quality Assurance Elements (II) Definition of simple rules and a simple process to be followed for Internationalisation (i18n) & Localisation (l10n) Configuration Management Identification of CIs Definition of a Naming Convention Common repository structure Change Management Implementation of a mechanism for controlled introduction of changes

REGNET Final Project Review27 March Thank you!!!