Bay Sediment Budgets: Sediment Accounting 101 David Schoellhamer Megan Lionberger Bruce Jaffe Neil Ganju Scott Wright Greg Shellenbarger U.S. Geological.

Slides:



Advertisements
Similar presentations
Denise Reed Pontchartrain Institute University of New Orleans
Advertisements

AN OVERVIEW Jay A. Davis San Francisco Estuary Institute.
Introduction of Version 2.0b Significant changes to sediment model –Box volumes are no longer static. –Net sedimentation is constrained by box geometry.
4.26 CEP/RMP Sediment Core Plan Draft & Comments CFWG Sept 2005.
1 WATERSHED SPECIFIC AND REGIONAL SCALE SUSPENDED SEDIMENT LOAD ESTIMATES FOR BAY AREA SMALL TRIBUTARIES Mikołaj Lewicki and Lester McKee Sources Pathways.
Developing Water Quality Solutions for SF Bay
Suspended Sediment Loads from Bay Area Small Tributaries Mikolaj Lewicki and Lester McKee Sources Pathways and Loading Workgroup May 14 th 2008 Item #3a.
Pollutant Loads to the Bay: Measuring the L in TMDL Lester McKee Sources Pathways and Loadings Workgroup and Watershed Program Manager SFEI RMP Annual.
Regulatory Update Carrie Austin, SF Bay Water Board Michelle Wood, CV Water Board.
Sediment Dynamics Drive
Progress in Estimating Loads at Mallard Island Nicole David Lester McKee Item #4.
The Effect of the Changing Dynamics of the Conowingo Dam on the Chesapeake Bay Mukhtar Ibrahim and Karl Berger, COG staff Water Resources Technical Committee.
Dredging the Chesapeake Bay The 1999 Debate Heather Beall Intro to Coastal Management November 4, 2004.
Summary of my Suspended Sediment Transport Research in San Francisco Bay David Schoellhamer U.S. Geological Survey.
San Francisco LTMS : Accomplisments And New Challenges SFBJV, March 29, 2011.
Sediment Happens! It’s cleaning it up that’s difficult ESI.
Engineering Hydrology (ECIV 4323)
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Environmental Fluid Mechanics Laboratory
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
“Its All About the Sediment”
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Sand Transport in the San Francisco Bay Coastal System Patrick Barnard 1, Daniel Hanes 1, Li Erikson 1, Sand Transport in the San Francisco Bay Coastal.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
Water Sources and Pollution. Where does our water come from? It comes from 2 sources: 1.Surface water: above ground in lakes and rivers. –Most large cities.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Eric Mohler GIS 582 Spring 2012  Morro Bay is a natural embayment located in San Luis Obispo County, California. A natural sandspit protects the harbor.
Period 3 Kiana Brayton Lyle Swallows
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
J. Toby Minear and Scott Wright California Water Science Center
U.S. Department of the Interior Minerals Management Service Capital Hill Oceans Week Renee Orr Chief, Leasing Division Minerals Management Service Herndon,
Bed-sediment grain-size change, and implications for sediment management David M. Rubin 1, David J. Topping 2, Henry Chezar 3, Brian Lockwood 4, James.
Module 10/11 Stream Surveys Stream Surveys – February 2004 Part 1 – Water Quality Assessment.
Bonneville Spillway Flow Discrepancy TMT – August 4 th 2004 Laurie Ebner Hydraulic Engineering – Portland District US Army Corps of Engineers.
Linda C. Schaffner AIWA Conference November 18, 2010.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Historical Sedimentation in the San Francisco Estuary Bruce Jaffe 1, Theresa Fregoso 1, Amy Foxgrover 1, Shawn Higgins 2 1 United States Geological Survey.
InVEST Analysis Lafarge Ecosystem Services Project Avoided Reservoir Sedimentation Results Lafarge Presque Isle Quarry.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
200+ Years of Global Dam Development Each point on the globe represents one of 6,000+ dams built from Dams impact the hydrological cycle and.
A Watershed Year for RMP & CEP: Sources Pathways & Loadings 2002/03 Lester McKee & Jon Leatherbarrow May 2003.
Engineering Hydrology (ECIV 4323)
Advisory Committee on Water Information Streamgaging Task Force Charge: Determine the streamflow information needs of the Nation, identify the optimal.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
1 Columbia River Sediment Supply and Dredging Volumes David A. Jay Department of Environmental Science and Engineering, Oregon Graduate Institute.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Trends in Sediment Delivery from Bay Area Watersheds determined from sediment budget analysis Peter W. Downs Stillwater Sciences, Berkeley, CA.
1 Richard Looker 2008 RMP Annual Meeting October 7, 2008 The Water Board’s Regulatory Approach and the RMP Mercury Strategy Hg.
U.S. Department of the Interior U.S. Geological Survey Sandbars and Floods in Grand Canyon: Current Research and Monitoring Paul Grams, USGS.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Rivers and Streams. River Systems A river or stream: any body of water flowing downhill in a well defined channel A river or stream: any body of water.
1. Digital Map from Dr. William Bowen California State University Northridge Sacramento- San Joaquin Delta San Joaquin River Sacramento River Suisun Bay.
What is Erosion and How is it Different than Weathering  Weathering is the breaking down of rock into smaller pieces.  Erosion is the MOVEMENT of these.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Waves and Wind Section Review. What is the source of the energy in ocean waves? EEEEnergy is transferred to ocean waves from wind.
Sea Floor Maps - Why do we care? Fisheries management, especially marine protected areas Characterization of benthic habitats and ecosystems.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Sources, Pathways, and Loadings Regional Monitoring Program for Trace Substances Annual Meeting, March 23 rd 2002 Lester McKee Watershed Program Manager.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
Engineering Hydrology (ECIV 4323)
Galveston Bay Bottom Ecosystem System Features
Mississippi River Hydrodynamic and Delta Management Study
SETAC North America 28th Annual Meeting
Engineering Hydrology (ECIV 4323)
Engineering Hydrology (ECIV 4323)
Presentation transcript:

Bay Sediment Budgets: Sediment Accounting 101 David Schoellhamer Megan Lionberger Bruce Jaffe Neil Ganju Scott Wright Greg Shellenbarger U.S. Geological Survey NASA

A sediment budget describes the quantity of sediment Entering the Bay Leaving the Bay Depositing in or eroding from the Bay

Who cares? Dredgers: disposal of deposition in ports and channels Regulators and dischargers: sediment associated contaminants and TMDLs Restoration managers: deposition needed for restoration without eroding existing habitat

Accounting rules Where: SF Bay from Mallard Island to Golden Gate When: Water years , , and a normal water year Lifeline: Conservation of mass: inflow-outflow=change in storage Uncertainty: varies by term, Not THE answer – Steve Ritchie

Odgen Beeman and Krone

New information for TermOBKNew information Supply from DeltaNo deposition in Delta Delta sediment outflow 1/3 of inflow Bathymetric change Data from navigation charts Data from actual surveys Sand miningAssumed zeroRough estimate

Revised annual budget Units are mass in millions of metric tons per year (~1.5 Mcy)

Revised annual budget Assume Krone Central Bay deposition is ocean sand

Revised annual budget Suspended sediment outflow from conservation of mass (lifeline)

Revised annual budget Sand mining is a very rough estimate

annual budget

Box model used to get change in storage and outflow

annual budget Assume no change in supply of ocean sand

was all wet

Normal annual budget Remove water years 1995 and 1998 where possible

Implications Sediments disposed of in the ocean may be needed to maintain and restore Bay habitats The Bay bottom will continue to erode and supply legacy contaminants Restoration sites will be depositional and may increase erosion elsewhere Dredging, restoration, and water quality are connected by the sediment budget

Most important and most uncertain terms Golden Gate fine suspended sediment outflow (model because difficult to measure) Golden Gate sand supply, MMT/yr (Central Bay bathymetric change) Eroded mass (new surveys, measure bed density) Sediment supply from watershed (±25%)

Acknowledgements U.S. Army Corps of Engineers SF Regional Water Quality Control Board California State Coastal Conservancy USGS Priority Ecosystem Science Program USGS Federal/State Cooperative Program Lester McKee Patricia Chambers and Linda Wanczyk