Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group 2002-01-28 - 2002-01-29.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Myra Shields Training Manager Introduction to OvidSP.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Cultural Heritage in REGional NETworks REGNET Extended Project Group Meeting Den Haag,
Status Report for WP 1.1 and WP 1.2 Milestones, Results & Actual Work Josef Herget/Silke Grossmann (IMAC), Vic Haesaerts(TARX) Project Management Group.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET. June 2002REGNET Project 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT ICCS ZEUS VALT.
Cultural Heritage in REGional NETworks REGNET Review Meeting (REV-01-01), , Brussels.
Florence Meeting, September 2001 Regnet CULTURAL HERITAGE IN REGIONAL NETWORKS Interim Report 6.1 – Information Dissemination D 13 – Information.
Content Group Meeting Josef Herget/Silke Grossmann (IMAC) Project Team Group Meeting
Cultural Heritage in REGional NETworks REGNET Status of Task 2.1 Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Cultural Heritage in REGional NETworks REGNET T2.4: Business Process Re-engineering.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Results, open issues, workplan
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Status of WP 2 / WP 3 Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET REGNET System Operation – D9.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1. 2 Objectives Become familiar with the purpose and features of Epsilen Learn to navigate the Epsilen environment Develop a professional ePortfolio on.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Break Time Remaining 10:00.
Chapter 5 – Enterprise Analysis
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
AEMCPAGE Relaunch 1 June 2009.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
July 31, Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
GEtServices Services Training For Suppliers Requests/Proposals.
2004 EBSCO Publishing Presentation on EBSCOadmin.
: 3 00.
5 minutes.
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
To the Assignments – Work in Progress Online Training Course
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Clock will move after 1 minute
PSSA Preparation.
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
South Dakota Library Network MetaLib User Interface South Dakota Library Network 1200 University, Unit 9672 Spearfish, SD © South Dakota.
Presentation transcript:

Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group

January 2002REGNET Project Team Meeting Content Group 2 Overall Agenda Monday, Tuesday, : :00 Opening, Agenda (IMAC) 15: :15 Status reports (All partners) 16: :45 Data input issues (IMAC, TARX) 16: :15Coffee break 17: :30 Data input issues (IMAC, TARX) 17: :30Special partner projects (ICCS, IMAC,...) 9: :00 Theme-based work - Introduction (TARX, IMAC) 10: :45 Individual themes (IMAC, TARX, theme leaders) 10: :15 Coffee Break 11: :00Working groups 13: :40Lunch Break

January 2002REGNET Project Team Meeting Content Group 3 Overall Agenda Tuesday, : :45 Data input tutorial (AIT) 16: :15Coffee break 17: :30 Data input tutorial (AIT) 17: :30Results of working groups (all partners) Open round (all partners) Next steps (IMAC) The main goals: 1. Clarify open questions regarding the data formats & usage of templates 2. Introduce and explain availabe tools for data input 3. Working on themes in order to start the construction of topic maps

January 2002REGNET Project Team Meeting Content Group 4 Detailed agenda 1st day Monday, : :15 Status reports (about 10 minutes per partner) SUL/KVA/NRM/LMG, MUS, MECH, ONB, ICCS, GRAN, CC/New italian partners, ALI 16: :45 Data input issues Solving the mystery: Usage of the templates for fragment generation, some examples (TARX) 16: :15Coffee break 17: :30 Data input issues Data structures, standards & concordances (IMAC) 17: :30Special partner projects Presentation of Z39.50 Server (ICCS) DSK Test data (IMAC)....

January 2002REGNET Project Team Meeting Content Group 5 Our workplan for the next 2 days Envisaged results Record the actual status of your work - solve problems and plan the next steps (adaption of the timetable - if necessary) Introduction of and training in using the data entry tools, formulate further needs Finish the work on theme structures, decide upon and define concrete contributions (and schedule them) Use face-to-face communication for discussion & share expertise

January 2002REGNET Project Team Meeting Content Group 6 Status reports Part 1: Status reports [all partners] 15: :15 Please give a short presentation: - work done & actual status - main achievements - most important problems - critical points -... Swedish partners MUS MECH ONB ICCS GRAN IAT CC ALI IAT

January 2002REGNET Project Team Meeting Content Group 7 Data input issues Part 2: Data input issues [TARX, IMAC] 16: :30 Coffee break 16: :15

January 2002REGNET Project Team Meeting Content Group 8 The fragment templates The problem with the templates for fragments - solving the mystery Some examples in order to show the usage of the templates TARX

January 2002REGNET Project Team Meeting Content Group 9 The fragment templates Another example - object description Information about the record (some of these fields will be generated automatically if using an electronic system) Information about the object and its content (equivalent to domain-specific data dictionaries, could be adapted to your needs)

January 2002REGNET Project Team Meeting Content Group 10 Data structures & concordances The basis: content examples (object descriptions) SULBooksExport from Libris Marc/Marc21 Smaller unitsno examples Metadata Scheme (Dublin Core ?) ICCSArtworksRegistration by artists (paper) Dublin Core data + For demo purposes: usage of minimal data set for selling templates, Z39.50 Server purposes ALIArchive objectsRegistration by using the Own data structure templates MUSMuseum objectsExport from collection Spectrum management system (Museum System) ONBArchive objectsField list for photgraphies, object descriptions on the basis of the template

January 2002REGNET Project Team Meeting Content Group 11 Data structures & concordances The basis: Content examples (object descriptions) GRANArtworksField list available (registration form for artists) MECHMuseum objectsObject descriptions (fragment Meta data set template) NRMMuseum objectsField list available What is missing? Content examples from other partners (mapping to standards and DC) Examples of other content types (especially shop items) Delivery of all content already available => Registration tools / delivery methods ?

January 2002REGNET Project Team Meeting Content Group 12 Data structures & concordances Analysis of data Step 1: Mapping to domain-specific standards (if necessary) Library MARC / MARC 21 Archive ISAD (G) EAD Museum AMICO CDWA institute/standards/cdwa CIDOC Artwork Machine Readable Cataloguing General International Standard Archival Description Encoded Archival Description Art Museums Image Consortium International Standard for Museum Object Information Categories for the description of Works of Art Background information: D2

January 2002REGNET Project Team Meeting Content Group 13 Data structures & concordances Analysis of data Step 1: Mapping to domain-specific standards - an example Object ID Fields used by partners [MUS, DSK, MECH/TARX, NRM] AMICO field Owner accession number Object Name Object category (MUS) (DSK, e. g. painting, graphic) Object type Material Material/technique Medium (MUS) (DSK) (Fragment) Dimensions Measurement Dimension (MUS) (DSK, dimension/ (MECH) measurement/unit) Attributes Iconographic Keywords (MUS =>AAT) categories & (Fragment) description (DSK) Material/technique - terms - text Dimensions - unit - value Subject Matter - terms - text

January 2002REGNET Project Team Meeting Content Group 14 Data structures & concordances Analysis of data Step 1: Mapping to domain-specific standards - an example Location Institutional holder (MUS) (DSK, name/address/person Fields used by partners [MUS, DSK, MECH/TARX, NRM] AMICO field Owner name Owner place Related works Related documents Related images... Related Works Reproductions Links Media Inform. Digital Images (Fragment) References... (DSK) (MUS) Actual mapping results: Crosswalk document (AIT) Details could be given during the tutorial To Do: Proove & finish mapping!

January 2002REGNET Project Team Meeting Content Group 15 Data structures & concordances Step 2: Mapping to Dublin Core for cross-domain search ( Analysis of data The Dublin Core Elements Content elementsIntellectual property elementsInstance TitleCreatorDate TypePublisherFormat DescriptionContributorIdentifier SubjectRightsLanguage Coverage Source Relation

January 2002REGNET Project Team Meeting Content Group 16 Data structures & concordances Step 2: Mapping to Dublin Core - an example Analysis of data Museum data [partners, CIDOC, MDA, AMICO] Object categoryResource type Object measurementFormat Creator (artist,...)Creator KeywordsSubject OwnerPublisher Copyright statementRights... For details: Crosswalk document (AIT) To Do: Completion of mapping (use of all fields, for all domains), proove actual mapping attempts

January 2002REGNET Project Team Meeting Content Group 17 Data structures & concordances First draft of data structure of the REGNET system: RN_T220v01_AIT_data_structure Simplified overview - What is it all about? SULMECHGRAN... Content Provider Standards MARC CDWA Cross-domain searching (Z39.50)... DC Metadata format Publishing by converting to XML (using available DTDs) First version of data entry tool Content provider tutorial

January 2002REGNET Project Team Meeting Content Group 18 Special partner projects Part 3: Presentation of special partner projects [ICCS, IMAC, new partners in the projects,...] 17: :30

January 2002REGNET Project Team Meeting Content Group 19 The Swiss data base of cultural heritage No mapping to domain-specific standard 1. Dublin Core Mapping 2. Converting in XML (7000 records) 3. Adaption of an existing system (XML-databased) for information retrieval 2. Analysis & Preparation of data 1. The data base Art works located in 3 museums - Museo cantonale darte, Lugano - Musée d art et dhistoire, Genève - August Deusser Museum, Bad Zurzach About objects, some with digital images. Available for demo purposes within REGNET.

January 2002REGNET Project Team Meeting Content Group 20 The Swiss data base of cultural heritage Data fields used in the data base Object data ID, title, institution, further titles, physical description, object category, date (creation), material/technique, measurement, inscriptions, iconographic description, iconographic categories, object source information. Related object information Photographic reproductions, digital image, bibliography Ownership information Owner (person, institution) Information about object condition Restauration report, location of restauration Could be a good reference model for museums! Standard: Documentation standard for collections (DSK, 1996). Documentation information Record ID, recorded by, date. Artist information Artist name, Birth place, Death place, Death date, Activity period, nationality, profession, copyright statement Geographic and personell subject Owner (person, institution) Online Demo?

January 2002REGNET Project Team Meeting Content Group 21 Sample data ICCS - Z39.50 Server Sample data - Z39.50 Server ICCS E. g. New partners in the project... [open for your contributions] Others relevant developments

January 2002REGNET Project Team Meeting Content Group 22 Agenda 2nd day Tuesday, : :00 General issues theme-based work Procedures for quality control and improvement of document management & communication (IMAC) Status of topic map development (TARX) 10: :45 Individual theme - status & needs Results available for individual themes, needs and open questions (TARX, IMAC, theme leaders) 10: :15Coffee break 11: :45 Working in smaller groups Working groups on special themes 13: :40Lunch break....

January 2002REGNET Project Team Meeting Content Group 23 Agenda 2nd day Tuesday, : :45 Data input component A tutorial for the content providers (AIT) 16: :15 Coffee break 17: :30Data input component [continuation] Discussion, next steps 17: :30 Results & next steps Results of the intermediate work done in smaller groups. Set up of a referential document in order to start the construction of topic maps. Open round: questions, next steps. Reporting.....

January 2002REGNET Project Team Meeting Content Group 24 Agenda 2nd day Tuesday, Revised agenda 9: :00 Opening Summary of the 1st day: Open questions. General Remarks. (IMAC, all partners) 10: Data input tutorial/REGNET data structure Tutorial for the content providers (AIT) 10: :15Coffee break 11: Data input tutorial/REGNET data structure Tutorial for the content providers (AIT) Discussion. What must be done to fulfill all needs? 12: :00 Working on Themes Status of theme-based work (IMAC) Topic map development: An example (TARX) Results available for individual themes, needs and open questions (TARX, IMAC, theme leaders)....

January 2002REGNET Project Team Meeting Content Group 25 Agenda 2nd day Tuesday, Revised agenda ? 13: :40Lunch break 14: :00 Working on themes Working groups on special themes 16: :45Results of working groups Results available for individual themes: adapation, needs and open questions. Set up of a referential document in order to start the construction of topic maps. (All) 16: :15Coffee Break 17: :15Summary & Open Round Organisation Issues (Document management & communication). Reporting & Next Steps. Discussion & presentation of special partner projects

January 2002REGNET Project Team Meeting Content Group 26 Results of the days must be... Status about the existing products List of data which could be processed (individual) demos ? Status of clarified issues & not solved issues Input from technical group discussion(s) / data input issues Results of theme work groups Main achievements, working plan, progress in coordination work, timetable? Definition of possible new products (discussion) Reporting & organisational issues

January 2002REGNET Project Team Meeting Content Group 27 Theme-based work Part 1: General issues [IMAC, TARX] 9: :00

January 2002REGNET Project Team Meeting Content Group 28 Management issues The process of content production (actual state) 1. Generate documents (fragments, samples,...) 2. Collection & distribution through coordinator Thematic ContentOther documents Validation, feedback,Analysis, distribution modification 3. Publishing on the server The content production - Quality control & document management Actual status: all documents related to WP 2.1 published on the server. Exception: no thematic content.

January 2002REGNET Project Team Meeting Content Group 29 Management issues Editorial Group Constituted by 5 partners: 3 of 5 should check the delivered content 1 Person: IMAC (or) TARX 2 Persons: SUL, CC, MUS Tasks of the editorial group 1. Decision on themes to be addressed 2. Assuring that sufficient aspects of a theme are covered 3. Approaching partners with requests for additions to themes 4. Monitoring the terminology that is being used Volunteers are welcome, members are: SUL/KVA, TARX, MUS, (IMAC) Step 1: Introduction of an editorial group Only a control of homogenity of thematic products!

January 2002REGNET Project Team Meeting Content Group 30 Management issues Alternative 1: Stick to the old method 1. Distribute content to editorial group 2. Publishing by Gerda after validation Step 2: Decision about publishing method IMAC could coordinate the process! Alternative 2: Direct upload (Load Area) 1. Using the load area for direct upload 2. Information of partners using /forum 3. Publishing in official section after validation ( to Gerda) Alternative 3: Using document server Availability through search,meta data!

January 2002REGNET Project Team Meeting Content Group 31 Management issues Alternative 3: Using the document server Step 2: Decision about publishing method 1. Describing document 2. Uploading document 3. Information per / forum Using the official section only for general & central documents (guidelines, summaries,...) Online Demo?

January 2002REGNET Project Team Meeting Content Group 32 Management issues 1. Access: 2. Work Area A: Content Engineering 3. Login: family name (member), company short name (password) Instrument: The project forum Step 3: Improve communication - Share knowledge

January 2002REGNET Project Team Meeting Content Group 33 Management issues The project forum - suggestion for the usage Step 3: Improve communication - Share knowledge One subject for all general aspects One subject for editorial group issues Per theme: one subject moderated by theme leader - General information about the theme - Links/hints to most important documents - Discussion of modifications, contributions, etc. In general: each partner is allowed to generate new subjects in order to discuss problems (automatic notification of participants) Online Demo?

January 2002REGNET Project Team Meeting Content Group 34 Status theme-based work - Topic map development An overview about the topic map development (proposal) TARX

January 2002REGNET Project Team Meeting Content Group 35 Theme-based work Part 2: Individual themes [IMAC, TARX, Theme leaders] 10: :45 Coffee break 10: :15

January 2002REGNET Project Team Meeting Content Group 36 Overview themes and status Theme-based work - A status report Tour dHorizon Theme scheme & relations to other themes, List of relevant fragments Saints Theme scheme, fragments, object descriptions (MECH/TARX), coordination started (?) Masks & Amulets Theme scheme/guidelines (fragments to be written), coordination started (?) Decision about fragments for 1st phase, deadlines Coordination with partners (MUS, ALI, LMG, ONB) Committment by others about contributions (ALI), finalising theme structure Status To Do

January 2002REGNET Project Team Meeting Content Group 37 Overview themes and status Theme-based work - A status report Art Galleries Outline of related topics, indepth considerations for regional aspects (ICCS, GRAN) Linnaeus Theme structure & guidelines prepared, coordination started (?) Habsburg Conceptual work on sub- theme Sissi (ONB) Decision about sub-structures, suggestions for further (regional aspects), draft for an overall scheme (?) Coordination with partners (ALI, MUS, ONB), decision about concrete contributions Discussion/coordination about other aspects by analysing possible contributions of partners (IMAC, MECH, ALI) Status To Do

January 2002REGNET Project Team Meeting Content Group 38 Overview themes and status Theme-based work - A status report Measuring Theme scheme/guidelines (fragments to be written), coordination started (?) Early Renaissance Working on fragments, in Europe coordination of italian partners in progress Leather Theme schemes/guidelines, fragments (MUS), coordination started (?) Gilt Leather Theme structure, fragment list, coordination started (?) Committment by others about contributions (KVA, MECH), finalising theme structure Theme structure and fragment list, coordination with partners (MECH) Merging with Gilt Leather, coordination (MECH) Merging with Leather (MUS) Status To Do

January 2002REGNET Project Team Meeting Content Group 39 Overview themes and status Theme-based work - Presentation of individual themes For each theme: topic map layout, contributions by partners (optional), discussion TARX/IMAC/theme leaders

January 2002REGNET Project Team Meeting Content Group 40 Tour dHorizon 1. Introduce the theme Aim of the topic 2. Description of whole collection Short description (D1) 3. Description of museum/institution Institutional information 4. Description of objects 5. Description of artists Related: - Regional aspects (e. g. Swiss art) - Thematic aspects (thematic focus of collection) - Formal aspects (object types in the collection object categories) Useful fragments

January 2002REGNET Project Team Meeting Content Group 41 Theme-based work Part 3: Working in smaller groups [all partners] 11: Lunch break 13: :40 Please: - work on open issues - decide upon contributions & deadlines - prepare a short presentation for the last session

January 2002REGNET Project Team Meeting Content Group 42 Theme-based work Part 4: The data input component [Tutorial for the content providers] 14: :30 Coffee break 16: :15

January 2002REGNET Project Team Meeting Content Group 43 Data input issues Part 5: Results & next steps [all partners] 17: :30

January 2002REGNET Project Team Meeting Content Group 44 Results of working groups Reporting: D4 Available Content and Products Updated status reports Must be provided by all partners (in a format suitable for publication) Sample data (the collections) Data formats, mapped to standards and Dublin Core (prooved & finished) Thematic products Detailed description of individual themes (theme leaders), corresponding topic maps Overview about potentials in the future What could be provided in the next months (by each partner), extension of products IR 2.1 D4