Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group 2002-01-28 - 2002-01-29.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Bellwork If you roll a die, what is the probability that you roll a 2 or an odd number? P(2 or odd) 2. Is this an example of mutually exclusive, overlapping,
Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 3: Content Testing.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 1: Usability Testing.
Cultural Heritage in REGional NETworks REGNET Status of Task 2.1 Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Cultural Heritage in REGional NETworks REGNET Den Haag Meeting (RN-PTG014) 21-22/11/2002.
Cultural Heritage in REGional NETworks REGNET PCM.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Status of WP 2 / WP 3 Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Auction System.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP 7 - Management Task 7.1 – Project Management Task 7.2 – Quality.
Cultural Heritage in REGional NETworks REGNET. June 2002 Content status presentation MUSEON MUSEON Status of the content production MUSEON Status of the.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Facebook Part III How to Use the Features of Facebook Patrick Therrien Technology & Education Training Specialist.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
ZMQS ZMQS
Photo Composition Study Guide Label each photo with the category that applies to that image.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Chapter 15 Integrated Services Digital Network ISDN Services History Subscriber Access Layers BISDN WCB/McGraw-Hill The McGraw-Hill Companies, Inc., 1998.
O X Click on Number next to person for a question.
© S Haughton more than 3?
VOORBLAD.
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
© 2012 National Heart Foundation of Australia. Slide 2.
Data Management Seminar, 8-11th July 2008, Hamburg Survey System – Overview & Changes from the Field Trial.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Chapter 5 Test Review Sections 5-1 through 5-4.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
PSSA Preparation.
Presentation transcript:

Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group

June 2002REGNET Project Team Meeting Content Group 2 Additional Content Generation Types of additional content to be generated / uploaded to the system News / Newsletter Collection Profile Address Events Links Vocabulary login: regnet password: member

June 2002REGNET Project Team Meeting Content Group 3 Address mask, part 1

June 2002REGNET Project Team Meeting Content Group 4 Address mask, part 2

June 2002REGNET Project Team Meeting Content Group 5 Collection section

June 2002REGNET Project Team Meeting Content Group 6 Event mask, part 1

June 2002REGNET Project Team Meeting Content Group 7 Event mask, part 2

June 2002REGNET Project Team Meeting Content Group 8 Link mask

June 2002REGNET Project Team Meeting Content Group 9 News mask, part 1

June 2002REGNET Project Team Meeting Content Group 10 News mask, part 2

June 2002REGNET Project Team Meeting Content Group 11 Newsletter mask, part 1

June 2002REGNET Project Team Meeting Content Group 12 Newsletter mask, part 2

June 2002REGNET Project Team Meeting Content Group 13 Profile mask, part 1

June 2002REGNET Project Team Meeting Content Group 14 Profile mask, part 2

June 2002REGNET Project Team Meeting Content Group 15 Vocabulary mask

June 2002REGNET Project Team Meeting Content Group 16 All Types mask

June 2002REGNET Project Team Meeting Content Group 17 To Do`s in Sofia To define in each of the forms: Are the fields sufficient ? Which fields should be added, which can be deleted ? To define/to discuss: Should further object types be added (and defined)? Which types of information should be available in which languages ? How many items of information are needed ? Who can contribute which types of content ? Content Collection Plan

June 2002REGNET Project Team Meeting Content Group 18 To Do`s after Sofia Content gathering and tracking / Content QA Which types of information are available in the institutions? In what data format? In which numbers? How much data has to be generated or acquired to augment existing or create new data? Where can additional data be acquired ? How much content is loaded onto the system ? How much content is QA´d ? What is the status on content collection, translation, upload, verification etc. Status can be tracked using the content status tracker >> What we have: A content status tracker

June 2002REGNET Project Team Meeting Content Group 19 Content Tracking for Content Partners Working in groups