Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.

Slides:



Advertisements
Similar presentations
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
RMP Dioxin Strategy Susan Klosterhaus Sources Pathways and Loadings Workgroup Item #9.
Concentrations and loads of PCBs and OC pesticides in the Guadalupe River watershed Jon Leatherbarrow 1,2, Lester McKee 1, John Oram 1 1 San Francisco.
Suspended Sediment Loads from Bay Area Small Tributaries Mikolaj Lewicki and Lester McKee Sources Pathways and Loading Workgroup May 14 th 2008 Item #3a.
1 PCBs and PBDEs on the Guadalupe River WYs 2003 – 2006 John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings Workgroup November.
High Flow Studies (WY 2005) Lester McKee Sources Pathways and Loadings Workgroup.
Pollutant Loads to the Bay: Measuring the L in TMDL Lester McKee Sources Pathways and Loadings Workgroup and Watershed Program Manager SFEI RMP Annual.
Item #4 Slide 1 A Mass Budget of Polybrominated Diphenyl Ethers in San Francisco Bay, CA John J. Oram, Lester J. McKee, Christine E. Werme, Mike S. Connor,
Comparative Analysis of Loads of Mercury in Coyote Creek and Guadalupe River Lester McKee RMP SPLWG Chair San Francisco Estuary Institute
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
Mercury Transport to San Francisco Bay through the Sacramento-San Joaquin River Delta. Nicole David, Lester J. McKee, Jon E. Leatherbarrow December 15,
River Loads The Mallard Island Study Nicole David, John Oram, Lester McKee, SFEI Russ Flegal, UCSC.
1 PCB and PBDE loads at Mallard Island on the Sacramento River: WYs John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings.
RMP Program Objectives & Management Questions Question 3: Describe sources, pathways, loadings, and processes leading to pollutant-related impairment in.
Progress in Estimating Loads at Mallard Island Nicole David Lester McKee Item #4.
1 Guadalupe Small Tributaries Loads Study WYs (PCBs and PBDEs) John Oram and Lester McKee Sources Pathways and Loadings Workgroup November 13 th.
Mallard Island and the Largest Flood Event Since 1997 Nicole David Lester McKee San Francisco Estuary Institute.
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Multiplication and Division
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Break Time Remaining 10:00.
Fixed and Variable Costs. Median income per household member in the U.S. in 2006 was in the range from: 1)$15,000-20,000 2)$20,000-25,000 3)$25,000-30,000.
PP Test Review Sections 6-1 to 6-6
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Multiplication Tables Test 3 and 5 Times Tables 3 and 5 times tables There are 10 questions. Each one will stay on the screen for 15 seconds. Write down.
Money Matters First Grade Math 1. What coin is worth $0.01? 1.Penny 2.Nickel 3.Dime.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Slippery Slope
: 3 00.
5 minutes.
Analyzing Genes and Genomes
Let’s take a 15 minute break Please be back on time.
Essential Cell Biology
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Clock will move after 1 minute
Intracellular Compartments and Transport
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
A Watershed Year for RMP & CEP: Sources Pathways & Loadings 2002/03 Lester McKee & Jon Leatherbarrow May 2003.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 6 th 2010 Rand Eads RiverMetrics.
Sources, Pathways, and Loadings Regional Monitoring Program for Trace Substances Annual Meeting, March 23 rd 2002 Lester McKee Watershed Program Manager.
Presentation transcript:

Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4

SPLWG recognized Delta outflow as potentially significant pathway for contaminants Identified as a high priority information gap Study initiated in 2002 Background Item #4

*Contingency money used (15 samples) Samples Collected Item #4

370,000 cfs Delta Outflow from 12/20/05 to 01/25/06 Item #4

Load Estimates Item #4

Slope 0.22 Slope Low Flow Slope Tidal High Flow - Item #4 SSC – Hg Relationships Influence Loads

PCB Loads and Allocations Item #4

Hg Loads and Allocations Item #4

Sampling Budget Example 5–6 Storms 40 samples for Hg, PCBs, and sediment $35, samples for Hg speciation (HgD, MeHgT, MeHgD, Hg(II)) $10,000 Lab Total $45,000 Field Labor $25,000 Project Management + Reporting $30,000 Overall $100,000 Item #4