AIR OPERATOR CERTIFICATION
AIR OPERATOR CERTIFICATION PROCESS Pre-application Formal Application Preliminary financial, economic, legal assessment Preliminary technical assessment Operational Inspections Decision - AOC and Ops. Specs
PRE-APPLICATION Phone call or letter Meet to ensure clear understanding of requirements Provide Appendix “A” Information for Prospective AOC Applicants Review Appendix “A”
FORMAL APPLICATION All about the Company Information on Flight Operations Compliance with Regulations - Workplan Financial Data Start Date
PRELIMINARY ASSESSMENT FINANCIAL/ECONOMIC/LEGAL Sufficient financial resources Route structure for the operation Levels of service and public interest Bilateral agreements Traffic studies - economically viable Management structure/personnel, equipment, facilities, etc...
PRELIMINARY TECHNICAL ASSESSMENT-DOCUMENTS REVIEW Manuals : AFM/AOM Maintenance Manual Operations Manual Flight Attendant Manual MEL/CDL FO/Dispatch Weight and Balance Route Manual Training Manual Dangerous Goods Manual Meet often with company officials Volume 2 - detailed assessment criteria-
DETERMINATIONS Are aircraft suitable ? Does the applicant have the ability ? Route/areas suitable for navigation Responsibility for regulatory requirements Organisation/personnel adequate and duties described Advise, counsel, explain and document, document, document
OPERATIONAL INSPECTIONS FOR CERTIFICATION Organisational Structure Operational Control Inspection Training Programme Inspection Training and Qualifications Records Flight and Duty Time Records contd
OPERATIONAL INSPECTIONS FOR CERTIFICATION Station Facility Inspection Emergency Evacuation Demonstration Ditching Demonstration Proving Flights - including Enroute Cockpit and Cabin Inspections
ORGANISATIONAL STRUCTURE EVALUATION Preliminary - determine that defined Now determine that understood/implemented Interviews and Observations Clear Lines of Authorities
OPERATIONAL CONTROL INSPECTION Flight Operations Officer requirements Flight Planning Flight Following
TRAINING PROGRAM INSPECTION Direct Control or Contract Detailed Review of Syllabus, facilities Qualifications of Ground and Flight Instructors Focus on initial training for now
RECORDS INSPECTION Operational and Flight trip Records - min 3 months Flight and Duty Time Records - System required Training and Qualification Records
OTHER REQUIREMENTS Station Facility Inspection Emergency Evacuation Ditching Demonstration Proving Flights Discussed in Detail Later
ISSUANCE AOC AND OPERATIONS SPECIFICATIONS Scope of Applicants Operation Adequacy of Organisation and Resources Adequacy and Effectiveness of Policies/Directives Willingness to Implement Regulations
AOC AND OPERATIONS SPECIFICATIONS Name, location, date of issue, validity period, types of operation, types of aircraft, authorised area of operation Ops. Specs. - General Provisions, En-route Authorisations, Aerodrome, Maintenance, Mass and Balance, Interchange of Equipment, Aircraft Leasing