Integrated Gas Box System(IGS)

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Automation and Drives A&D CD CC PM5 SIGNUM Pushbuttons and pilot lights SIGNUM 3SB3: pushbutton and pilot light´s Pilot devices 22 mm.
ZH and ZR Connectors To introduce the ZH crimp style and ZR insulation displacement wire-to-board connector series.
ASF Leak Detectors – New Design Präsentation neuer LAG Newsletter.ppt 1 After our previous device models are used for nearly four decades in more than.
Khaled Mostafa, ABB Electrical Industries, Nov. 2012
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Process Analyzer Sampling with Astute System IFPAC 2008 – Baltimore January 29,2008.
The Swagelok® SSV Series Stream Selector System for Process Analyzer Applications Swagelok introduced the next generation of stream selection technology.
ADX 150 – Engine Repair ADX 170 – Climate Controls
Engine & Transport Integrated Cooling Systems. © Alfa LavalSlide 2 Alfa Laval Integrated Cooling Systems, ALICS Integrated marine cooling.
Refrigerators.
© 2003 Swagelok Company HF Series Compact, High Flow Gas Regulators.
Hydraulic Power Assist
The Swagelok® SK series and AFS Multipurpose Ball Valves
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Optimization For Existing Tilting Pan Filters Metalcraft.
Components for the low- maintenance switch Components for the low maintenance track Schwihag RBH system.
© 2003 Swagelok Company Ultrahigh-Purity Gas Filters SCF Series.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
© 2003 Swagelok Company MPC Series Modular Platform Components.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
Universal Microsystems, 3350 Scott Blvd. Bldg 47, Santa, Clara, CA Universal Microsystems Gas Flow Restrictors for the Semiconductor Industry Company.
μMS³ μModular Substrate Sampling System μMS³ μ Modular Substrate Sampling System.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Instrumentation Surface Mount Technology for Process Analytic Sampling Systems Steve Doe, Parker Hannifin Corporation.
January 22, Advanced Modular Sample System Richard E. Hughes.
© Swagelok Company, 2006 IFPAC Miniature Modular Stream Selection Valves Switching Valve CPAC NeSSI Workshop May 11, 2006.
Fluid Components for Small, Smart, Sampling Systems Kevin Mracek.
Instrumentation January 22-25, 2002 San Diego, California, U.S.A IFPAC SM 2002 Sixteenth International Forum Process Analytical Chemistry SM Surface Mount.
© Swagelok Company, 2006 IFPAC IFPAC Advancements in Double Block-and-Bleed Performance and Reliability David Simko and John Wawrowski Swagelok Company.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
Smart, Modular Sample Systems What’s in it for us Dan Podkulski.
MINIATURE MODULAR SAMPLE SYSTEMS – FROM CONCEPT TO REALITY David M. Simko, Swagelok Company Pittcon®2002 New Orleans, March 20, 2002.
AT-LINE A Practical Application of Smart Modular Sampling Components IFPAC 2001 ABB.
ST9120U1003 Universal Electronic Fan Timer Training Module
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Jigs and Fixtures.
Design Group: Wei-Yuan Chu Adrian Conrad Thomas Hylton Scott Jean Nicholas Metzger IUPUI Faculty Advisor: Dr. Jie Chen Rolls-Royce Advisor: Timothy Fuesting.
© 2004 Swagelok Company igc ™ II Modular Surface-mount Design Design.
D-M-E Hot Runner Solutions D-M-E Hot Runner Capabilities.
ME421 Heat Exchanger and Steam Generator Design Lecture Notes 6 Double-Pipe Heat Exchangers.
“Fix Tube Sheet” Heat Exchanger
Making a PCB Report and ppt – presentation 1.)Structure 1.1)Making the PCB 1.2)Assembling a circuit )The components I choose )They functions.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Houston Material Handling Society October 2008 Baghouse Cleaning Control Presented by: T.J. Winalski.
Ejector with Pad ZHP Series Confidential Internal use onlyConfidentialConfidential.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
November 1, Advanced Modular Sample System Richard E. Hughes.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
IPC Standard Surface Mount Requirements Automatic assembly considerations for surface mounted components are driven by pick-and- place machines.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Checking Engine Compression Lab # 4. Checking Engine Compression As we learned earlier in the course four stroke gasoline engines develop compression.
Titre Drawbacks of standard fittings Dead Volume. Gaskets Particle Generation Twisting of Tubes Male / Female Parts Inventory Welding Panel Design Assembly.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Glass Patio 51 Full glass balcony system
CANTY QUICKPORTS™ “How they work”
Optimum Pump Performance for Process Applications
Liquid Gasket Suported by.
Husky Injection Molding Systems
Circor Synergies Quality Valve Products Excellent Design Engineering
Plate Heat Exchanger (PHE)
SHANGHAI ROTORCOMP COMPRESSOR ONLY USE.
Floating Head Heat Exchanger
NEW Slip In Cartridge Valve Series
Combined Heat and Power System
880V 21/2”-10”.
NEW Slip In Cartridge Valve Series
Fluid Components for Small, Smart, Sampling Systems
Presentation transcript:

Integrated Gas Box System(IGS) 목 차 검토 의견: Why IGS must be used ? 기본 구성 차이 Kinetics Benkan Fujikin Flow Path 비교 Seal Type 비교 기술 검토서 기 안 검 토 승 인 결재 직위/성명 양승윤DL 일 자 보존년한 보안등급 ’01年 06月 029日 300mm 팀

1. Why IGS must be used ? ◈ Kinetics ◈ Benkan ◈ Fujikin ▶ Smaller →Reduces gas systems footprint by up to 50% ▶ Better →Improves reliability, maintainability, leak integrity and dry-down time ▶ Faster →Reduces assembly time by 50% ▶ Cheaper →Saves up to 33% in installation Cost of facility gas systems ◈ Benkan ▶ 유지 보수의 용이성 ▶ 최소의 밀폐부위, 경량화, 소형화 ▶ 최소의 구성 부품수, 생산 기간 단축 ▶ 경비 절감 ▶ Line-Heating의 용이성 ▶ 고성능성, 신뢰성 향상 ◈ Fujikin ▶ Improve Basic Technology →Safety and Clean Technology ▶ Miniaturization → Use of UPG & W-Seal Technology → Reduce Size of Actuator( 35mm to 25mm) ▶ Increase Reliability → Use of UPG & W-Seal Technology ▶ Simple to Make & Maintain → All Top Mount Components → Uniform Connections → Easier to Heat ▶ Promote Standardization → Full Line-up of Standard Components → Standardize Design & Assembly with Flexibility → Reduce Leadtime with Standard Parts ▶ Cost Reduction → Reduced Overall Cost Through Standardization, Increased Reliability, and Ease of Assembly. What is the difference between "modular," "topmount" or "surface mount" gas systems? The words "topmount" and "modular" and "surface mount" have slightly different meanings but, in common usage when referring to semiconductor gas systems, they all refer to the same type of system.  The most common usage is either "modular surface-mount" (MSM) or "topmount." 

1. Maker별 기본 구성 차이 Kinetics Benkan Fujikin Valve (Component) Sealing Block Base Plate ◈ Valve(Component) *. Valve Maker에서 IGS에 따라 별도 제작함 *. 고정부:(2가지 Type) - Bolt 4개로 고정형 - Valve에 나사산이 있어 직접 체결되는 방식:Benkan(Center Lock System) ◈ Sealing *. Valve부와 Block간의 연결 Point *. Maker별 차이 - Kinetics : C-seal - Fujikin : B-seal - Benkan : VCR-Type(기존 방식) ◈ Block *. Valve와 Valve의 연결 통로가 구성되어 있음. - 용접형과 비용접형이 有 *. Heating Point ◈ Base Plate *. Block들을 고정시켜 주는 역할

2. Kinetics ▶ IGS →K1S ▶ C-Seal ☞ IGS : Integrated Gas System(UNIT社) ☞ K1S : IGS의 45% Shrink Block간 연결 Gasket 제거

3. Benkan ▶ BIS →BIS-f ▶ VCR-Type Gasket ☞ BIS : Benkan Insert System ☞ BIS-f : New version -. Only Benkan Valve -. Needs Special Valve Fixing Tool -. Valve를 회전시켜 고정 -. Cross Connecting : 상부 -. MFC의 경우 기존 VCR Gasket사용

4. Fujikin ▶ Why choose the Fujikin W-Seal and IGS? • 100% Top-Mounting • Reduced Number of Sealing Points • Highly Configurable • Only One W-Seal Gasket Type Required

5. Flow Path 비교 Kinetics (K1S) Fugikin (IGS) Benkan(BIS)

6. Seal Type 비교 Kinetics (K1S) Fugikin (IGS) Benkan(BIS) -. Dead Space 無

7. IGS 기술 검토서