Zone 4 Line A Preliminary Suspended Sediment Load Estimates HY08 Rand Eads RiverMetrics LLC 503-435-7516 Sources.

Slides:



Advertisements
Similar presentations
Water Quality in the Caddo Lake Watershed Caddo Lake Water Quality Cypress Creek Clean Rivers Program.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Fill in missing numbers or operations
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
6th International Conference on Estuarine and Coastal Modeling SESSION 2B.2 The Importance of Sediment Transport Modeling for Assessing the Fate of Toxic.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
1 Trace element loads in urbanized watersheds and the potential for treatment of NPS loads Lester McKee Sources Pathways and Loadings Workgroup May 22.
Mercury Transport to San Francisco Bay through the Sacramento-San Joaquin River Delta. Nicole David, Lester J. McKee, Jon E. Leatherbarrow December 15,
Sources Pathways and Loadings Workgroup
Progress in Estimating Loads at Mallard Island Nicole David Lester McKee Item #4.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 2008 Lester McKee 1, Alicia Gilbreath.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Convert feet to inches 2 feet = 24 inches 40 inches 24 inches simplify ÷
1 1  1 =.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
ZMQS ZMQS
Strategy 1 – Infrastructure QB.1 Utilize internal construction management services for 75% of projects falling under the formal State/County monetary thresholds.
Break Time Remaining 10:00.
The basics for simulations
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
Teds Big Boy Restaurant 5000 People were surveyed to determine if there is enough demand for a new Teds Big Boy Restaurant in the west side of town.
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
Look at This PowerPoint for help on you times tables
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Progressive Aerobic Cardiovascular Endurance Run
We are learning how to read the 24 hour clock
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Subtraction: Adding UP
Test B, 100 Subtraction Facts
: 3 00.
5 minutes.
Numeracy Resources for KS2
AS "PrivatBank" Main Figures as of 11 Months of 2008.
Analyzing Genes and Genomes
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
PSSA Preparation.
“Reading Measurement Scales”. MNI = marked number interval AMI = adjacent number interval.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Graeme Henchel Multiples Graeme Henchel
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
1 Zone 4 Line A Rand Eads RiverMetrics LLC Sources Pathways and Loadings Workgroup May 14, 2008.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 6 th 2010 Rand Eads RiverMetrics.
Presentation transcript:

Zone 4 Line A Preliminary Suspended Sediment Load Estimates HY08 Rand Eads RiverMetrics LLC Sources Pathways and Loadings Workgroup December 8, 2008 Item # 2b

Zone 4 Line A HY07 11/10/06 – 4/30/07 Rainfall in. 21 storms Max Q 308 cfs Total Q 33,400 cfs 84 SSC analyzed Max SSC 2,744 mg/L Max turbidity 1590 TU Est. load MT HY08 1/31/08 – 6/11/08 Rainfall 2.11 in. 18 storms Max Q 241 cfs Total Q 22,900 cfs 66 SSC analyzed Max SSC 2,095 mg/L Max turbidity 892 TU Est. load 94.7MT Item # 2b

Changes in Data Collection Methods from HY07 to HY08 Bed-mounted boom provided complete data record for season Turbidity sensor and sampler intake at depth-proportional sampling position Improved debris shedding Possible increase in sand to fine ratio Item # 2b

r 2 = 0.89 r 2 = 0.90 r 2 = 0.89 Item # 2b

0.14

Item # 2b 0.12

Item # 2b 0.38

Item # 2b 0.12

Storms account for ~95% of the seasonal load Item # 2b

Zone 4 Sampling HY09 9 rising turbidity thresholds ( ) 6 falling turbidity thresholds (925 – 100) Early season contaminate rising thresholds: 105, 319, 670, 970 Mid season contaminate rising thresholds: 72, 220, 462, 670 Item # 2b