Results from the PMT test bench in BCN (10-Oct-03) J.Garra, R.Graciani, E.Graugés, X.Xirgu.

Slides:



Advertisements
Similar presentations
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
Advertisements

PMT Calibration / Greenhouses Bryan Musolf. PMT Calibration.
Performance of MPPC using laser system Photon sensor KEK Niigata university, ILC calorimeter group Sayaka IBA, Hiroaki ONO, Paul.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Digital Hadron Calorimeter Cosmic Ray Test Stand.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
ابزاردقیق ارائه دهم. The device has 2 input ports, named inverting ( - ) input and non-inverting (+) input. The output is simply an amplified signal of.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
PMT Calibration Bryan Musolf. Goals Transform raw data into graphs for 30 PMTs Observe how the gain and # of photoelectrons (PE) change as a LED intensity.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
Simonetta Gentile, LCWS10, March 2010, Beijing,China. G-APD Photon detection efficiency Simonetta Gentile 1 F.Meddi 1 E.Kuznetsova 2 [1]Università.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
Calorimeter calibration -Initial calibration -Gain following -Archiving.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Fumihiko Ukegawa University of Tsukuba, Japan 6th Joint Korea-Japan ScEcal Meeting September 3, 2010 Kobe University Photo-sensor studies.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
PMT measurements in Antares Oleg Kalekin on behalf of Antares collaboration VLVnT 2011 Erlangen
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
HAPPEX/Lumi PMT Studies Luis Mercado UMASS 7/10/09.
Physics 434 Module 4 - T. Burnett 1 Physics 434 Module 4 Acoustic excitation of a physical system: time domain.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Sohail Musa Mahmood on behalf of SAMPA team and Norwegian group SAMPA linearity test results SAMPAmeeting
E. Picatoste, D. Gascon PMT afterpulsing and SPD trigger 1 Looking to the problem from the instrumentation point of view LHCb Calorimeter Meeting – CERN.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
5-1-2 Synchronous counters. Learning Objectives: At the end of this topic you will be able to: draw a block diagram showing how D-type flip-flops can.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
LED notched fibre distributing system Calibration system for SiPM
PreShower Characterisations
Why we need an improved LASER calibration system
Pre-calibration of PM gain by photo-statistics
T980 STATUS AND CHANGES FOR
The High Dynamics Readout of PMT for BGO Calorimeter
JMU Dark Current Tests By: Kevin Nash.
Acceptance test at Duke
Hybrid MPGD based photon detector, R&D update.
Rafael Ballabriga Suñé Xavier Xirgu Aleixandre
ScECAL+AHCAL+TCMT Combined Beam FNAL
Department of Physics and Astronomy,
MPPC for T2K Fine-Grained Detector
Photomultiplier (PMT) Tubes
Presentation transcript:

Results from the PMT test bench in BCN (10-Oct-03) J.Garra, R.Graciani, E.Graugés, X.Xirgu

8 stage PMT CFD base: The output of 1 channel studied to perform a premilinary analysis on: Signal Shape Gain Number of photo-electrons

CFD active base

Signal Shape Some oscillations in the signal shape are supposed to be caused by some connection(?) problem.

Gain vs Photo-Statistics Possible saturation effects might be observed starting around 50 phe and above

Gain Our desired HV working point should be ~ 600 Volts obtaining an approximate gain of 30k to 50k

8 stage PMT BCN base: A preliminary study has been performed with a LED source (no fibre) Gain and Photo-statistics have been looked at from the output of a 1 channel (#64) Now the setup is ready to get measurements for all the channels at once. Fatal accident ended up with the 8-stage PMT becoming unusable anymore

BCN active base

Signal Shape

The oscillations present in the first attempt (CFD) could be partially removed (with the BCN base) by when the setup has been re- done very carefully and assuring a common grounding for the (ADC/Black Box/Active Base) system. Still to be tried if that also cured the oscillation observed using the CFD base

12 stage PMT This PMT has already incorporated the active base by Hamamatsu together with the (PMT/Base) system encapsulation Scans of 50x50 measurements each have been performed for different angles to ensure the geometrical consistency of the setup (PMT plane parallel to the fiber scaning plane): 0,90,180 and 360 deg. scans Also scans with different light intensities have been taken to test the uniformity in the linear response of each channel.

2D Scans Different angles Different light I

To do list Let the new team get more experienced Complete a final version of the fine scans (Motor lost steps, etc…). Understand any the level of saturation of the signal Single photo-electron measurement using a 2-stage amplifier board (work in progress)